Alcator C-Mod Run 1120208 Information

Back to runs

Miniproposals
Miniproposal:683
Date Filed:12/14/2011
Title:Operations with both ICRF and LHRF systems: effects on LH coupling
First Author:Cornwall Lau
Session Leader:Cornwall Lau (shots 1-29)

Operators
Session leader(s):Cornwall Lau
Physics operator(s):Greg Wallace
Engineering operator(s):Sam Pierson,Gary Dekow,Bill Byford

Engineering Operator Run Comment
MP 683 - "Operations with both ICRF and LHRF systems: effects on LH coup

Session Leader Plans
Entered: Feb 7 2012 11:44:36:030AM
Author: Cornwall Lau
Session leader plan for run 1120208 (Wednesday, February 8, 2012)
MP 683 - "Operations with both ICRF and LHRF systems: effects on LH coupling", run 1 of 1.5?
C. Lau

Objectives:
- to figure out the difference between LHRF only and LHRF+ICRF operations with respect to LH coupling

Requested gas:
- ECDC overnight in deuterium
- Deuterium main ion plasmas
- Deuterium in Ninja

Requested systems:
- ICRF: D,E, J4 all required. Expected maximum of 1MW from each antenna. Start with D 500kW at .65-.85s, E 500kW at .9-1.1s, J4 500kW at 1.15-1.35s, D at 500kW from 1.45 to 1.5s.
- LH
    -LH Launcher position with respect to the limiters: start at 1-2 mm
    -LH Start time: .75 sec
    -LH Stop time: 1.25 sec
    -Phasing: 90 deg.
    -Net Power desired: 600 kW maximum, start with 300kW.
    -LH Run Duration: Full day
    -Waveform description: start with standard square pulse
- Cryopump (highly desirable)
- Ninja: expected puff into plasma at 1.4s. Expected to test effect of new gas capillaries in plasmas.

Requested Diagnostics:
- standard set of diagnostics necessary for plasma operations (e.g TCI, magnetics)
- SOL reflectometer: start with top horn
- LH Langmuir probes
- LH video camera
- Edge TS (desirable)

Run plan
- Target plasma is 1120127015 (USN). B0 at 5.4T all day. Change Ip to 600kA and nl04 demand to be 3e19m-2. Nl04, Enable cryopump. Enable ninja (C-D flipper) to puff into plasma at 1.4s. SOL reflectometer should be at top horn.
- Knobs that will be changed: goal is to scan for D+LH, E+LH, J+LH, and LH for a variety of different SOL density profiles and hence different LH coupling. Session leader wants to change only ICRF/LHRF power within a discharge. The other knobs will be changed between discharges. This is subject to change depending on results.
    - LH launcher location (1-2mm, 4-5mm, and 8-9mm behind plasma limiter). Other knobs below will be scanned first before changing LH launcher location.
    - nl04 demand from 3e19 to 8e19 m-2.
    - Ip from 600-1000 kA.
    - outer gap will be changed as necessary to optimize LH coupling
    - LHRF/ICRF power
    - Reflectometer horn location
    - If ninja shows some effect, gas puffing may be used for the expected low LH probe densities at LH launcher location of 8-9mm, and possibly 4-5mm behind plasma limiter.

"If have time" backup run plan
- Target plasma is 1120125010 (LSN strike point on the floor). H-modes will be attempted. LH launcher location will be moved to best location. Ninja and cryopump should be turned off. Change nl04 to 8e19 m-2. Ramp from 200kW to 800 kW of ICRF power in J antenna at .65s to .9s. Constant 800kW from .9to 1.4s. LH at 200kW at 1-1.2s, LH power at 600kW at 1.2-1.5s. Repeat with D and E.

Physics Operators Plans
Entered: Feb 7 2012 04:19:28:310PM
Author: Greg Wallace
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1120127015

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:
fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill H-bottom with 15 psi D2 Hybrid DISABLED (PG5)
leave B-div as is Hybrid DISABLED (PG6)
leave H-div as is Hybrid DISABLED (PG7)
fill NINJA with 10 psi D2 DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus, Loeus
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): yes
Cryopump (yes/no): yes
DNB (yes/no): yes

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

-----------------------------
Plasma setup
----------------------------

Begin with shot 1120127015 (5.4 T, 0.7 MA, USN).

Session Leader Summaries
Entered: Mar 8 2012 04:31:37:970PM
Author: Cornwall Lau
Session leader plan for run 1120208 (Wednesday, February 8, 2012)
MP 683 - "Operations with both ICRF and LHRF systems: effects on LH coupling" , run 1 of 1.5?
C. Lau

Objectives:
- to figure out the difference between LHRF only and LHRF+ICRF operations with respect to LH coupling

Summary

During this run day, the LH launcher location was changed from 1-4mm behind LH limiters, outer gaps from 6mm to 2cm, currents from 600-1000kA, and nl04 from 4e19 to 7e19. ICRF antenna location and order was also changed(see session leader comments). LH power kept constant at ~200kW for all discharges, except for shot 29. ICRF power was also kept constant at ~500kW throughout the day.

Despite the wide range of plasma parameters, the effect of the ICRF on LH coupling was quite consistent throughout the day. Compared to LH only operations, reflection coefficients increased considerably during LH+D operations, increased moderately during LH+E operations, and showed little effect during LH+J operation. It should be noted that the Langmuir probe densities generally rose when ICRF was turned on. This could be due a local ICRF effect, a typical global rise in nebar when ICRF is turned on, or possible errors in the automatic analysis routine under ICRF sheath rectification. The fact that the reflection coefficients did not correlate very well with the Langmuir probe densities need to be explored.

It should be noted that the LH launcher was always flush to the ICRF limiter or in front of the ICRF limiter. When the LH launcher is behind the ICRF limiter, the effect of ICRF is observed to be completely different. This needs to be tried. H-modes may need to be tried?

Notes
- We piggybacked the NINJA capillaries that were on B-C side in order to test local gas puffing and its possible effects on ICRF and LHRF coupling. Preliminary evidence at 10PSI of D2 indicate some change at nl04~5e19, and little to no change at nl04~7e19. (gas does not get in at high densities?). Will need to see on reflectometer.Speculation is that we need to increase the pressure (elapsed time?) for ICRF and/or LH coupling purposes. We should probably piggyback this more...
- SOL reflectometer started working at top horn on shot 6 (operator error)
- We need to try discharges when the LH launcher is behind ICRF limiters. We need to try H-modes.

Table Summary
For this table, units are unitless,1019m-3, MA, cm, mm behind plasma limiter, antenna order, %,%,%,%, 10^20 m-4
* denotes when LH trips and have significant trouble restarting (sometimes there is still enough usable data)

Shot#nebar (10e19 m-3)Ip (MA)outer gap (cm)LH location (mm)ICRF orderLH Ref (%)LH+D Ref (%)LH+E Ref (%)LH+J Ref (%)
016-8.61.83D-E-J****
034-6.61.53D-E-J****
045-7.61.43E-D-J37*55**39
055-7.61.42E-D-J22*50*35
067-8.61.42J-E-D26413732
078...61.42J-D-E27*46*33*30*
0810-11.61.42J-D-E****
0910-11.622J-D-E*38**24
108-9.61.91J-D-E26403826
118-9.81.91J-D-E****
128-9.81.51J-E-D25554826
138-9.81.21J-E-D23514228
148-9.8.91E-D-J28463426
158-91.91E-D-J133524*12
257-91.64E-D-Jno datano datano datano data
267-91.64E-D-J4159*4338
277-98.64E-D-J41534235
2810-121.64E-D-J33523230
2910-121.64E-D-J*4535**

Physics Operator Summaries
Entered: Feb 8 2012 05:27:10:743PM
Author: Greg Wallace
PO Summary for 1120208
No problems in the morning. Startup was good through shot 15 based on segment 1 from 1120207032. Starting of shot 16 we had a string of fizzles lasting until shot 25. Techniques attempted to eliminate the fizzle included increasing the prefill, decreasing the prefill, and tweaking EF4. Finally the cryopump was turned off. Starting on shot 25 the startup was good again through the end of the run on shot 29.

Session Leader Comments
Feb 8 2012 09:23:26:693AM1120208001Cornwall LauPlan:
Target plasma is 1120127015 (USN). B0=5.4T, Ip=600kA,nl04=3e19m-2. Enable cryopump. LH at 300kW from .75 to 1.25s. Launcher at 3mm. Order of ICRF (all at 500kW) is D (.65-.85s),E (.9-1.1s),J4 (1.15-1.35s),D (1.45-1.5s)

Result:
plasma all the way through. no LH power.

Next:
chnage ICRF timing D (.6 to .8s), J4( 1.2 to 1.4s)
LH is going to adjust their phasing on their klystrons to optimize.
outer gap is decreasing 2mm to hopefully raise Langmuir probe densities.
Amanda noticed Bt was flattop until 2s. flatop adjusted to 1.5s
Feb 8 2012 09:25:47:607AM1120208002Cornwall LauPlan:
chnage ICRF timing D (.6 to .8s), J4( 1.2 to 1.4s)
LH is going to adjust their phasing on their klystrons to optimize.
outer gap is decreasing 2mm to hopefully raise Langmuir probe densities.
Amanda noticed Bt was flattop until 2s. flatop adjusted to 1.5s

Result:
early disruption

Next:
repeat
Feb 8 2012 10:26:32:217AM1120208003Cornwall LauPlan:
repeat

Result:
disruption at ~.96. no LH during the pulse due to low langmuir probe densities probably

Next:
repeat with nl04 demand raised from .3e20 to .4e20. switch order to E,D,J

Feb 8 2012 10:06:59:877AM1120208004Cornwall LauPlan:
repeat with nl04 demand raised from .3e20 to .4e20

Result:
plasma all the way through. LH tripped a lot (langmuir probe density still low).

Next:
Move LH launcher in to 2mm. repeat.
Feb 8 2012 10:24:16:027AM1120208005Cornwall LauPlan:
Move LH launcher in to 2mm. repeat.

Result:
plasma. LH still tripping a bit, but there's data for D+LH, E+LH, J+LH.

Next:
raise nlo4 to 5e19. switch order to J,E,D.

Feb 8 2012 10:38:47:653AM1120208006Cornwall LauPlan:
raise nlo4 to 5e19. switch order to J,E,D.

Result:
good shot. LH tripped once at the end in D-port. got LH, D+LH, E+LH, J+LH data. ninja fired. Got some data (look at video cameras). Steve (Wukitch) has command right now and will play around with it.

Next:
repeat with 50ms instaed of 100ms gap between ICRF antennas. change order to J, D,E
Feb 8 2012 10:49:32:443AM1120208007Cornwall LauPlan:
repeat with 50ms instaed of 100ms gap between ICRF antennas. change order to J, D,E

Result:
plasma. LH trips a lot, but got some data for this.

Next:
raise nl04 to 7e19.
Feb 8 2012 11:03:49:610AM1120208008Cornwall LauPlan:
raise nl04 to 7e19.

Result:
plasma. lots of LH trips. not much usable data.

Next:
increase outer gap by 6mm.
Feb 8 2012 11:17:13:740AM1120208009Cornwall LauPlan:
increase outer gap by 6mm.

Result:
plasma, but no usable LH data.

Next:
Decrease nl_04 from 0.7e20 to 0.5e20. Move LH position from 2mm behind GH to 1 mm behind GH.
Feb 8 2012 11:29:08:930AM1120208010Cornwall LauPlan:
Decrease nl_04 from 0.7e20 to 0.5e20. Move LH position from 2mm behind GH to 1 mm behind GH.

Result:
good plasma, good data.

Next:
change current to 800kA (mapping). ICRF pulse after 1.4s is back on.
Feb 8 2012 11:50:47:320AM1120208011Cornwall LauPlan:
change current to 800kA (mapping). ICRF pulse after 1.4s is back on.

Result:
good plasma. changing the current lower the langmuir probe density and seems to create too high reflection coefficients.

Next:
reduce outer gap by 6mm. order is J,E,D
Feb 8 2012 11:54:53:467AM1120208012Cornwall LauPlan:
reduce outer gap by 6mm. order is J,E,D

Result:
good plasma, good data.

Next:
reduce outer gap by 4 more mm. want a bit more data at higher LH langmuir probe densities. added D ICRF at 1.45 to 1.5s to see if anything happens with the gas puff.
Feb 8 2012 12:07:15:673PM1120208013Cornwall LauPlan:
reduce outer gap by 4 more mm. want a bit more data at higher LH langmuir probe densities.

Result:
plasma, injection caused disruption during plasma ramp down. got good plasma data.
Next:
reduce outer gap by 4 more mm. want a bit more data at higher LH langmuir probe densities. switch order of antennas to E,D,J
Feb 8 2012 12:28:22:113PM1120208014Cornwall LauPlan:
reduce outer gap by 4 more mm. want a bit more data at higher LH langmuir probe densities. switch order of antennas to E,D,J

Result:
good plasma, disruption in ramp down again. good data for this MP

Next:
change current to 1MA.
Feb 8 2012 12:36:23:810PM1120208015Cornwall LauPlan:
change current to 1MA.

Result:
good plasma, disruption just before ramp down. got plasma data.

Next:
reduce outer gap by 4mm. move LH launcher from 1mm behind GH limiter to 4mm behind GH limiter.
Feb 8 2012 12:41:39:533PM1120208016Cornwall LauPlan:
reduce outer gap by 4mm. move LH launcher from 1mm behind GH limiter to 4mm behind GH limiter.

Result:
fizzle

Next:
repeat

Feb 8 2012 12:56:33:167PM1120208017Cornwall LauPlan:
repeat

Result:
fizzle

Next:
repeat
Feb 8 2012 01:34:51:360PM1120208018Cornwall LauPlan:
repeat

Result:
another fizzle

Next:
repeat
Feb 8 2012 01:34:58:760PM1120208019Cornwall LauPlan:
repeat

Result:
another fizzle

Next:
repeat
Feb 8 2012 01:48:13:357PM1120208020Cornwall LauPlan:
repeat

Result:
fizzle

Next:
repeat
Feb 8 2012 02:04:13:023PM1120208021Cornwall LauPlan:
repeat

Result:
fizzle

Next:
repeat
Feb 8 2012 03:11:46:393PM1120208022Cornwall LauPlan:
repeat

Result:
fizzle

Next:
repeat. it's a bit early for groundhog day... cryopump will be turned off.
Feb 8 2012 03:18:09:180PM1120208023Cornwall LauPlan:
repeat

Result:
fizzle

Next:
repeat
Feb 8 2012 03:32:02:970PM1120208024Cornwall LauPlan:
repeat

Result:
fizzle

Next:
repeat
Feb 8 2012 03:51:55:360PM1120208025Cornwall LauPlan:
repeat

Result:
plasma! no LH

Next:
repeat with LH
Feb 8 2012 04:20:42:270PM1120208026Cornwall LauPlan:
repeat with LH

Result:
plasma. good data with LH

Next:
drop current to 800kA

Feb 8 2012 04:37:59:817PM1120208027Cornwall LauPlan:
drop current to 800kA

Result:
good plasma. good data

Next:
change current back to 1MA. change nl04 from 5e19 to 6.5e19.
Feb 8 2012 04:52:49:657PM1120208028Cornwall LauPlan:
change current back to 1MA. change nl04 from 5e19 to 6.5e19.

Result:
got plasma. got good data for this MP

Next:
raise LH power
Feb 8 2012 05:02:51:887PM1120208029Cornwall LauPlan:
raise LH power

Result:
got plasma. decent amount of LH tripping, but data was achieved.

Next:
last shot of the day.

Physics Operator Comments
Feb 8 2012 09:22:34:320AM1120208001Greg WallaceChanges: Load seg 1 from shot -1 (2012 cryopump setup). Load seg 2 and 3 (active) from 1120127015. Change seg 3 Ip to 600 kA and nl_04 to 3e19.

Result: Plasma through rampdown. LH faulted on all restrikes. Density on LH probes is extremely low with outer gap of 1.8cm and launcher 3.5mm behind GH limiter.

Next shot: Try again. Increase time between ICRF pulses. Adjust for phase drift in LH control system. Increase RCUR by ~1mm to decrease outer gap by ~2mm. Start TF rampdown at 1.75 s for Amanda.
Feb 8 2012 09:33:53:753AM1120208002Greg WallaceChanges: Try again. Increase time between ICRF pulses. Adjust for phase drift in LH control system. Increase RCUR by ~1mm to decrease outer gap by ~2mm. Start TF rampdown at 1.75 s for Amanda.

Result: Disruption at 0.315 s. Something fell in?

Next shot: Try again.
Feb 8 2012 09:59:41:270AM1120208003Greg WallaceChanges: Try again. No DPCS changes.

Result: Disruption at 0.96 s. Another injection, I think. Cell access for DNB.

Next shot: Increase nl_04 programming from 0.3e20 to 0.4e20.
Feb 8 2012 10:08:14:747AM1120208004Greg WallaceChanges: Increase nl_04 programming from 0.3e20 to 0.4e20.

Result: Plasma through rampdown. Many LH trips but the later part of the pulse made it through. Increasing density seemed to help a bit.

Next shot: Move LH launcher from 3.65 mm behind GH to 2.0 mm behind GH limiter. No DPCS changes.
Feb 8 2012 10:23:03:083AM1120208005Greg WallaceChanges: Move LH launcher from 3.65 mm behind GH to 2.0 mm behind GH limiter. No DPCS changes.

Result: Plasma through rampdown. LH reflection coefficient goes up from ~20% to ~50% when D-port turns on. Interestingly the LH stays on the best during D-port??? Cell access for Cornwall.

Next shot: Increase nl_04 to 0.5e20 in seg 3.
Feb 8 2012 10:34:31:403AM1120208006Greg WallaceChanges: Increase nl_04 to 0.5e20 in seg 3.

Result: Plasma through rampdown. Clear increase in LH reflection coeff with ICRF power.

Next shot: Move ICRF pulses closer together. No DPCS changes.
Feb 8 2012 10:54:25:213AM1120208007Greg WallaceChanges: Move ICRF pulses closer together. No DPCS changes.

Result: Plasma through rampdown. More LH trips this time.

Next shot: Enable PG1 (B side lower) Ar puff, 70 ms. Increase nl_04 from 0.5e20 to 0.7e20.
Feb 8 2012 11:08:29:540AM1120208008Greg WallaceChanges: Enable PG1 (B side lower) Ar puff, 70 ms. Increase nl_04 from 0.5e20 to 0.7e20.

Result: Plasma through rampdown. LH faulting continuously. Looks on the reflected power like breakdown on plasma side.

Next shot: Reduce RCUR from .659 to .656 (increase outer gap by 6mm).
Feb 8 2012 11:15:14:330AM1120208009Greg WallaceChanges: Reduce RCUR from .659 to .656 (increase outer gap by 6mm).

Result: Plasma through rampdown. Many LH trips, looks like more breakdown on plasma side. Antenna doesn't seem to like the high line averaged density/neutral pressure.

Next shot: Decrease nl_04 from 0.7e20 to 0.5e20. Move LH position from 3mm behind GH to 2 mm behind GH.
Feb 8 2012 11:29:27:343AM1120208010Greg WallaceChanges: Decrease nl_04 from 0.7e20 to 0.5e20. Move LH position from 3mm behind GH to 2 mm behind GH.

Result: Plasma through rampdown. Much better LH pulse with lower density and closer launcher position.

Next shot: Increase Ip to 800 kA.
Feb 8 2012 11:44:33:913AM1120208011Greg WallaceChanges: Increase Ip to 800 kA.

Result: Plasma through rampdown. Poor LH coupling on this shot, looks like high refco is the culprit.

Next shot: Decrease outer gap by 6mm (increase RCUR from 0.656 to 0.659). Switch ICRF antenna order.
Feb 8 2012 11:55:39:283AM1120208012Greg WallaceChanges: Decrease outer gap by 6mm (increase RCUR from 0.656 to 0.659). Switch ICRF antenna order.

Result: Plasma through rampdown. Much better LH with smaller gap.

Next shot: Decrease outer gap by 4mm (increase RCUR from 0.659 to 0.661).
Feb 8 2012 12:07:12:027PM1120208013Greg WallaceChanges: Decrease outer gap by 4mm (increase RCUR from 0.659 to 0.661).

Result: Disruption in rampdown. Clean LH pulse. Reflections highest with D-port, then E-port, then J-port, then LH only.

Next shot: Decrease outer gap by another 4mm (increase RCUR from 0.661 to 0.663).
Feb 8 2012 12:22:10:733PM1120208014Greg WallaceChanges: Decrease outer gap by another 4mm (increase RCUR from 0.661 to 0.663).

Result: Plasma disrupts in rampdown. Breakdown on top row of LH launcher at 1.15 s causes a fault. One early fault due to high reflections?

Next shot: Increase Ip to 1.0 MA.
Feb 8 2012 12:38:12:670PM1120208015Greg WallaceChanges: Increase Ip to 1.0 MA.

Result: Disruption at 1.47 s. Pretty good LH with very low reflections during J and with no ICRF, high reflections during E and especially D.

Next shot: Decrease outer gap by another 4mm (increase RCUR from 0.663 to 0.665) Move LH launcher to ~4 mm behind GH limiter.
Feb 8 2012 12:50:04:860PM1120208016Greg WallaceChanges: Decrease outer gap by another 4mm (increase RCUR from 0.663 to 0.665) Move LH launcher to ~4 mm behind GH limiter.

Result: Fizzle. Breakdown is a little later than on shot 15. Bounces at ~13 ms, big spike in CIII and H-alpha. Fields and pressure look good.

Next shot: Try again. Might be a post-disruption fizzle? No DPCS changes.
Feb 8 2012 01:06:39:900PM1120208017Greg WallaceChanges: Try again. Might be a post-disruption fizzle? No DPCS changes.

Result: Fizzle again. Datasystem seems stuck.

Next shot: Increase PG4 prepuff from 30 ms to 36 ms to see if that fixes bounce.
Feb 8 2012 01:18:58:153PM1120208018Greg WallaceChanges: Increase PG4 prepuff from 30 ms to 36 ms to see if that fixes bounce.

Result: Another fizzle. No bounce this time but late breakdown that never really took off.

Next shot: Reduce PG4 prepuff from 36 to 33 ms.
Feb 8 2012 01:47:13:890PM1120208019Greg WallaceChanges: Reduce PG4 prepuff from 36 to 33 ms.

Result: Another fizzle.

Next shot: Decrease PG4 prepuff from 33 to 30 ms.
Feb 8 2012 01:58:41:877PM1120208020Greg WallaceChanges: Reduce PG4 prepuff from 33 to 30 ms.

Result: Fizzle again.

Next shot: Reduce PG4 prepuff from 30 to 27 ms.
Feb 8 2012 02:07:53:310PM1120208021Greg WallaceChanges: Reduce PG4 prepuff from 30 to 27 ms.

Result: Closer, but still a fizzle. Breakdown is slightly late.

Next shot: ECDC for 20 min before the next shot. Change IC_EF4U from -1310 to -1320 at t=0 to decrease Bz0.
Feb 8 2012 03:13:39:350PM1120208022Greg WallaceChanges: ECDC for 20 min before the next shot. Change IC_EF4U from -1310 to -1320 at t=0 to decrease Bz0.

Result: Fizzle again despite ECDC. Current never ramped up.

Next shot: Turn off cryopump. Reduce PG4 prepuff from 27 to 13 ms to account for lack of cryopump.
Feb 8 2012 03:18:06:103PM1120208023Greg WallaceChanges: Turn off cryopump. Reduce PG4 prepuff from 27 to 13 ms to account for lack of cryopump.

Result: Fizzle again!??!

Next shot: Reduce PG4 prepuff again, this time from 13 to 10 ms.
Feb 8 2012 03:36:57:380PM1120208024Greg WallaceChanges: Reduce PG4 prepuff again, this time from 13 to 10 ms.

Result: Fizzle.

Next shot: Reduce early PG3 puff.
Feb 8 2012 03:54:47:657PM1120208025Greg WallaceChanges: Reduce early PG3 puff.

Result: Plasma through rampdown!!! No LH due to TPS CNTRLX fault (lost communication with active control system).

Next shot: Repeat. No DPCS changes.
Feb 8 2012 04:19:32:250PM1120208026Greg WallaceChanges: Repeat. No DPCS changes.

Result: Plasma through rampdown. Good shot! LH worked on this shot.

Next shot: Reduce Ip to 800 kA.
Feb 8 2012 04:39:08:263PM1120208027Greg WallaceChanges: Reduce Ip to 800 kA.

Result: Plasma through rampdown. LH looks better after adjusting for phase drift.

Next shot: Increase nl_04 demand to 6.5e19. Increase Ip to 1.0MA.
Feb 8 2012 04:52:27:847PM1120208028Greg WallaceChanges: Increase nl_04 demand to 6.5e19. Increase Ip to 1.0MA.

Result: Plasma through rampdown. A few early LH faults then ran clean for the rest of the pulse.

Next shot: No DPCS changes. Double LH power to 120 kW/klystron.
Feb 8 2012 05:23:06:070PM1120208029Greg WallaceChanges: No DPCS changes. Double LH power to 120 kW/klystron.

Result: Plasma through rampdown. Last shot of the day.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:00:12:450AMPlasmaOk
209:23:05:593AMPlasmaOk
309:38:50:347AMPlasmaOk
409:57:20:770AMPlasmaOk
510:10:09:923AMPlasmaOk
610:26:17:470AMPlasmaOk
710:39:08:557AMPlasmaOk
810:51:50:327AMPlasmaOk
911:06:35:390AMPlasmaOk
1011:19:17:850AMPlasmaOk
1111:32:30:723AMPlasmaOk
1211:46:11:917AMPlasmaOk
1311:59:04:027AMPlasmaOk
1412:11:53:157PMPlasmaOk
1512:25:12:560PMPlasmaOk
1612:39:12:737PMPlasmaOk
1712:52:05:117PMPlasmaOk
1801:07:47:773PMPlasmaOk
1901:31:51:970PMPlasmaOk
2001:44:51:530PMPlasmaOk
2101:59:56:773PMPlasmaOk
2203:01:25:310PMPlasmaOk
2303:14:24:257PMPlasmaOk
2403:27:56:447PMPlasmaOk
2503:44:59:337PMPlasmaOk
2604:12:19:453PMPlasmaOk
2704:30:03:883PMPlasmaOk
2804:42:43:557PMPlasmaOk
2904:55:46:960PMPlasmaOk

System Availability
Feb 8 2012 07:08:30:790AM
Unforeseen circumstances limited the amount of time ECDC was operated to 1 hour and 10 minutes.
Feb 8 2012 08:59:53:830AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane and LEDGE-AX diodes functioning properly. Midplane bolometers working and calibrated. LEDGE/DIV bolometers working, but toaster calibration not yet complete.Jan 23 2012 12:02PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. System has been tested and will be ready once bottle is installedJan 09 2012 06:32AM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 06 2012 03:48PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperational. He level meter not working on 500L dewar. Frank will take manual readings.Jan 11 2012 11:46AM (labombard)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 05 2011 02:41PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 01 2012 01:24PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes Dec 01 2011 11:46AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIno Jan 06 2012 04:36PM Jim IrbyFast two-color interferometerirby
G-Side Ratiomaticyes Dec 02 2011 12:24PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 05 2011 02:42PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jan 09 2012 06:32AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 06 2011 08:21AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesOperational and testedJan 06 2012 03:50PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Jan 23 2012 12:03PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane Lyman-a and LEDGE-LY working normally. New B-PORT Lyman (BPLY) still being debugged.Jan 23 2012 12:04PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 01 2011 11:51AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonno**vacuum system problem*** McPherson viewing the 10-14 nm region for molybdenum monitoring. It's days are numbered as LoWEUS has demonstrated superiority.Jan 31 2012 08:15AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 02 2011 12:27PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno1/3/2011: push-pull mechanism broken. MSE inoperativeJan 03 2012 11:47AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 02 2011 12:28PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesOperational. High voltage comes on during INIT and off at RECOOL.Dec 09 2011 09:48AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 06 2012 04:22PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jan 09 2012 06:33AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jan 09 2012 06:33AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jan 09 2012 06:33AM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jan 09 2012 06:33AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational, except for probe #1 (open circuit) and probe #16 (not installed).Dec 09 2011 09:50AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational, except for bottom-D probe (open circuit).Dec 09 2011 09:52AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF-divertor ok. J-divertor ok, except for JDIV_06 which is shorted out.Dec 09 2011 09:54AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational except for probes #4, 5 and 13 (open)Dec 09 2011 09:56AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120105xxx, all channels are connectedJan 05 2012 09:14AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesIon Sensitive Probe head installed. Testing in piggy-back mode.Dec 20 2011 12:33PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Dec 09 2011 09:57AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP is operational. K-port WASP is dead (all probes melted together).Dec 09 2011 09:58AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesFixed frequency operation available (100kHz) at moderate power (< 0.5kW). Otherwise in receiver mode.Jan 11 2012 11:50AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with two 50Hz lasers, precise density calibration still required.Feb 03 2012 04:04AM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesSystem taking data. Requires calibration.Feb 03 2012 04:05AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Jan 23 2012 12:13PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 working normally, ARRAY5 (new core view) working but spatial calibration issues not yet resolvedJan 23 2012 12:13PM (mlreinke)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke