| Session leader(s): | Cornwall Lau |
| Physics operator(s): | Greg Wallace |
| Engineering operator(s): | Sam Pierson,Gary Dekow,Bill Byford |
| Engineering Operator Run Comment |
| MP 683 - "Operations with both ICRF and LHRF systems: effects on LH coup |
| Session Leader Plans |
| Entered: Feb 7 2012 11:44:36:030AM |
| Author: Cornwall Lau |
| Session leader plan for run 1120208 (Wednesday, February 8, 2012)
MP 683 - "Operations with both ICRF and LHRF systems: effects on LH coupling", run 1 of 1.5? C. Lau Objectives: - to figure out the difference between LHRF only and LHRF+ICRF operations with respect to LH coupling Requested gas: - ECDC overnight in deuterium - Deuterium main ion plasmas - Deuterium in Ninja Requested systems: - ICRF: D,E, J4 all required. Expected maximum of 1MW from each antenna. Start with D 500kW at .65-.85s, E 500kW at .9-1.1s, J4 500kW at 1.15-1.35s, D at 500kW from 1.45 to 1.5s. - LH -LH Launcher position with respect to the limiters: start at 1-2 mm -LH Start time: .75 sec -LH Stop time: 1.25 sec -Phasing: 90 deg. -Net Power desired: 600 kW maximum, start with 300kW. -LH Run Duration: Full day -Waveform description: start with standard square pulse - Cryopump (highly desirable) - Ninja: expected puff into plasma at 1.4s. Expected to test effect of new gas capillaries in plasmas. Requested Diagnostics: - standard set of diagnostics necessary for plasma operations (e.g TCI, magnetics) - SOL reflectometer: start with top horn - LH Langmuir probes - LH video camera - Edge TS (desirable) Run plan - Target plasma is 1120127015 (USN). B0 at 5.4T all day. Change Ip to 600kA and nl04 demand to be 3e19m-2. Nl04, Enable cryopump. Enable ninja (C-D flipper) to puff into plasma at 1.4s. SOL reflectometer should be at top horn. - Knobs that will be changed: goal is to scan for D+LH, E+LH, J+LH, and LH for a variety of different SOL density profiles and hence different LH coupling. Session leader wants to change only ICRF/LHRF power within a discharge. The other knobs will be changed between discharges. This is subject to change depending on results. - LH launcher location (1-2mm, 4-5mm, and 8-9mm behind plasma limiter). Other knobs below will be scanned first before changing LH launcher location. - nl04 demand from 3e19 to 8e19 m-2. - Ip from 600-1000 kA. - outer gap will be changed as necessary to optimize LH coupling - LHRF/ICRF power - Reflectometer horn location - If ninja shows some effect, gas puffing may be used for the expected low LH probe densities at LH launcher location of 8-9mm, and possibly 4-5mm behind plasma limiter. "If have time" backup run plan - Target plasma is 1120125010 (LSN strike point on the floor). H-modes will be attempted. LH launcher location will be moved to best location. Ninja and cryopump should be turned off. Change nl04 to 8e19 m-2. Ramp from 200kW to 800 kW of ICRF power in J antenna at .65s to .9s. Constant 800kW from .9to 1.4s. LH at 200kW at 1-1.2s, LH power at 600kW at 1.2-1.5s. Repeat with D and E. |
| Physics Operators Plans |
| Entered: Feb 7 2012 04:19:28:310PM |
| Author: Greg Wallace |
| -----------------
Engineering Setup ----------------- Run begins at 09:00 and ends at 17:00 Power systems as on: 1120127015 Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled Gas setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) fill H-bottom with 15 psi D2 Hybrid DISABLED (PG5) leave B-div as is Hybrid DISABLED (PG6) leave H-div as is Hybrid DISABLED (PG7) fill NINJA with 10 psi D2 DISABLED Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus, Loeus Leave z-bolo shutter as is (should be open) Torvac gatevalve toggle (yes/no): no Boronization(yes/no): no Overnight ECDC (yes/no): yes ICRF(yes/no): yes LH(yes/no): yes Cryopump (yes/no): yes DNB (yes/no): yes Vessel temperature: 35/35/35 ------------------------------ ECDC Parameters (if requested) ------------------------------ gas and pressure: D2 at 2e-4 Torr sweep: 44/45/103 cm scan: 20/120 s ----------------------------- Plasma setup ---------------------------- Begin with shot 1120127015 (5.4 T, 0.7 MA, USN). |
| Session Leader Summaries | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Entered: Mar 8 2012 04:31:37:970PM | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Author: Cornwall Lau | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Session leader plan for run 1120208 (Wednesday, February 8, 2012)
MP 683 - "Operations with both ICRF and LHRF systems: effects on LH coupling" , run 1 of 1.5? C. Lau Objectives: - to figure out the difference between LHRF only and LHRF+ICRF operations with respect to LH coupling Summary During this run day, the LH launcher location was changed from 1-4mm behind LH limiters, outer gaps from 6mm to 2cm, currents from 600-1000kA, and nl04 from 4e19 to 7e19. ICRF antenna location and order was also changed(see session leader comments). LH power kept constant at ~200kW for all discharges, except for shot 29. ICRF power was also kept constant at ~500kW throughout the day. Despite the wide range of plasma parameters, the effect of the ICRF on LH coupling was quite consistent throughout the day. Compared to LH only operations, reflection coefficients increased considerably during LH+D operations, increased moderately during LH+E operations, and showed little effect during LH+J operation. It should be noted that the Langmuir probe densities generally rose when ICRF was turned on. This could be due a local ICRF effect, a typical global rise in nebar when ICRF is turned on, or possible errors in the automatic analysis routine under ICRF sheath rectification. The fact that the reflection coefficients did not correlate very well with the Langmuir probe densities need to be explored. It should be noted that the LH launcher was always flush to the ICRF limiter or in front of the ICRF limiter. When the LH launcher is behind the ICRF limiter, the effect of ICRF is observed to be completely different. This needs to be tried. H-modes may need to be tried? Notes - We piggybacked the NINJA capillaries that were on B-C side in order to test local gas puffing and its possible effects on ICRF and LHRF coupling. Preliminary evidence at 10PSI of D2 indicate some change at nl04~5e19, and little to no change at nl04~7e19. (gas does not get in at high densities?). Will need to see on reflectometer.Speculation is that we need to increase the pressure (elapsed time?) for ICRF and/or LH coupling purposes. We should probably piggyback this more... - SOL reflectometer started working at top horn on shot 6 (operator error) - We need to try discharges when the LH launcher is behind ICRF limiters. We need to try H-modes. Table Summary For this table, units are unitless,1019m-3, MA, cm, mm behind plasma limiter, antenna order, %,%,%,%, 10^20 m-4 * denotes when LH trips and have significant trouble restarting (sometimes there is still enough usable data)
|
| Physics Operator Summaries |
| Entered: Feb 8 2012 05:27:10:743PM |
| Author: Greg Wallace |
| PO Summary for 1120208
No problems in the morning. Startup was good through shot 15 based on segment 1 from 1120207032. Starting of shot 16 we had a string of fizzles lasting until shot 25. Techniques attempted to eliminate the fizzle included increasing the prefill, decreasing the prefill, and tweaking EF4. Finally the cryopump was turned off. Starting on shot 25 the startup was good again through the end of the run on shot 29. |
| Session Leader Comments | |||
| Feb 8 2012 09:23:26:693AM | 1120208001 | Cornwall Lau | Plan:
Target plasma is 1120127015 (USN). B0=5.4T, Ip=600kA,nl04=3e19m-2. Enable cryopump. LH at 300kW from .75 to 1.25s. Launcher at 3mm. Order of ICRF (all at 500kW) is D (.65-.85s),E (.9-1.1s),J4 (1.15-1.35s),D (1.45-1.5s) Result: plasma all the way through. no LH power. Next: chnage ICRF timing D (.6 to .8s), J4( 1.2 to 1.4s) LH is going to adjust their phasing on their klystrons to optimize. outer gap is decreasing 2mm to hopefully raise Langmuir probe densities. Amanda noticed Bt was flattop until 2s. flatop adjusted to 1.5s |
| Feb 8 2012 09:25:47:607AM | 1120208002 | Cornwall Lau | Plan:
chnage ICRF timing D (.6 to .8s), J4( 1.2 to 1.4s) LH is going to adjust their phasing on their klystrons to optimize. outer gap is decreasing 2mm to hopefully raise Langmuir probe densities. Amanda noticed Bt was flattop until 2s. flatop adjusted to 1.5s Result: early disruption Next: repeat |
| Feb 8 2012 10:26:32:217AM | 1120208003 | Cornwall Lau | Plan:
repeat Result: disruption at ~.96. no LH during the pulse due to low langmuir probe densities probably Next: repeat with nl04 demand raised from .3e20 to .4e20. switch order to E,D,J |
| Feb 8 2012 10:06:59:877AM | 1120208004 | Cornwall Lau | Plan:
repeat with nl04 demand raised from .3e20 to .4e20 Result: plasma all the way through. LH tripped a lot (langmuir probe density still low). Next: Move LH launcher in to 2mm. repeat. |
| Feb 8 2012 10:24:16:027AM | 1120208005 | Cornwall Lau | Plan:
Move LH launcher in to 2mm. repeat. Result: plasma. LH still tripping a bit, but there's data for D+LH, E+LH, J+LH. Next: raise nlo4 to 5e19. switch order to J,E,D. |
| Feb 8 2012 10:38:47:653AM | 1120208006 | Cornwall Lau | Plan:
raise nlo4 to 5e19. switch order to J,E,D. Result: good shot. LH tripped once at the end in D-port. got LH, D+LH, E+LH, J+LH data. ninja fired. Got some data (look at video cameras). Steve (Wukitch) has command right now and will play around with it. Next: repeat with 50ms instaed of 100ms gap between ICRF antennas. change order to J, D,E |
| Feb 8 2012 10:49:32:443AM | 1120208007 | Cornwall Lau | Plan:
repeat with 50ms instaed of 100ms gap between ICRF antennas. change order to J, D,E Result: plasma. LH trips a lot, but got some data for this. Next: raise nl04 to 7e19. |
| Feb 8 2012 11:03:49:610AM | 1120208008 | Cornwall Lau | Plan:
raise nl04 to 7e19. Result: plasma. lots of LH trips. not much usable data. Next: increase outer gap by 6mm. |
| Feb 8 2012 11:17:13:740AM | 1120208009 | Cornwall Lau | Plan:
increase outer gap by 6mm. Result: plasma, but no usable LH data. Next: Decrease nl_04 from 0.7e20 to 0.5e20. Move LH position from 2mm behind GH to 1 mm behind GH. |
| Feb 8 2012 11:29:08:930AM | 1120208010 | Cornwall Lau | Plan:
Decrease nl_04 from 0.7e20 to 0.5e20. Move LH position from 2mm behind GH to 1 mm behind GH. Result: good plasma, good data. Next: change current to 800kA (mapping). ICRF pulse after 1.4s is back on. |
| Feb 8 2012 11:50:47:320AM | 1120208011 | Cornwall Lau | Plan:
change current to 800kA (mapping). ICRF pulse after 1.4s is back on. Result: good plasma. changing the current lower the langmuir probe density and seems to create too high reflection coefficients. Next: reduce outer gap by 6mm. order is J,E,D |
| Feb 8 2012 11:54:53:467AM | 1120208012 | Cornwall Lau | Plan:
reduce outer gap by 6mm. order is J,E,D Result: good plasma, good data. Next: reduce outer gap by 4 more mm. want a bit more data at higher LH langmuir probe densities. added D ICRF at 1.45 to 1.5s to see if anything happens with the gas puff. |
| Feb 8 2012 12:07:15:673PM | 1120208013 | Cornwall Lau | Plan:
reduce outer gap by 4 more mm. want a bit more data at higher LH langmuir probe densities. Result: plasma, injection caused disruption during plasma ramp down. got good plasma data. Next: reduce outer gap by 4 more mm. want a bit more data at higher LH langmuir probe densities. switch order of antennas to E,D,J |
| Feb 8 2012 12:28:22:113PM | 1120208014 | Cornwall Lau | Plan:
reduce outer gap by 4 more mm. want a bit more data at higher LH langmuir probe densities. switch order of antennas to E,D,J Result: good plasma, disruption in ramp down again. good data for this MP Next: change current to 1MA. |
| Feb 8 2012 12:36:23:810PM | 1120208015 | Cornwall Lau | Plan:
change current to 1MA. Result: good plasma, disruption just before ramp down. got plasma data. Next: reduce outer gap by 4mm. move LH launcher from 1mm behind GH limiter to 4mm behind GH limiter. |
| Feb 8 2012 12:41:39:533PM | 1120208016 | Cornwall Lau | Plan:
reduce outer gap by 4mm. move LH launcher from 1mm behind GH limiter to 4mm behind GH limiter. Result: fizzle Next: repeat |
| Feb 8 2012 12:56:33:167PM | 1120208017 | Cornwall Lau | Plan:
repeat Result: fizzle Next: repeat |
| Feb 8 2012 01:34:51:360PM | 1120208018 | Cornwall Lau | Plan:
repeat Result: another fizzle Next: repeat |
| Feb 8 2012 01:34:58:760PM | 1120208019 | Cornwall Lau | Plan:
repeat Result: another fizzle Next: repeat |
| Feb 8 2012 01:48:13:357PM | 1120208020 | Cornwall Lau | Plan:
repeat Result: fizzle Next: repeat |
| Feb 8 2012 02:04:13:023PM | 1120208021 | Cornwall Lau | Plan:
repeat Result: fizzle Next: repeat |
| Feb 8 2012 03:11:46:393PM | 1120208022 | Cornwall Lau | Plan:
repeat Result: fizzle Next: repeat. it's a bit early for groundhog day... cryopump will be turned off. |
| Feb 8 2012 03:18:09:180PM | 1120208023 | Cornwall Lau | Plan:
repeat Result: fizzle Next: repeat |
| Feb 8 2012 03:32:02:970PM | 1120208024 | Cornwall Lau | Plan:
repeat Result: fizzle Next: repeat |
| Feb 8 2012 03:51:55:360PM | 1120208025 | Cornwall Lau | Plan:
repeat Result: plasma! no LH Next: repeat with LH |
| Feb 8 2012 04:20:42:270PM | 1120208026 | Cornwall Lau | Plan:
repeat with LH Result: plasma. good data with LH Next: drop current to 800kA |
| Feb 8 2012 04:37:59:817PM | 1120208027 | Cornwall Lau | Plan:
drop current to 800kA Result: good plasma. good data Next: change current back to 1MA. change nl04 from 5e19 to 6.5e19. |
| Feb 8 2012 04:52:49:657PM | 1120208028 | Cornwall Lau | Plan:
change current back to 1MA. change nl04 from 5e19 to 6.5e19. Result: got plasma. got good data for this MP Next: raise LH power |
| Feb 8 2012 05:02:51:887PM | 1120208029 | Cornwall Lau | Plan:
raise LH power Result: got plasma. decent amount of LH tripping, but data was achieved. Next: last shot of the day. |
| Physics Operator Comments | |||
| Feb 8 2012 09:22:34:320AM | 1120208001 | Greg Wallace | Changes: Load seg 1 from shot -1 (2012 cryopump setup). Load seg 2 and 3 (active) from 1120127015. Change seg 3 Ip to 600 kA and nl_04 to 3e19.
Result: Plasma through rampdown. LH faulted on all restrikes. Density on LH probes is extremely low with outer gap of 1.8cm and launcher 3.5mm behind GH limiter. Next shot: Try again. Increase time between ICRF pulses. Adjust for phase drift in LH control system. Increase RCUR by ~1mm to decrease outer gap by ~2mm. Start TF rampdown at 1.75 s for Amanda. |
| Feb 8 2012 09:33:53:753AM | 1120208002 | Greg Wallace | Changes: Try again. Increase time between ICRF pulses. Adjust for phase drift in LH control system. Increase RCUR by ~1mm to decrease outer gap by ~2mm. Start TF rampdown at 1.75 s for Amanda.
Result: Disruption at 0.315 s. Something fell in? Next shot: Try again. |
| Feb 8 2012 09:59:41:270AM | 1120208003 | Greg Wallace | Changes: Try again. No DPCS changes.
Result: Disruption at 0.96 s. Another injection, I think. Cell access for DNB. Next shot: Increase nl_04 programming from 0.3e20 to 0.4e20. |
| Feb 8 2012 10:08:14:747AM | 1120208004 | Greg Wallace | Changes: Increase nl_04 programming from 0.3e20 to 0.4e20.
Result: Plasma through rampdown. Many LH trips but the later part of the pulse made it through. Increasing density seemed to help a bit. Next shot: Move LH launcher from 3.65 mm behind GH to 2.0 mm behind GH limiter. No DPCS changes. |
| Feb 8 2012 10:23:03:083AM | 1120208005 | Greg Wallace | Changes: Move LH launcher from 3.65 mm behind GH to 2.0 mm behind GH limiter. No DPCS changes.
Result: Plasma through rampdown. LH reflection coefficient goes up from ~20% to ~50% when D-port turns on. Interestingly the LH stays on the best during D-port??? Cell access for Cornwall. Next shot: Increase nl_04 to 0.5e20 in seg 3. |
| Feb 8 2012 10:34:31:403AM | 1120208006 | Greg Wallace | Changes: Increase nl_04 to 0.5e20 in seg 3.
Result: Plasma through rampdown. Clear increase in LH reflection coeff with ICRF power. Next shot: Move ICRF pulses closer together. No DPCS changes. |
| Feb 8 2012 10:54:25:213AM | 1120208007 | Greg Wallace | Changes: Move ICRF pulses closer together. No DPCS changes.
Result: Plasma through rampdown. More LH trips this time. Next shot: Enable PG1 (B side lower) Ar puff, 70 ms. Increase nl_04 from 0.5e20 to 0.7e20. |
| Feb 8 2012 11:08:29:540AM | 1120208008 | Greg Wallace | Changes: Enable PG1 (B side lower) Ar puff, 70 ms. Increase nl_04 from 0.5e20 to 0.7e20.
Result: Plasma through rampdown. LH faulting continuously. Looks on the reflected power like breakdown on plasma side. Next shot: Reduce RCUR from .659 to .656 (increase outer gap by 6mm). |
| Feb 8 2012 11:15:14:330AM | 1120208009 | Greg Wallace | Changes: Reduce RCUR from .659 to .656 (increase outer gap by 6mm).
Result: Plasma through rampdown. Many LH trips, looks like more breakdown on plasma side. Antenna doesn't seem to like the high line averaged density/neutral pressure. Next shot: Decrease nl_04 from 0.7e20 to 0.5e20. Move LH position from 3mm behind GH to 2 mm behind GH. |
| Feb 8 2012 11:29:27:343AM | 1120208010 | Greg Wallace | Changes: Decrease nl_04 from 0.7e20 to 0.5e20. Move LH position from 3mm behind GH to 2 mm behind GH.
Result: Plasma through rampdown. Much better LH pulse with lower density and closer launcher position. Next shot: Increase Ip to 800 kA. |
| Feb 8 2012 11:44:33:913AM | 1120208011 | Greg Wallace | Changes: Increase Ip to 800 kA.
Result: Plasma through rampdown. Poor LH coupling on this shot, looks like high refco is the culprit. Next shot: Decrease outer gap by 6mm (increase RCUR from 0.656 to 0.659). Switch ICRF antenna order. |
| Feb 8 2012 11:55:39:283AM | 1120208012 | Greg Wallace | Changes: Decrease outer gap by 6mm (increase RCUR from 0.656 to 0.659). Switch ICRF antenna order.
Result: Plasma through rampdown. Much better LH with smaller gap. Next shot: Decrease outer gap by 4mm (increase RCUR from 0.659 to 0.661). |
| Feb 8 2012 12:07:12:027PM | 1120208013 | Greg Wallace | Changes: Decrease outer gap by 4mm (increase RCUR from 0.659 to 0.661).
Result: Disruption in rampdown. Clean LH pulse. Reflections highest with D-port, then E-port, then J-port, then LH only. Next shot: Decrease outer gap by another 4mm (increase RCUR from 0.661 to 0.663). |
| Feb 8 2012 12:22:10:733PM | 1120208014 | Greg Wallace | Changes: Decrease outer gap by another 4mm (increase RCUR from 0.661 to 0.663).
Result: Plasma disrupts in rampdown. Breakdown on top row of LH launcher at 1.15 s causes a fault. One early fault due to high reflections? Next shot: Increase Ip to 1.0 MA. |
| Feb 8 2012 12:38:12:670PM | 1120208015 | Greg Wallace | Changes: Increase Ip to 1.0 MA.
Result: Disruption at 1.47 s. Pretty good LH with very low reflections during J and with no ICRF, high reflections during E and especially D. Next shot: Decrease outer gap by another 4mm (increase RCUR from 0.663 to 0.665) Move LH launcher to ~4 mm behind GH limiter. |
| Feb 8 2012 12:50:04:860PM | 1120208016 | Greg Wallace | Changes: Decrease outer gap by another 4mm (increase RCUR from 0.663 to 0.665) Move LH launcher to ~4 mm behind GH limiter.
Result: Fizzle. Breakdown is a little later than on shot 15. Bounces at ~13 ms, big spike in CIII and H-alpha. Fields and pressure look good. Next shot: Try again. Might be a post-disruption fizzle? No DPCS changes. |
| Feb 8 2012 01:06:39:900PM | 1120208017 | Greg Wallace | Changes: Try again. Might be a post-disruption fizzle? No DPCS changes.
Result: Fizzle again. Datasystem seems stuck. Next shot: Increase PG4 prepuff from 30 ms to 36 ms to see if that fixes bounce. |
| Feb 8 2012 01:18:58:153PM | 1120208018 | Greg Wallace | Changes: Increase PG4 prepuff from 30 ms to 36 ms to see if that fixes bounce.
Result: Another fizzle. No bounce this time but late breakdown that never really took off. Next shot: Reduce PG4 prepuff from 36 to 33 ms. |
| Feb 8 2012 01:47:13:890PM | 1120208019 | Greg Wallace | Changes: Reduce PG4 prepuff from 36 to 33 ms.
Result: Another fizzle. Next shot: Decrease PG4 prepuff from 33 to 30 ms. |
| Feb 8 2012 01:58:41:877PM | 1120208020 | Greg Wallace | Changes: Reduce PG4 prepuff from 33 to 30 ms.
Result: Fizzle again. Next shot: Reduce PG4 prepuff from 30 to 27 ms. |
| Feb 8 2012 02:07:53:310PM | 1120208021 | Greg Wallace | Changes: Reduce PG4 prepuff from 30 to 27 ms.
Result: Closer, but still a fizzle. Breakdown is slightly late. Next shot: ECDC for 20 min before the next shot. Change IC_EF4U from -1310 to -1320 at t=0 to decrease Bz0. |
| Feb 8 2012 03:13:39:350PM | 1120208022 | Greg Wallace | Changes: ECDC for 20 min before the next shot. Change IC_EF4U from -1310 to -1320 at t=0 to decrease Bz0.
Result: Fizzle again despite ECDC. Current never ramped up. Next shot: Turn off cryopump. Reduce PG4 prepuff from 27 to 13 ms to account for lack of cryopump. |
| Feb 8 2012 03:18:06:103PM | 1120208023 | Greg Wallace | Changes: Turn off cryopump. Reduce PG4 prepuff from 27 to 13 ms to account for lack of cryopump.
Result: Fizzle again!??! Next shot: Reduce PG4 prepuff again, this time from 13 to 10 ms. |
| Feb 8 2012 03:36:57:380PM | 1120208024 | Greg Wallace | Changes: Reduce PG4 prepuff again, this time from 13 to 10 ms.
Result: Fizzle. Next shot: Reduce early PG3 puff. |
| Feb 8 2012 03:54:47:657PM | 1120208025 | Greg Wallace | Changes: Reduce early PG3 puff.
Result: Plasma through rampdown!!! No LH due to TPS CNTRLX fault (lost communication with active control system). Next shot: Repeat. No DPCS changes. |
| Feb 8 2012 04:19:32:250PM | 1120208026 | Greg Wallace | Changes: Repeat. No DPCS changes.
Result: Plasma through rampdown. Good shot! LH worked on this shot. Next shot: Reduce Ip to 800 kA. |
| Feb 8 2012 04:39:08:263PM | 1120208027 | Greg Wallace | Changes: Reduce Ip to 800 kA.
Result: Plasma through rampdown. LH looks better after adjusting for phase drift. Next shot: Increase nl_04 demand to 6.5e19. Increase Ip to 1.0MA. |
| Feb 8 2012 04:52:27:847PM | 1120208028 | Greg Wallace | Changes: Increase nl_04 demand to 6.5e19. Increase Ip to 1.0MA.
Result: Plasma through rampdown. A few early LH faults then ran clean for the rest of the pulse. Next shot: No DPCS changes. Double LH power to 120 kW/klystron. |
| Feb 8 2012 05:23:06:070PM | 1120208029 | Greg Wallace | Changes: No DPCS changes. Double LH power to 120 kW/klystron.
Result: Plasma through rampdown. Last shot of the day. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:00:12:450AM | Plasma | Ok | |
| 2 | 09:23:05:593AM | Plasma | Ok | |
| 3 | 09:38:50:347AM | Plasma | Ok | |
| 4 | 09:57:20:770AM | Plasma | Ok | |
| 5 | 10:10:09:923AM | Plasma | Ok | |
| 6 | 10:26:17:470AM | Plasma | Ok | |
| 7 | 10:39:08:557AM | Plasma | Ok | |
| 8 | 10:51:50:327AM | Plasma | Ok | |
| 9 | 11:06:35:390AM | Plasma | Ok | |
| 10 | 11:19:17:850AM | Plasma | Ok | |
| 11 | 11:32:30:723AM | Plasma | Ok | |
| 12 | 11:46:11:917AM | Plasma | Ok | |
| 13 | 11:59:04:027AM | Plasma | Ok | |
| 14 | 12:11:53:157PM | Plasma | Ok | |
| 15 | 12:25:12:560PM | Plasma | Ok | |
| 16 | 12:39:12:737PM | Plasma | Ok | |
| 17 | 12:52:05:117PM | Plasma | Ok | |
| 18 | 01:07:47:773PM | Plasma | Ok | |
| 19 | 01:31:51:970PM | Plasma | Ok | |
| 20 | 01:44:51:530PM | Plasma | Ok | |
| 21 | 01:59:56:773PM | Plasma | Ok | |
| 22 | 03:01:25:310PM | Plasma | Ok | |
| 23 | 03:14:24:257PM | Plasma | Ok | |
| 24 | 03:27:56:447PM | Plasma | Ok | |
| 25 | 03:44:59:337PM | Plasma | Ok | |
| 26 | 04:12:19:453PM | Plasma | Ok | |
| 27 | 04:30:03:883PM | Plasma | Ok | |
| 28 | 04:42:43:557PM | Plasma | Ok | |
| 29 | 04:55:46:960PM | Plasma | Ok | |
| System Availability | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Feb 8 2012 07:08:30:790AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Unforeseen circumstances limited the amount of time ECDC was operated to 1 hour and 10 minutes. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Feb 8 2012 08:59:53:830AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||