Alcator C-Mod Run 1120119 Information

Back to runs

Miniproposals
Miniproposal:605
Date Filed: 6/10/2010
Title:LH2 lower hybrid launcher checkout and conditioning
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 1-17)

Operators
Session leader(s):Greg Wallace
Physics operator(s):Ron Parker
Engineering operator(s):Bill Parkin,Andy Pfeiffer,Gary Dekow

Engineering Operator Run Comment
MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning

Session Leader Plans
Entered: Jan 18 2012 04:22:49:413PM
Author: Melanie Preynas
SL run plan for 19 Jan 2012

MP666 "Assessment of new limiter design and effects on LH wave coupling"

Objective:

The purpose of this experiment is to perform a systematic study how the new limiter configuration
affects the coupling performance of the LH2 antenna.
The first few shots will be devoted to reproducing the experimental results of the 2010-2011
campaign. Then the launcher will be pushed beyond the ICRF limiters and the new parameter
space will be explored. Dependency of reflection coefficient with injected LH phase is an
important marker for density depletion in front of the launcher. Power dependency as a function of
launcher radial position with respect to ICRF limiters is used to investigate the effects of different
temperature and density connection lengths on non-linear coupling. To allow direct comparison
with previous experiments, measurements with LH limiters located flush to ICRF limiters should
always be performed.

Gas request:
D2 majority fueling

Diagnostic request:

LH directional couplers
LH microwave probes
LH Langmuir Probes (swept mode)
LH visible camera
X-mode reflectometer
Core & edge Thomson scattering
Reciprocating Langmuir probes
HXR camera
GPC/2 set to 5.4T
XTOMO arrays
Ionization

Run plan:

Four kinds of experimental scans are proposed acting on the LH2's edge density, RF phasing and power. Each of these scan must be made at different launcher positions. In order to guaranty the same launcher positions for each scan (for reliable comparisons) and to optimize the number of pulse of the experimental day, it is proposed to make all the four scans for a given launcher
position, then to move the launcher to the next position.

Moreover, it is proposed to start with the best coupling conditions (e.g. +2.0mm), and then move the launcher to positions where the coupling is expected to be degraded.

The launcher positions to be tested are:
. 2.0 mm in front of ICRF limiters (2mm behind GH limiter);
. flush to ICRF limiters (4mm behind GH limiter, same as 2011 campaign);
. 5.0 mm behind the ICRF limiters (9mm behind GH limiter).

I. Density scan at low power [6-9 shots]

-1st launcher position : 5.0 mm behind the ICRF limiters (9mm behind GH limiter)

1.a Density scan: [1-2 shots] Repeat of shot 1100818004, adjusting gas puffing to cover a broad range of densities at the grill (ideally below cutoff to ~10 times cutoff density). Low power LH (200 kW), 90° degrees phasing.

1.b Repeat 1.a with 70° degrees phasing [1-2 shots].

-2nd launcher position: 2.0 mm in front of ICRF limiters (2mm behind GH limiter);

2.a Density scan: [1-2 shots] Repeat 1.a.

2.b Repeat 2.a with 70° degrees phasing [1-2 shots]if possible... (enough time for the end of the mp: increase the LH power by doing different steps?)

-3rd launcher position: flush to ICRF limiters (4mm behind GH limiter, same as 2011 campaign);

3.a Density scan: [1-2 shots] Repeat 1.a.

3.b Repeat 3.a with 70° degrees phasing [1-2 shots]if possible... (enough time?)

II. LH Power steps [3-6 shots]:

For 90 degrees phasing and measured LH probe of 1 to 3x1018m-3 (in absence of LH power ), perform power ladder in 4 steps of 50ms of LH power: [200kW ; 300kW ; 400kW ; 450-500kW(?)] (if these levels of power are possible...)and 50% duty cycle each. 90° degrees phasings

-1st launcher position: 5.0 mm behind the ICRF limiters (9mm behind GH limiter)

-2nd launcher position: 2.0 mm in front of ICRF limiters (2mm behind GH limiter);

-3rd launcher position: flush to ICRF limiters (4mm behind GH limiter, same as 2011 campaign);

Reference shot : 1100818004 (LSN 5.4T, 700kA, Ne04 scan from 0.4 to 0.8e20, 1120117014 may be used as recent LSN.

Entered: Jan 18 2012 04:34:52:707PM
Author: Greg Wallace
Session leader plan for 1120119
Session Leader: G. Wallace
Physics Operator: R. Parker
MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning

LH Setup: Launcher 5 mm behind GH limiter (1306 counts on PLC); 60, 90, 120 degree current-drive phasing; 100-200 kW net power (~40 kW/klystron); LH on from 0.7 to 1.2s.

Reference shot: 1120117014. Change nl_04 to ~ 5e19, Ip to 700 kA.

Shot Plan:
Pulse LH system into dummy loads until full length plasmas become available.

1) Begin with co-current 90 degree ideal phasing; disable CPS; set LH2 launcher to 5 mm behind GH limiters. Establish operations at ~40 kW/klystron, 6x20 ms picket fence pulses with bypassed CPS. Adjust launcher position if necessary to get reasonable reflection coefficients (REFCO<0.3). (3 shots)

2) Enable CPS. Vary plasma density during pulse (ramp nl04 from ~3-8e19) to test operating range. Reset CPS trip points as necessary (should not require cell access unless new trip level is above 50% reflected power). RINT10 trip level will probably need to be reset since magic-T on klystron 10 was removed. Repeat shots to verify new trip points. (3-5 shots)

4) Take shots at 60, 90, 120 current drive phasing to verify operation at a range of n|| (3 shots)

5) Increase pulse length at low power (40-50 kW/klystron) to 0.5 s; verify proper operation of CPS. (3 shots)

Physics Operators Plans
Entered: Jan 18 2012 04:40:41:473PM
Author: Ron Parker
====================================
Physop Plan for Thursday, 19-Jan-2012
====================================
MP 605 LH2 Lower hybrid Launcher and Conditioning
MP 666 Assessment of new limiter design and effects of LH wave coupling

SL: Wallace (MP 605)
Meneghini/Preynas (MP 666)
PO: Parker

-----------------
Engineering Setup
-----------------

Run begins at 9:00 and ends at 17:00

Power systems as on: 1120117014

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
----------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
Fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
Leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
Fill H-bot with 15psi D2 Hybrid DISABLED (PG5)
DO NOT fill B-div, Hybrid DISABLED (PG6)
DO NOT fill H-div, Hybrid DISABLED (PG7)
fill NINJA with 10 psi Ne DISABLED

Gate-valves and shutters: Enable ECE, HiREX Sr, B spectrometer (Xeus and LoWEUS)
Z-bolo shutter should be closed unless requested by physop

Check with the physop before opening other diagnostic gate-valves or shutters.

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): YES
ICRF(yes/no): no
LH(yes/no): yes
Cryopump (yes/no): no
DNB (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

====================================
Physics Operator Plans:

The first, hopefully few, shots of the run will be used for checkout of the new TPS by running LH power into dummy loads.

We'll begin plasma operations with a vanilla shot from 1120117, namely shot 014 -- 800 kA, 5.4 T, LSN -- and use this shot as a target for LH launcher conditioning, MP 605. When reasonably good low power LH shots are achieved, e.g., ~ 200 kW with 0.5 s pulse width, we'll move on to MP 666.


====================================

Session Leader Summaries
Entered: Jan 19 2012 05:34:28:517PM
Author: Greg Wallace
Session leader summary for 1120119
Session leaders: G. Wallace and M. Preynas

LH Engineering Summary:
Today was the first plasma run day of the 2012 campaign for the LH system. This was also the first day of operations for the TPS upgrade. Overall the run was very successful despite a long delay to fix a vacuum leak. The new LH limiter seems to have somewhat reduced reflection coefficients, particularly on the extremes, which resulted in nearly fault free operation.

There were no TPS faults during the run today and very few CPS faults, mostly when the launcher was in its most retracted position. Moving the launcher in helped reduce the number of faults. Power was limited to about 300 kW due to lack of klystron calibration at higher beam voltage and also lack of time to push power higher.
Entered: Jan 19 2012 05:49:02:527PM
Author: Melanie Preynas
Good day of LH experiment! Thank you everybody!

8 good shots, we have increased the LH power up to ~300kW!

3 kind of shots:
- power ladder at constant power: 1120119003,8,9
- power ladder at different level of power: 12,16,17
- longer shots with constant power and three different phasings (60°, 90° and 120°): 13,14

We have moved the launcher closer to the plasma, from 5mm to 1mm behind the main limiter.

Low RC achieved, around 20% for few shots at high density: 9,12


Physics Operator Summaries
Entered: Jan 19 2012 05:08:30:947PM
Author: Ron Parker
From the Physop point of view, this was a straightforward run with essentially the same shot run throughout the day.

However one major problem developed, namely two fizzles occurred after shot 3, which prompted a look at the RGA. The latter revealed a sizable leak, with prominant lines at 14, 16, 28, 32 and 40 The base pressure hung up in the 6e-6 T range, which also confirmed the presence of the leak.

The vacuum shop team first used He while monitoring the mass 4 line in the RGA to leak detect, but switched to Ar because the mass 4 backgound was too high. Two issues were found, namely a throughput leak in a new gas valve used the day before for Ne injection and, more seriously, an air leak in the polarimeter shutter. Once these were fixed, the leak stopped and operations resummed. However, about 3 hours of run time were lost.

The rest of the run proceeded without incident , except for shots 10 and 11 which suffered early disruption. No obvious cause was found and the remainder of the shots ran full length.

Scorecard: 17 plasma attempts, 3 fizzles (due to leak), 3 disruptions and 11 full length plasmas

Session Leader Comments
Jan 19 2012 09:21:29:520AM1120119001Greg WallaceFirst plasma. LH into dummy loads. 6x25ms picket fence pulses. Disruption at 1.0s. LH pulses as requested.

Density on LH probes ~5e17. Will probably need to push launcher in carefully.

Next shot: Set switches to launcher position!
Jan 19 2012 09:20:29:950AM1120119002Greg WallaceFizzle.

Next shot: Try again for picket fence into plasma with CPS disabled.
Jan 19 2012 10:09:45:540AM1120119003Greg WallaceGood shot. LH into plasma for the first time with new TPS. CPS is bypassed. 6x20ms picket fence. JGDC reflected cable on col 2 disconnected.

Next shot: Repeat. Reconnect col 2 JGDC cable.
Jan 19 2012 10:08:13:760AM1120119004Greg WallaceFizzle.

Next shot: Repeat.
Jan 19 2012 10:13:04:190AM1120119005Greg WallaceFizzle.

Next shot: Try, try again.
Jan 19 2012 02:57:26:750PM1120119007Greg WallaceCPS enabled. Several trips due to high reflection coefficient. Reflections highest on col 3, 7, 8, and 11. Can see some non-thermals on ECE!

Next shot: Move launcher in to 1292 counts (~2.5 mm behind GH limiter) to reduce reflections.
Jan 19 2012 03:06:36:070PM1120119008Greg WallaceGood shot! No trips. Reflection coefficient is a little lower but still too high.

Next shot: Decrease outer gap by 5mm during flattop.
Jan 19 2012 03:16:06:037PM1120119009Greg WallaceGood shot! No trips. Reflection coefficient decreases during the pulse from ~30% to ~20%

Next shot: Step power up from 20kW/klystron to 70kW/klystron during the shot.
Jan 19 2012 03:26:52:703PM1120119010Greg WallaceEarly disruption (30 ms).

Next shot: Step power up from 20kW/klystron to 70kW/klystron during the shot.
Jan 19 2012 03:41:08:770PM1120119011Greg WallaceDisruption at 0.35 s. LH launcher looks OK.

Next shot: Try again.
Jan 19 2012 04:25:39:297PM1120119012Greg WallaceGood shot. No trips. Up to 300 kW net power in final pulse.

Next shot: Switch to phase scan at constant power of ~300 kW.
Jan 19 2012 04:17:24:883PM1120119013Greg WallaceGood shot! All 3 phasings with no trips. Reflection coefficient of 10-15 % with 90 deg phasing. (3.5 mm behind launcher.)

Next shot: Next shot will move launcher in to 1274 counts.
Jan 19 2012 04:26:22:970PM1120119014Greg WallaceAnother great shot with no trips. Refco higher at 60 deg with new position, 90 and 120 deg phasing less of a change.

Next shot: Go back to power scan from shot 12.
Jan 19 2012 04:40:38:760PM1120119015Greg WallacePower scan with simultaneous phase scan? No trips. Another good shot!

Next shot: Power scan with constant 90 deg phasing.
Jan 19 2012 04:53:27:147PM1120119016Greg WallaceAnother good shot with no trips. Constant 90 deg phasing for sure on this shot.

Next shot: Repeat same power staircase with constant 60 deg phasing.
Jan 19 2012 05:16:05:690PM1120119017Greg WallacePower scan at 60 deg with launcher at ~1.9mm behind GH limiter. CPS faults during lowest power sections of the pulse. Last shot of the day.

Physics Operator Comments
Jan 19 2012 09:04:19:047AM1120119001Ron ParkerCold today, ~ 15 F

First shot coming up

Jan 19 2012 09:19:59:100AM1120119001Ron ParkerShot 1 disrupted at 1 s
Jan 19 2012 09:20:13:120AM1120119002Ron ParkerShot 2 fizzled
Jan 19 2012 09:46:54:853AM1120119003Ron ParkerShot 3 ran full length, ~ 100 kW LH pulses
Jan 19 2012 09:51:59:080AM1120119003Ron ParkerSeveral delays:

Cell and power room access

Alternator fault -- spun down to 1590 RPM

Debugging problem in LH CTRL system
Jan 19 2012 10:00:42:507AM1120119004Ron ParkerShot 4 fizzled. H_alpha is high at breakdown
Reduce prefill from 17 to 15 ms for next shot
Jan 19 2012 10:17:29:830AM1120119005Ron ParkerAnother fizzle. RGA shows big 28 and 14 peaks. We'll check for leaks.
Jan 19 2012 10:48:53:927AM1120119005Ron ParkerStill leak checking. Base pressure is high, 6.8e-6 T, so this is a sizable leak.

We are continuing leak detection.
Jan 19 2012 02:22:50:427PM1120119006Ron ParkerLeak has been found -- polarimeter shutter -- and fixed.

Also, a new pulse valve used for injecting Ne for the 1120118 run appeared to have been leaking through the valve. But this was not an air leak.
Jan 19 2012 02:25:47:537PM1120119006Ron ParkerShot 6 ran full length. LH was not pulsed, but will be on next shot.
Jan 19 2012 02:58:29:077PM1120119007Ron ParkerShot 7 ran full length
Jan 19 2012 03:06:16:510PM1120119008Ron ParkerShot 8 ran full length. LH didn't trip
Jan 19 2012 03:13:07:370PM1120119009Ron ParkerShot 9 ran full length

Jan 19 2012 03:29:36:490PM1120119010Ron ParkerShot 10 disrupted at 150 kA.More problems?
Jan 19 2012 03:40:39:397PM1120119011Ron ParkerShot 11 also disrupted, this time around 350 ms.
Jan 19 2012 03:56:44:440PM1120119012Ron ParkerShot came back and ran full length.
Jan 19 2012 04:14:51:137PM1120119013Ron ParkerShot 13 ran full length, interesting LH shot with phase scan.
Jan 19 2012 04:27:11:567PM1120119014Ron ParkerShot 14 ran full length
Jan 19 2012 04:32:20:187PM1120119015Ron ParkerShot ran ful length
Jan 19 2012 05:10:30:270PM1120119016Ron ParkerShot 16 ran full length
Jan 19 2012 05:07:15:127PM1120119017Ron ParkerShot 17 ran full length

Engineering Operator Comments
ShotTimeTypeStatusComment
109:03:13:627AMPlasmaOk
209:17:41:693AMPlasmaOk
309:31:12:447AMPlasmaOk
409:54:56:470AMPlasmaOk
510:10:52:827AMPlasmaOk
602:21:56:787PMPlasmaOk
702:34:58:113PMPlasmaOk
802:56:11:650PMPlasmaOk
903:09:04:667PMPlasmaOk
1003:23:22:007PMPlasmaOk
1103:36:03:857PMPlasmaOk
1203:49:14:827PMPlasmaOk
1304:02:43:673PMPlasmaOk
1404:17:13:407PMPlasmaOk
1504:30:01:360PMPlasmaOk
1604:46:37:593PMPlasmaOk
1704:59:26:497PMPlasmaOk

System Availability
Jan 19 2012 09:02:52:463AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. System has been tested and will be ready once bottle is installedJan 09 2012 06:32AM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 06 2012 03:48PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperational. He level meter not working on 500L dewar. Frank will take manual readings.Jan 11 2012 11:46AM (labombard)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 05 2011 02:41PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoDiodes are taking data, but system is not fully operational yet. Post-acquisition data processing code is not yet functional.Dec 02 2011 03:27PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes Dec 01 2011 11:46AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIno Jan 06 2012 04:36PM Jim IrbyFast two-color interferometerirby
G-Side Ratiomaticyes Dec 02 2011 12:24PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 05 2011 02:42PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jan 09 2012 06:32AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 06 2011 08:21AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesOperational and testedJan 06 2012 03:50PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS working with the shot cycle. Viewing Mo line-emission normally covered by McPherson. Raw data only in tree.Dec 01 2011 02:54PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 01 2011 11:51AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnonew turbo pump, installed, McP pumping down. Almost ready to open to machine.Dec 06 2011 12:16PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 02 2011 12:27PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno1/3/2011: push-pull mechanism broken. MSE inoperativeJan 03 2012 11:47AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 02 2011 12:28PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesOperational. High voltage comes on during INIT and off at RECOOL.Dec 09 2011 09:48AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 06 2012 04:22PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jan 09 2012 06:33AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jan 09 2012 06:33AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jan 09 2012 06:33AM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jan 09 2012 06:33AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational, except for probe #1 (open circuit) and probe #16 (not installed).Dec 09 2011 09:50AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational, except for bottom-D probe (open circuit).Dec 09 2011 09:52AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF-divertor ok. J-divertor ok, except for JDIV_06 which is shorted out.Dec 09 2011 09:54AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational except for probes #4, 5 and 13 (open)Dec 09 2011 09:56AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120105xxx, all channels are connectedJan 05 2012 09:14AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesIon Sensitive Probe head installed. Testing in piggy-back mode.Dec 20 2011 12:33PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Dec 09 2011 09:57AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP is operational. K-port WASP is dead (all probes melted together).Dec 09 2011 09:58AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesFixed frequency operation available (100kHz) at moderate power (< 0.5kW). Otherwise in receiver mode.Jan 11 2012 11:50AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS working with the shot cycle. Viewing low-Z emission.Dec 01 2011 02:55PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Jan 19 2012 02:21:44:287PM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
Bolometersyes2pi and midplane AXUV diodes awaiting first plasma. Divertor diodes installed, but amplifiers need to be installed. Core and divertor bolometry not yet hooked upNov 17 2011 02:45PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. System has been tested and will be ready once bottle is installedJan 09 2012 06:32AM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 06 2012 03:48PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperational. He level meter not working on 500L dewar. Frank will take manual readings.Jan 11 2012 11:46AM (labombard)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 05 2011 02:41PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesnoDiodes are taking data, but system is not fully operational yet. Post-acquisition data processing code is not yet functional.Dec 02 2011 03:27PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes Dec 01 2011 11:46AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIno Jan 06 2012 04:36PM Jim IrbyFast two-color interferometerirby
G-Side Ratiomaticyes Dec 02 2011 12:24PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 05 2011 02:42PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jan 09 2012 06:32AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 06 2011 08:21AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesOperational and testedJan 06 2012 03:50PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS working with the shot cycle. Viewing Mo line-emission normally covered by McPherson. Raw data only in tree.Dec 01 2011 02:54PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman awaiting first plasma. B-PORT and LEDGE arrays installed but do not yet have amplifiers hooked up.Nov 17 2011 02:42PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 01 2011 11:51AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnonew turbo pump, installed, McP pumping down. Almost ready to open to machine.Dec 06 2011 12:16PM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 02 2011 12:27PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno1/3/2011: push-pull mechanism broken. MSE inoperativeJan 03 2012 11:47AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 02 2011 12:28PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesOperational. High voltage comes on during INIT and off at RECOOL.Dec 09 2011 09:48AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 06 2012 04:22PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jan 09 2012 06:33AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jan 09 2012 06:33AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jan 09 2012 06:33AM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jan 09 2012 06:33AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational, except for probe #1 (open circuit) and probe #16 (not installed).Dec 09 2011 09:50AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational, except for bottom-D probe (open circuit).Dec 09 2011 09:52AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF-divertor ok. J-divertor ok, except for JDIV_06 which is shorted out.Dec 09 2011 09:54AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational except for probes #4, 5 and 13 (open)Dec 09 2011 09:56AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120105xxx, all channels are connectedJan 05 2012 09:14AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesIon Sensitive Probe head installed. Testing in piggy-back mode.Dec 20 2011 12:33PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Dec 09 2011 09:57AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP is operational. K-port WASP is dead (all probes melted together).Dec 09 2011 09:58AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesFixed frequency operation available (100kHz) at moderate power (< 0.5kW). Otherwise in receiver mode.Jan 11 2012 11:50AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CorenoLasers and core Thomson are operatingJan 19 2012 10:22AM (yma)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgenoAll lasers are shut down and cannot be fired into cell.Apr 11 2011 01:20PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS working with the shot cycle. Viewing low-Z emission.Dec 01 2011 02:55PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 waiting first plasma, new core ARRAY5 needs debugging and the calibration data checkedNov 17 2011 02:44PM (mlreinke)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke