Alcator C-Mod Run 1120105 Information

Back to runs

Miniproposals
Miniproposal:355c
Date Filed: 9/2/2011
Title:ICRF Testing and Conditioning, with detection of mode-conversion location
First Author:Steve Wukitch
Session Leader:Yijun Lin (shots 1-34)

Operators
Session leader(s):Yijun Lin
Physics operator(s):Steve Wolfe,Steve Wukitch
Engineering operator(s):Roza Tesfaye,Bill Parkin,Ed Fitzgerald

Engineering Operator Run Comment
MP355C ICRF Testing and Conditioning. SL: Y. Lin, PO: S. Wukitch

Session Leader Plans
Entered: Jan 5 2012 08:31:55:250AM
Author: Yijun Lin
Stack all antennas.

Condition the antennas to high voltage into H-mode plasmas in LSN configuration.

Also condition the machine in USN configuration.

Physics Operators Plans
Entered: Jan 4 2012 05:03:36:967PM
Author: Steve Wukitch
MP355C ICRF Testing and Conditioning
SL: Y. Lin
PO: S. Wukitch

-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1120104036

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
Leave H-bot as is D2 Hybrid DISABLED (PG5)
DO NOT fill B-div, Hybrid DISABLED (PG6)
DO NOT fill H-div, Hybrid DISABLED (PG7)
Leave NINJA as is, DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus + LoWEUS
Z-bolo shutter should be closed unless requested by physop

Check with the physop before opening other diagnostic gate-valves or shutters.

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): YES
ICRF(yes/no): yes -- FMIT#1,#2,#4
LH(yes/no): no power requested, but LH-SOL reflectometer will be used.
Cryopump (yes/no): no
DNB (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

==================================

Tentative plan:
Load startup (seg 1) and seg 2 from 1120104036 then move to USN for 1120104032 (seg 3 turned on)

Proceed with Session Leader plan to stack antennas and evaluate machine/antenna conditioning.

Session Leader Summaries
Entered: Jan 10 2012 09:44:11:660AM
Author: Yijun Lin
All antennas have been successfully run in to H-mode plasmas. We have also put serious RF power to the upper part of the machine in upper-single-null plasmas to condition up the machine.

The H/(H+D) level started the day about 10%, and then rose above 20% later.

D and J antennas have been good all day.

E antenna developed serious problems after shot 3. We believe somewhere in the transmission line has been arcing. Based on past experience, the arcing is likely happening at a Teflon supporting piece in the unmatched section of the transmission line. It is under further investigation.

on 1120109, after opening the transmission line, we found broken ferrite tiles and debris inside FFT tuner #2. this has to be the cause of the degraded performance.

(late investigation on the FFT arc from the digitized signals found the first FFT arc occurs on 1120104010)

Physics Operator Summaries
Entered: Jan 5 2012 05:11:47:873PM
Author: Steve Wukitch
We started the day running LSN discharges with all antennas stacked.
The machine operated relatively well and the H/H+D increased to
15-20%. In USN, we had to avoid excess power on the inner corner tile
so we moved ZXU up 1 cm relative to its previous position. We chose
this path instead of RXU because we were concerned about hitting the
cryopump slot with the strike point. We also had relatively large
n/ncrit and confirmed discharges were disrupting as a result. Since
the outer gap was already 1.5 cm, ZXL was made more negative to reduce
the plasma elongation. As explained by B. Granetz, the farther the
x-point is from the plasma the more rounded or squat the plasma.
Stability was also improved by raising ZCUR by 0.5 cm and could
probably go farther. This USN discharge's vertical stability could be
further improved by reducing the outer gap or increasing the plasma
current. Compared to LSN, USN discharges appear to be dirty as
evidence by the poor recovery from disruptions.

Session Leader Comments
Jan 5 2012 08:47:41:327AM1120105001Yijun Lin2 MW flat RF. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.
Jan 5 2012 09:09:38:940AM1120105001Yijun Lin2 MW flat RF. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.
result: all antennas ran without fault. H-modes on-and-off. H/(H+D) to 15% later in the pulse.
Next: raise power on all antennas (total 2.8 MW)
Jan 5 2012 09:23:28:457AM1120105002Yijun Lin2.8 MW flat RF. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.

result: H-modes. H/(H+D) to 16% later in the shot.
Next: raise J power.
Jan 5 2012 09:36:23:000AM1120105003Yijun Lin3.3 MW flat RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.

result: H-modes. H/(H+D) to 25% later in the shot.

Next: Lower E power a little.
Jan 5 2012 09:50:53:660AM1120105004Yijun Lin3. MW flat RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.

result: H-modes.

H/(H+D) is now 16%?? lower than last shot.

Next: Lower D and E power slightly. Raise J. total 3 MW.
Jan 5 2012 09:58:15:697AM1120105005Yijun Linfizzle.
Jan 5 2012 10:16:20:373AM1120105006Yijun Lin3. MW flat RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.

result: H-modes.
E port did not run well.

H/(H+D) is 20%?

Next: separate D and E.
Jan 5 2012 10:29:03:763AM1120105007Yijun Lin2.0 MW flat RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.

result: L-mode

density was too high...and D/E failed at high neutral pressure.
But J stayed on...

H/(H+D) ~ 20%

Next: repeat.
Jan 5 2012 10:42:40:893AM1120105008Yijun Linfizzle
Jan 5 2012 10:56:40:090AM1120105009Yijun Lin2.0 MW flat RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.

result:

E did not run well (fft setpoint too far).
H/(H+D) ~ 10%

Next: repeat.
Jan 5 2012 11:14:31:507AM1120105010Yijun Lin2.0 MW flat RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.

result:

E did not run well. Need to try a few more shots and see whether it can run with J.
H/(H+D) ~ 13%

Next: Lower E power slightly.
Jan 5 2012 11:28:48:803AM1120105011Yijun Lin2.0 MW flat RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma requested.

result:

E had a lot of faults.

H/(H+D) ~ 13%

Next: Shorten J pulse, and see if E can run itself near the end.
Jan 5 2012 11:45:11:567AM1120105012Yijun Lin2.0 MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma.

result:

E still had a lot of faults.

H/(H+D) ~ 13%

Next: Let E run alone and lower power.
Jan 5 2012 12:09:59:107PM1120105014Yijun Lin2.0 MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma.

result:

E started arcing above 0.5 MW....

H/(H+D) ~ 13%

Next: Let E run...it will recover after some number of shots...
Jan 5 2012 12:24:21:443PM1120105015Yijun Lin2.0 MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma.

result:

E started arcing above 0.5 MW....

H/(H+D) ~ 13%

Next: raise E power slightly.
Jan 5 2012 12:36:24:867PM1120105016Yijun Linfizzle
Jan 5 2012 12:52:44:777PM1120105017Yijun Lin2.0 MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma.

result:

E was still faulting.

H/(H+D) ~ 17%

Next: Move E in the beginning, and run D+J later.
Jan 5 2012 01:03:43:430PM1120105018Yijun Lin2.0 MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma.

result:

E was still faulting.

H/(H+D) ~ 17%

Next: repeat.
Jan 5 2012 01:17:00:747PM1120105019Yijun Lin2.0 MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
LSN plasma.

result:

E was still faulting above 0.5 MW.

H/(H+D) ~ 14%

Next: to USN plasmas for machine conditioning.
Jan 5 2012 01:29:03:067PM1120105020Yijun Lin2.0 MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
USN plasma.

result:

E was still faulting above 0.5 MW.

H/(H+D) ~ 14%

Next: Raise D and J power.
Jan 5 2012 02:00:11:430PM1120105021Yijun Lin2.5 MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
USN plasma.

result: disruption.

E was still faulting above 0.5 MW.

H/(H+D) ~ 14%

Next: lower D/J power.
Jan 5 2012 02:12:24:547PM1120105022Yijun Linfizzle
Jan 5 2012 02:24:32:450PM1120105023Yijun Linfizzle. 2 in a row.
Jan 5 2012 02:38:56:573PM1120105024Yijun Linfizzle. 3 in a row...
Jan 5 2012 03:11:49:890PM1120105025Yijun Lin2 MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
USN plasma.

result:

E was still faulting above 0.5 MW.

H/(H+D) ~ 18%

Next: repeat.
Jan 5 2012 03:11:42:197PM1120105026Yijun Lin2. MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
USN plasma.

result:

E is faulting all the time....getting worse...will it get better?

H/(H+D) ~ 20%

Next: repeat.
Jan 5 2012 03:37:05:847PM1120105027Yijun Lin2.MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
USN plasma.

result:

E is faulting all the time, but better than previous two shots (it goes to higher power...)

H/(H+D) ~ 20%

Next: effectively disabling FFT on E port by raising the power threshold. check whether this can help.
Jan 5 2012 03:34:48:417PM1120105028Yijun Linshort plasma.
Jan 5 2012 03:53:33:877PM1120105029Yijun Lin2.MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
USN plasma.

result:

E is worse...FFT by-passed...

H/(H+D) ~ 20%

Next: lower E power. shorten D and J...
Jan 5 2012 04:02:16:987PM1120105030Yijun Linfizzle
Jan 5 2012 04:22:55:123PM1120105031Yijun Lin2.MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
USN plasma.

result:

E is worse....
test shot to dummy load, result good...

Next: same power level.
Jan 5 2012 04:36:01:560PM1120105032Yijun Linfizzle.
Jan 5 2012 04:49:51:717PM1120105033Yijun Lin2.MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
USN plasma.

result:

E is worse....and it is broken.

based on today's experience, I suspect that a Teflon part in the transmission line from the ferrite tuners to the antenna has carbonized.

We need to decide whether we need to do vacuum test and check where it is first or just open the transmission line and look for the problems.

Next: repeat.
Jan 5 2012 04:58:57:143PM1120105034Yijun Lin2.MW RF demand. Antennas stacked from 0.6 to 1.5 sec.
USN plasma.

result:

E is broken. need to be investigated further and repaired.

Physics Operator Comments
Jan 5 2012 08:51:49:293AM1120105001Steve Wolfe
Shot#1: Wukitch is running late, so I may be starting off as Physics
Operator. 
Yijun clarifies the statement in the PO_PLan: They want to start
with LSN as on the last shot 1120104036 (seg2) and then proceed to
USN (in segment 3, as on 1120104032) after a few shots. They will 
be overlapping the transmitter waveforms. 

Load from 1120104036, confirm that Seg2 is on (LSN)
Seg1 has 
17msec PG4 puff - leave it, but adjust slightly non-zero
                   point at -.518 back to 0.0
PG3 has 30msec plateau from -.001 to .1sec. Bring it up to 40V from
                   .001 to .04, then down to 30V (no good reason, I want
                    to see if it slows the current rise too much)
BR_0=+.001 offset - leave it, seems good.
IC_EF4U = -1310A  - Seems a little negative, but leave it for now
RCUR offset = 3000A-m - leave it. 

Seg2 has a rather late CLEARIN rise, reaching final at [.426,-.001]
Not sure if Greg had delayed this after going back to LSN later in 
the run yesterday or not. Leave it, no need for earlier divert. 

Holding off on loading (and signing in) until 08:50 anyway,
see if Steve makes it in. Alternator seems a little slow coming up, only at 1567 at 08:45. 

Ok, sign in and load:
Load at  5-Jan-2012 08:51:24.00
Open tree /home/wolfe/pcs_scratch      -1
Open tree done

               

Jan 5 2012 09:04:37:737AM1120105001Steve Wolfe
Shot#1: Plasma full length, some early runaways
Wukie is here and will take over from next shot. 
               

Jan 5 2012 09:16:12:013AM1120105001Steve Wukitch001 reload from 1120104034 using segment 2
see previous note for setup

result: plasma with ratty H-modes
2 MW ICRF for 0.9 s
H/H+D started at 10% and climbed to 15%

next: raise target density to 7.5x10^19 and RF power to 2.8 MW
Load at 5-Jan-2012 09:12:21.00

Jan 5 2012 09:30:38:793AM1120105002Steve Wukitch002 request: 5.4 T, Ip=0.8 MA, nl04~7.5

result: plasma into rampdown; multiple H-modes
current rise is a little slow
next: enable Ar (B-side lower; pg1)
reduce pg3 from 40 V to 30 V from t=0-0.1

Jan 5 2012 09:38:59:910AM1120105003Steve Wukitch003 request: 5.4 T, Ip=0.8 MA, nl04~7.5

result: plasma into rampdown; multiple H-modes
current rise is still a little slow
next: reduce pg3 from 30 V to 15 V from t=0-0.1
raise target density to nl04~0.9
Load at 5-Jan-2012 09:38:21.00

Jan 5 2012 09:54:36:573AM1120105004Steve Wukitch004 request: 5.4 T, Ip=0.8 MA, nl04~9

result: plasma into rampdown; early H-mode
E antenna is having trouble
current rise is better
next: repeat

Jan 5 2012 10:08:48:110AM1120105005Steve Wukitch005 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: fizzle
breakdown is about the same as previous 3 shots
initial density and current rise are reasonable
H-alpha shows spike at 0.019 prior to current quench
Tang. Z-meter and CII also show spike
suggests an ill timed speck of dirt??

next: repeat

Jan 5 2012 10:35:34:690AM1120105007Steve Wukitch007 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
density ran away
next: repeat
reduce integral gain to nl04 gain=1 and apply gain for shorter window 0.4-0.7 s
Load at 5-Jan-2012 10:34:40.00

Jan 5 2012 10:48:12:610AM1120105008Steve Wukitch008 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: fizzle - high density disruption during rampdown on previous shot may have left too much gas around

next: repeat

Jan 5 2012 11:03:14:947AM1120105009Steve Wukitch009 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
density is bit high during rampdown

next: pg3 at 10 V 0.2-0.3 s
pg3 at 20 V 0.4-0.6 s
turn off demand at 1.2 s
turn off integral gain


Jan 5 2012 11:21:29:927AM1120105010Steve Wukitch010 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
density is better during rampup and rampdown

next: pg3 to 15 V 0.2-0.3 s
pg3 at 30 V 0.4-0.6 s

Jan 5 2012 11:31:37:827AM1120105011Steve Wukitch011 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
density is better during rampup and rampdown

next: pg3 to 20 V 0.2-0.3 s
Load at 5-Jan-2012 11:30:40.00

Jan 5 2012 11:46:27:283AM1120105012Steve Wukitch012 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
early H-mode, H/H+D~14%

next: pg3 to 20 V 0.2-0.4 s
Load at 5-Jan-2012 11:45:34.00

Jan 5 2012 11:57:11:053AM1120105013Steve Wukitch013 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
current ramp is slowing

next: pg3 ramp 20-30 V 0.2-0.4 s seg 2
pg3 reduce to 10 V 0-0.1 s in seg 1
Load at 5-Jan-2012 11:56:31.00

Jan 5 2012 12:16:40:577PM1120105014Steve Wukitch014 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
current ramp is better
density is still overshooting at 0.4 s

next: pg3 ramp 20-25 V 0.2-0.35 s in seg 2
Load at 5-Jan-2012 12:15:04.00

Jan 5 2012 12:29:00:640PM1120105015Steve Wukitch015 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
H-modes
density is still overshooting at 0.4 s

next: another tweak to pg3 in seg 2: 0.2-0.25 s 20-25 V; 0.25-0.35 @
25 V; 0.35-0.4 @20 V;0.4-0.45 ramp to 30 V and hold at 30 V to 0.6

Load at 5-Jan-2012 12:25:57.00

Jan 5 2012 12:46:25:780PM1120105016Steve Wukitch016 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result:fizzle - breakdown looks good
next: retry

Jan 5 2012 12:51:39:583PM1120105017Steve Wukitch017 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
multiple H-modes
density is still overshooting at 0.4 s

next: tweak pg3 feed forward in seg 2: 0.35-0.4 @10 V
Load at 5-Jan-2012 12:49:23.00

Jan 5 2012 01:12:35:597PM1120105018Steve Wukitch018 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
multiple H-modes
density is still overshooting at 0.4 s
early hard x-rays? current rise similar to previous shot

next: tweak pg3 feed forward in seg 2: 0.35-0.4 @0 V

Jan 5 2012 01:20:05:937PM1120105019Steve Wukitch019 request: 5.4 T, Ip=0.8 MA, nl04~9, LSN

result: plasma into rampdown
density is still overshooting at 0.4 s
no early hard x-rays

next: USN switch seg 3 on and seg 2 off
in seg 3 nl_04 set to 7.5 and some feedforward in pg3

Jan 5 2012 01:30:16:320PM1120105020Steve Wukitch020 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: plasma into rampdown

next: repeat

Jan 5 2012 01:40:12:043PM1120105020Steve Wukitchsuspect an air leak

torus pressure on the 10^-5 scale

investigating...
Jan 5 2012 02:23:01:747PM1120105022Steve Wukitch022 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: fizzled

next: retry
restore prepuff to 17 ms on pg4
nl04 target to 6x10^19
pg3 limited to 0.2-0.35 s @25V (removed 0.4-0.6 s puff)
move inner strike away from corner by moving ZXU up 1 cm
Load at 5-Jan-2012 14:16:23.00

Jan 5 2012 02:33:54:100PM1120105023Steve Wukitch023 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: fizzle
BR0 has become more positive by 0.5 mT

next: retry
ICEF4U from -1310 to -1300
Load at 5-Jan-2012 14:32:21.00

Jan 5 2012 03:00:27:130PM1120105024Steve Wukitch024 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: fizzle
reduce prepuff by 2 ms
next: retry

Jan 5 2012 03:00:36:560PM1120105025Steve Wukitch025 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: plasma into rampdown
bounced at 0.011 s
no early marfe
next: repeat

Jan 5 2012 03:12:11:720PM1120105026Steve Wukitch026 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: plasma into rampdown
still bounced at 0.011 s
ICEF4U from -1300 to -1290
next: repeat

Jan 5 2012 03:29:17:660PM1120105027Steve Wukitch027 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: plasma disrupted at 1.52 s
no bounced on the current rampup
raise ZXU by 1 cm late in discharge
lower pg4 1 ms - anticipating a fizzle
next: repeat
Load at 5-Jan-2012 15:29:04.00

Jan 5 2012 03:41:09:990PM1120105028Steve Wukitch028 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: early disruption 0.24 s
late bounce due to some dirt falling into the plasma
a brick at 0.24 s finished it
next: retry

Jan 5 2012 03:59:42:110PM1120105029Steve Wukitch029 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: disruption at 1.35 s - brick
reasonable startup
may be hitting elongation n/ncrit=1.1-1.2
ZXU = 2 from 3 cm
next: retry without disruption

Jan 5 2012 04:10:42:133PM1120105030Steve Wukitch030 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: fizzle - suspect dirt
after conferring with B. Granetz, 029 was vertically unstable
ZXL made more negative by 2 cm (pull x-point away - opposite of my intuition)
Load at 5-Jan-2012 16:10:06.00

Jan 5 2012 04:21:10:447PM1120105031Steve Wukitch031 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: plasma
ZXL correction kept plasma more vertically stable
make ZXL more negative by 1 cm to lower n/ncrit below 1.1 (pull x-point away)
Load at 5-Jan-2012 16:20:13.00

Jan 5 2012 04:35:44:950PM1120105032Steve Wukitch032 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: fizzle - suspect dirt again

next: increase pg4 by 1 ms
Load at 5-Jan-2012 16:32:40.00

Jan 5 2012 05:02:07:457PM1120105034Steve Wukitch034 request: 5.4 T, Ip=0.8 MA, nl04~7.5, USN

result: plasma into rampdown
n/ncrit is better but still could be improved

next: end of run

Jan 6 2012 09:06:31:893AM1120105034Bill Rowan001.
no power shot.
computer problems

Engineering Operator Comments
ShotTimeTypeStatusComment
109:01:55:013AMPlasmaOk
209:15:04:593AMPlasmaOk
309:28:44:557AMPlasmaOk
409:42:11:063AMPlasmaOk
509:55:35:630AMPlasmaOk
610:08:29:827AMPlasmaOk
710:22:02:223AMPlasmaOk
810:36:39:540AMPlasmaOk
910:49:39:457AMPlasmaOk
1011:07:07:493AMPlasmaOk
1111:21:55:353AMPlasmaOk
1211:35:46:403AMPlasmaOk
1311:49:06:033AMPlasmaOk
1412:02:47:240PMPlasmaOk
1512:15:53:487PMPlasmaOk
1612:29:06:043PMPlasmaOk
1712:42:14:863PMPlasmaOk
1812:55:11:767PMPlasmaOk
1901:08:45:650PMPlasmaOk
2001:22:26:710PMPlasmaOk
2101:54:03:780PMPlasmaOk
2202:08:46:367PMPlasmaOk
2302:22:11:077PMPlasmaOk
2402:34:40:120PMPlasmaOk
2502:50:05:437PMPlasmaOk
2603:02:38:493PMPlasmaOk
2703:18:43:353PMPlasmaOk
2803:32:03:233PMPlasmaOk
2903:44:56:990PMPlasmaOk
3003:58:36:720PMPlasmaOk
3104:12:23:860PMPlasmaOk
3204:26:31:477PMPlasmaOk
3304:41:47:653PMPlasmaOk
3404:54:15:363PMPlasmaOk

System Availability
Jan 5 2012 09:01:35:473AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 05 2011 02:41PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoDiodes are taking data, but system is not fully operational yet. Post-acquisition data processing code is not yet functional.Dec 02 2011 03:27PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes Dec 01 2011 11:46AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side Ratiomaticyes Dec 02 2011 12:24PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 05 2011 02:42PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 06 2011 08:21AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS working with the shot cycle. Viewing Mo line-emission normally covered by McPherson. Raw data only in tree.Dec 01 2011 02:54PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 01 2011 11:51AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnonew turbo pump, installed, McP pumping down. Almost ready to open to machine.Dec 06 2011 12:16PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 02 2011 12:27PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno1/3/2011: push-pull mechanism broken. MSE inoperativeJan 03 2012 11:47AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 02 2011 12:28PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesOperational. High voltage comes on during INIT and off at RECOOL.Dec 09 2011 09:48AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational, except for probe #1 (open circuit) and probe #16 (not installed).Dec 09 2011 09:50AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational, except for bottom-D probe (open circuit).Dec 09 2011 09:52AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF-divertor ok. J-divertor ok, except for JDIV_06 which is shorted out.Dec 09 2011 09:54AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational except for probes #4, 5 and 13 (open)Dec 09 2011 09:56AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesStarting on 1111215009, the 50, 60 75, 88l and 88u are online. The 112, 140 and variable are still disconnected.Dec 15 2011 10:53AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesIon Sensitive Probe head installed. Testing in piggy-back mode.Dec 20 2011 12:33PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Dec 09 2011 09:57AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP is operational. K-port WASP is dead (all probes melted together).Dec 09 2011 09:58AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesPassive mode onlyDec 13 2011 02:48PM (g)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS working with the shot cycle. Viewing low-Z emission.Dec 01 2011 02:55PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Jan 5 2012 09:14:51:613AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. Magnetron UnpluggedApr 11 2011 09:51AM (dekow)Jim IrbyBoronizationdekow,irby
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoShut down. Helium dewar removed. LN2 manual valve closed/ red-tagged and solenoid valves are closed Apr 15 2011 10:55AM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 05 2011 02:41PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoDiodes are taking data, but system is not fully operational yet. Post-acquisition data processing code is not yet functional.Dec 02 2011 03:27PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes Dec 01 2011 11:46AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
G-Side Ratiomaticyes Dec 02 2011 12:24PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 05 2011 02:42PM (marmar)Earl MarmarH/D Ratiomarmar
HEATnoBreakers off and red taggedApr 14 2011 11:27AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 06 2011 08:21AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffnoBeamline disconnectedApr 14 2011 11:53AM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS working with the shot cycle. Viewing Mo line-emission normally covered by McPherson. Raw data only in tree.Dec 01 2011 02:54PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 01 2011 11:51AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnonew turbo pump, installed, McP pumping down. Almost ready to open to machine.Dec 06 2011 12:16PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 02 2011 12:27PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno1/3/2011: push-pull mechanism broken. MSE inoperativeJan 03 2012 11:47AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 02 2011 12:28PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesOperational. High voltage comes on during INIT and off at RECOOL.Dec 09 2011 09:48AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
PolarimeternoSafe for Machine EntrySep 14 2007 12:17PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air SwitchnoRed tagged offApr 12 2011 07:23AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEInoBreaker opened and red taggedApr 11 2011 11:59AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXnoBreakers opened and red taggedApr 11 2011 12:00PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power SystemsnoAll systems disabled for in-vessel entryApr 14 2011 11:29AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational, except for probe #1 (open circuit) and probe #16 (not installed).Dec 09 2011 09:50AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational, except for bottom-D probe (open circuit).Dec 09 2011 09:52AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF-divertor ok. J-divertor ok, except for JDIV_06 which is shorted out.Dec 09 2011 09:54AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational except for probes #4, 5 and 13 (open)Dec 09 2011 09:56AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120105xxx, all channels are connectedJan 05 2012 09:14AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesIon Sensitive Probe head installed. Testing in piggy-back mode.Dec 20 2011 12:33PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Dec 09 2011 09:57AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP is operational. K-port WASP is dead (all probes melted together).Dec 09 2011 09:58AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesPassive mode onlyDec 13 2011 02:48PM (g)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS working with the shot cycle. Viewing low-Z emission.Dec 01 2011 02:55PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Jan 5 2012 11:00:39:220AM
Turned on ENI RF Power amplifier in preparation for low-power tests into plasma before this shot during cell access. The ENABLE switch is currently off - its state is defined by Channel 5 in the Ethernet-controlled power strip in the AMHD (Togo) rack.