| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Yuri Podpaly |
| Physics operator(s): | Bill Rowan |
| Engineering operator(s): | Bill Parkin,Sam Pierson,Bill Byford |
| Engineering Operator Run Comment |
| MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning |
| Session Leader Plans |
| Entered: Feb 14 2012 09:35:53:420AM |
| Author: Greg Wallace |
| Session leader plan for 1120215
Session Leader: G. Wallace Physics Operator: W. Rowan MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning LH Setup: Launcher ~3 mm behind GH limiter (1290 counts on PLC); 90 degree current-drive phasing; 200-1000 kW net power (~70-200 kW/klystron); LH on from 0.8 to 1.3s. Reference shot: 1120127024 (5.4 T, 700 kA, USN) Shot Plan: 1) Begin with co-current 90 degree ideal phasing. Set power level to 80 kW/klystron (half on direct fed columns) at 40 kV. Set pulse length to 0.5 s. 2) Increase power in increments of 10-20 kW/klystron. Pay particular attention to LH camera view. If arcing occurs, reduce power to last "safe" level and begin raising power again. 3) Adjust radial position of plasma and/or launcher if breakdown on grill mouth does not improve. |
| Entered: Feb 14 2012 04:14:30:957PM |
| Author: Yuri Podpaly |
| MP 633: Lower Hybrid Current Drive induced rotation at Different Magnetic Geometries
SL: Y. Podpaly PO: W. Rowan Plan: Run straight forward lower hybrid discharges tracking the rotation at different densities and magnetic fields, time permitting. The run is intended to confirm the relation between the Ohmic rotation reversal and the LHCD rotation reversal. Diagnostics requested: HiReX Sr, HiReX Jr, Thomson, PCI, HXR, MSE Basic set-up: 5.4 T, 700 kA, USN, nl04~0.4E20, cryopump on for density control P_LHCD = 800 kW at n|| = 1.6 extended Lower Hybrid operation (starting at 500 ms and working up) Base shot: 1110128009 or 1120127024. Extended flattop (to 1.6 seconds) requested for longer LHCD discharges. Run plan: 1)Locked mode calibration for HiReX Sr (1120210004) 2)nl04~0.4E20 400 kA, 700 kA, 550 kA. 3)nl04~0.3E20 400 kA, 550 kA, 700 kA (possibly add another shot). At this density, depending on results, we will scan n|| to 1.9 and 2.3. 4)nl04~0.6E20 550 kA, 700 kA, 550 kA (possibly add other shots) 5)Depending on previous results: nl04~0.5 E20 scan 6)Time permitting magnetic field scan: 4.5T, 6.2 T at nl04~E20 400 kA, 550 kA, 700 kA 7)Tentative: locked mode calibration for HiReX Sr(1120210004) Piggybacking: MSE piggybacking, polarimetry, Lyman alpha camera. Possible current dither for polarimetry at later shots. |
| Physics Operators Plans |
| Entered: Feb 15 2012 10:50:58:630AM |
| Author: Bill Rowan |
| Physop Setup for Run 1120215, Wednesday, February 15, 2012
MP633 - LHCD induced rotation at different magnetic geometries SL: Podpaly PO: Rowan ----------------- Engineering Setup ----------------- Run begins at 09:00 and ends at 17:00 Power systems as on: 1120127024 (5.4 T, 700 kA, USN) Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled Gas Setup: fill B-Top with 6 psi D2 Hybrid enabled (PG4) fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1) leave B-side upper as is Hybrid DISABLED (PG2) fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3) fill H-bottom with 15 psi D2 Hybrid DISABLED (PG5) leave B-div as is Hybrid DISABLED (PG6) leave H-div as is Hybrid DISABLED (PG7) fill NINJA with 10 psi D2 Hybrid DISABLED Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus Leave z-bolo shutter as is (should be open) Torvac gatevalve toggle (yes/no): no Boronization(yes/no): no Overnight ECDC (yes/no): yes ICRF(yes/no): no LH(yes/no): no Cryopump (yes/no): yes DNB (yes/no): yes Vessel temperature: 35/35/35 ------------------------------ ECDC Parameters (if requested) ------------------------------ gas and pressure: D2 at 2e-4 Torr sweep: 44/45/103 cm scan: 20/120 s Required sub-systems: LH, cryopump, SOL reflectometer, LH Langmuir probes |
| Session Leader Summaries |
| Entered: Feb 15 2012 06:15:24:970PM |
| Author: Yuri Podpaly |
| This was a difficult day, and the experiment was not accomplished, due to difficulties with LHCD, data system issues, and machine issues. None of the required scans could be performed at the necessary powers.
Nevertheless, some useful data were found. A 3 point current scan of locked modes was performed and it seems that the current does not affect the HiReX calibration significantly. More detailed analyses of these discharges are required to test the HireX Sr calibraiton. A single current scan at nl04~0.4E20 was performed, with the low current case not reproducing the previously observed results. This suggests that there may be a temperature affect in the LHCD rotation reversal, perhaps related through the collisionality. It was attempted to bring up the LHCD power late in the day to confirm this effect, and a few useful shots were taken with the rotation reversal point being identified at 600 kW at 500 kA. Higher density with 600 kW of LHCD at 500 kA was attempted, but it was not successful. There appears to be more than originally met the eye with the LHCD induced rotation changes, seemingly on the collisionality side of things. Thank you everyone for sticking with this run. |
| Physics Operator Summaries |
| Entered: Feb 16 2012 07:56:42:897AM |
| Author: Bill Rowan |
|
The run was for MP 633: Lower Hybrid Current Drive induced rotation at Different Magnetic Geometries (SL Podpaly) which was to be executed during LH conditioning: MP: 605 LH2 Lower Hybrid Launcher Checkout and Conditioning (SL Wallace) The requested discharges were easily acquired and ran well. The discharges for MP 633 consisted of a narrow scan in current (0.4 MA to 0.7 MA) and density in USN configuration at 5.4 T. The cryo pump was in use. Some data was acquired for MP 633 but more is required. The LH appears to require additional conditioning. While the LH group was diagnosing control problems, there was an opportunity to continue the locked mode rotation calibration for a few extra shots. The locked mode shots are in the range 001 - 005. For some shots (009-012), a current dither was added in the last 100 ms of the current flattop for polarimeter calibration. There was a delay at the beginning of the run due to computer control of the LH. The run was extended to make up some of the lost time. A few shots were lost due to IGOR being stuck. A TF crowbar occurred late in the run. 23 plasma 03 engineering: 007(no power shot),018(TF crowbar,019 (test via plc) ---------- 26 total |
| Session Leader Comments | |||
| Feb 15 2012 09:14:00:380AM | 1120215001 | Yuri Podpaly | Start with 700 kA, standard flattop, USN, nl04=0.4E20, LHCD at 0.8 for 500 ms at 800 kW (n||=1.6) or as close as is possible.
Lower Hybrid having some digitizer issues. Contingency: locked mode first Result: locked but HiReX Sr is low. LHCD still having issues and the RGA readings are off. Also Josh says to wait for the next shot. Next: Repeat locked mode pending LHCD |
| Feb 15 2012 09:52:12:263AM | 1120215002 | Yuri Podpaly | Locked mode with increased argon voltage.
Result: Locked mode; argon is much better. B side lower still looks choppy. Disrupts at 1.5 sec. Next: LHCD is down for at least half an hour. Setting up 900 kA locked mode to test Sr sensitivity to locked modes. |
| Feb 15 2012 09:59:41:077AM | 1120215003 | Yuri Podpaly | 900 kA locked mode.
Result:Looks like it locked. Helium like system is behaving strangely. Next: 700 kA locked mode. |
| Feb 15 2012 10:31:19:247AM | 1120215004 | Yuri Podpaly | 700 kA locked mode.
Run has been extended to 6PM so we can have a full LH run. Thank you everyone. Result:Locked. Good data Next: 900 kA locked mode. Still waiting for LHCD. |
| Feb 15 2012 10:47:50:757AM | 1120215005 | Yuri Podpaly | 900 kA locked mode.
Result:Locked Next: LHCD. |
| Feb 15 2012 12:28:29:440PM | 1120215006 | Yuri Podpaly | 700 kA discharge at nl04-0.4, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 800 kW
Result: LHCD still working up in power. Surprisingly large amount of rotation for this power level. Next: Repeat with same power to avoid injections. |
| Feb 15 2012 12:49:18:640PM | 1120215007 | Yuri Podpaly | Target: 700 kA discharge at nl04-0.4, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 800 kW
Result: Igor hung. No power shot. Next: try again. Apparently, we are taking shot 7 again. Result: IGOR problems again. Next: Take shot 7 again. |
| Feb 15 2012 01:06:16:250PM | 1120215008 | Yuri Podpaly | Target: 700 kA discharge at nl04-0.4, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 800 kW
Result: nice clean LHCD at P = 300 kW Next: try again with more power |
| Feb 15 2012 01:19:25:260PM | 1120215009 | Yuri Podpaly | Target: 700 kA discharge at nl04-0.4, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 800 kW
Result:very late disruption. LHCD has some issues but gets about 500 kW in. Next: try again with whatever LH needs. |
| Feb 15 2012 01:33:46:100PM | 1120215010 | Yuri Podpaly | Target: 700 kA discharge at nl04-0.4, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 800 kW
Result:disruption. Bright spot seen on WIDE 2 before disruption. Next: stay at 500 kW of LHCD. Drop current to 550 kA. |
| Feb 15 2012 02:02:39:410PM | 1120215011 | Yuri Podpaly | Target: 550 kA discharge at nl04-0.4, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 500 kW
Result: worked. DV = -7 kms Next: 400 kA |
| Feb 15 2012 02:03:00:960PM | 1120215012 | Yuri Podpaly | Target: 400 kA discharge at nl04-0.4, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 500 kW
Result: LHCD was tripping too much. Next: repeat |
| Feb 15 2012 02:20:52:780PM | 1120215013 | Yuri Podpaly | Target: 400 kA discharge at nl04-0.4, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 500 kW
Result: Good shot but the rotation is not consistent with our previous results Next: IP -> 350 kA. |
| Feb 15 2012 02:38:07:347PM | 1120215014 | Yuri Podpaly | Target: 350 kA discharge at nl04-0.4, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 500 kW
Result: Really bizarre shot. Next: Let's not do that again. nl04->0.3E20, ip->400kA. |
| Feb 15 2012 02:51:27:923PM | 1120215015 | Yuri Podpaly | Target: 400 kA discharge at nl04-0.3, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 500 kW
Result: not so great LHCD Next: try again. |
| Feb 15 2012 03:24:24:117PM | 1120215016 | Yuri Podpaly | Target: 400 kA discharge at nl04-0.3, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 500 kW
Result: no LHCD. Next: Cut the argon to 75 ms. Try again. |
| Feb 15 2012 03:29:08:143PM | 1120215017 | Yuri Podpaly | Target: 400 kA discharge at nl04-0.3, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 500 kW
Result: still difficulties with LHCD. Possible marfing? Hard to say what is happening with rotation with so many things going on. Next: Turn off the argon. Move LHCD to 1.0-1.5 seconds. |
| Feb 15 2012 04:23:04:180PM | 1120215018 | Yuri Podpaly | Target: 400 kA discharge at nl04-0.3, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = 500 kW
Result: TF crowbar Next: repeat. Argon to 35 ms. There is really insufficient time to complete these scans. We will try to get the LHCD power up and see if there is a collisionality effect with the LHCD rotation reversal. |
| Feb 15 2012 04:26:17:937PM | 1120215019 | Yuri Podpaly | PLC test
Next: repeat shot 17 and try to bring up the LHCD power to 800 kW in future shots. |
| Feb 15 2012 04:42:23:687PM | 1120215020 | Yuri Podpaly | Target: 400 kA discharge at nl04-0.3, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = as high as it can go
Result: Tripping LHCD Next: repeat try to get the LHCD up. |
| Feb 15 2012 05:06:44:233PM | 1120215021 | Yuri Podpaly | Target: 400 kA discharge at nl04-0.3, with 500 ms of LHCD at 0.8s n||=1.6, PLHCD = as high as it can go
Result: Tripping LHCD. Something came out of the launcher. Next: repeat try to get the LHCD. Increase argon to 40. Scratch that. Fiducial LHCD shot to see if things are still ok with LHCD. |
| Feb 15 2012 05:13:29:860PM | 1120215022 | Yuri Podpaly | LHCD trips out on a known good shot
Next: do what Greg says to do. |
| Feb 15 2012 05:36:32:030PM | 1120215023 | Yuri Podpaly | LHCD runs for 700 ms.
Next: 500 kA try to get some power in. |
| Feb 15 2012 05:47:46:250PM | 1120215024 | Yuri Podpaly | LHCD ran. No rotation change at 500 kA with 600 kW of LHCD.
Next: nl04-> 0.5E20 |
| Feb 15 2012 06:02:03:050PM | 1120215025 | Yuri Podpaly | LHCD tripped out
Next: Last shot and density trace was low. |
| Feb 15 2012 06:14:56:547PM | 1120215026 | Yuri Podpaly | Marfing
Last shot. Thank you everyone. |
| Physics Operator Comments | |||
| Feb 15 2012 09:01:31:687AM | Bill Rowan | setup for first shot
load 1120210004, segement 3 is on import 1120214031 segment 01 | |
| Feb 15 2012 09:39:11:170AM | 1120215001 | Bill Rowan | 001.
locked mode shot. enable b-side lower puff 300 ms Argon via PG1 locked, disruption only in ramp down Next shot. Increase the PG1 voltage to 60 in segment 3 This is an increase from 30 on the previous shot |
| Feb 15 2012 09:54:40:723AM | 1120215002 | Bill Rowan | 002
another locked mode shot proceeding without LH some delay for cryo regen before this shot next shot load shot 1111215031 import segment 1 from 1120215002 LH down for approx a half hour in the meantime doing a couple of more locked modes, this one at 900 kA |
| Feb 15 2012 10:21:05:243AM | 1120215003 | Bill Rowan | 003.
locked at 900 kA disruption at 0.9 s next shot reduce the current to 700 kA |
| Feb 15 2012 10:21:23:427AM | 1120215004 | Bill Rowan | 004.
disruption during rampdown appears to have locked next shot. cell access for continued work on LH control reload 003 for another 900 kA locked mode |
| Feb 15 2012 10:31:49:160AM | 1120215004 | Bill Rowan | ************************************
the run will extend for another hour to 18:00 ************************************** |
| Feb 15 2012 12:10:21:567PM | 1120215005 | Bill Rowan | 005.
disrupted at 1.14 s appears to be a locked mode next shot load 1120127024 import segment 01 1120215005 increase argon pulse length (PG1) from 70 ms to 100 ms starting at 300 ms long delay due to LH network problems |
| Feb 15 2012 12:37:02:060PM | 1120215006 | Bill Rowan | 006.
nl_04 = 0.37e+19 ip = 0.717 MA LH apparent on loop voltage outer gap is 1.5 cm injection at 1.1 s next shot reduce the outer gap by 2 mm |
| Feb 15 2012 12:30:06:500PM | 1120215007 | Bill Rowan | 007.
no power shot IGOR among other things |
| Feb 15 2012 01:10:58:007PM | 1120215008 | Bill Rowan | 008.
full length shot through ramp down next shot add a small variation in current between 1.4 and 1.5 s for polarimeter calibration |
| Feb 15 2012 01:18:01:283PM | 1120215009 | Bill Rowan | 009.
Full length shot. several injections during the shot. The polarimeter dither seems to be innocent. Next shot. No pcs changes |
| Feb 15 2012 01:35:24:637PM | 1120215010 | Bill Rowan | 010.
plasma disruption at 0.9s next shot. reduce the current to 550 kA left the polarimeter dither in. it is proportionately larger of course |
| Feb 15 2012 01:55:27:570PM | 1120215011 | Bill Rowan | 011.
plasma full length next shot ip = 400kA rxl = -0.02 |
| Feb 15 2012 02:10:09:313PM | 1120215012 | Bill Rowan | 012.
plasma full length LH not constant do this again. next shot removed the polarimeter dither increase the outer gap by approx 5 mm |
| Feb 15 2012 02:24:04:127PM | 1120215013 | Bill Rowan | 013.
plasma full length next shot decrease current to a set point of 350 kA increase the outer gap by approx 3 mm |
| Feb 15 2012 02:49:38:647PM | 1120215014 | Bill Rowan | 014.
plasma full length most interesting, but not quite where we want to go next shot increase the current to 400 kA by reloading 013 then increase the outer gap by approx 3 mm |
| Feb 15 2012 02:54:40:460PM | 1120215015 | Bill Rowan | 015.
plasma full length next shot. no pcs changes |
| Feb 15 2012 03:08:22:383PM | 1120215016 | Bill Rowan | 016.
plasma full length next shot. SL requested that the argon be reduced to 75 ms |
| Feb 15 2012 03:14:01:097PM | 1120215016 | Bill Rowan | 016.
plasma full length next shot. SL requested that the argon be reduced to 75 ms decrease the outer gap by 10 mm |
| Feb 15 2012 03:31:06:097PM | 1120215017 | Bill Rowan | decrease outer gap by 2 mm |
| Feb 15 2012 03:34:24:223PM | 1120215017 | Bill Rowan | 017.
plasma full length next shot turn off the argon decrease outer gap by 2 mm |
| Feb 15 2012 03:37:26:217PM | 1120215018 | Bill Rowan | 018.
TF crowbar |
| Feb 15 2012 03:43:11:013PM | 1120215018 | Bill Rowan | 018.
TF crowbar next shot increase the argon to 35 ms |
| Feb 15 2012 04:30:44:580PM | 1120215019 | Bill Rowan | 019.
plc test TF only successful test next shot is plasmas |
| Feb 15 2012 04:47:41:093PM | 1120215020 | Bill Rowan | 020.
Please full length Couple of impurity injections next shot. start the tf ramp down earlier |
| Feb 15 2012 05:08:05:243PM | 1120215021 | Bill Rowan | 021.
plasma full length Next shot At request of LH reload 1120127024 imported 1120215020 |
| Feb 15 2012 05:14:36:553PM | 1120215022 | Bill Rowan | 022.
Plasma full length Next shot No PCS changes |
| Feb 15 2012 05:28:51:440PM | 1120215023 | Bill Rowan | 023.
Plasma Full Length Next shot. |
| Feb 15 2012 05:32:16:270PM | 1120215023 | Bill Rowan | 023.
Plasma Full Length Next shot. IP reduced to 500 kA |
| Feb 15 2012 05:47:16:070PM | 1120215024 | Bill Rowan | 024.
Plasma full length Next shot. nl_04 = 0.5e+19 |
| Feb 15 2012 05:59:28:143PM | 1120215025 | Bill Rowan | 025.
plasma full length |
| Feb 15 2012 06:04:20:223PM | 1120215025 | Bill Rowan | 025.
plasma full length Next shot increased density increase prefill by 1 ms |
| Feb 15 2012 06:14:03:453PM | 1120215026 | Bill Rowan | 026.
plasma full length last shot |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:04:06:297AM | Plasma | Ok | |
| 2 | 09:34:42:907AM | Plasma | Ok | |
| 3 | 09:54:04:283AM | Plasma | Ok | |
| 4 | 10:07:52:760AM | Plasma | Ok | |
| 5 | 10:43:49:873AM | Plasma | Ok | |
| 6 | 12:09:32:590PM | Plasma | Ok | |
| 7 | 12:24:49:610PM | Test | Bad | |
| 8 | 01:00:37:240PM | Plasma | Ok | |
| 9 | 01:14:03:930PM | Plasma | Ok | |
| 10 | 01:27:45:270PM | Plasma | Ok | |
| 11 | 01:41:06:787PM | Plasma | Ok | |
| 12 | 01:56:18:237PM | Plasma | Ok | |
| 13 | 02:11:55:777PM | Plasma | Ok | |
| 14 | 02:28:48:797PM | Plasma | Ok | |
| 15 | 02:47:07:937PM | Plasma | Ok | |
| 16 | 03:02:44:357PM | Plasma | Ok | |
| 17 | 03:18:28:197PM | Plasma | Ok | |
| 18 | 03:34:31:010PM | Plasma | Bad | TF Power Supply Comm Fault |
| 19 | 04:26:50:940PM | Test | Ok | TF PLC Test ok |
| 20 | 04:37:37:053PM | Plasma | Ok | |
| 21 | 04:52:20:140PM | Plasma | Ok | |
| 22 | 05:08:51:747PM | Plasma | Ok | |
| 23 | 05:24:32:353PM | Plasma | Ok | |
| 24 | 05:40:13:670PM | Plasma | Ok | |
| 25 | 05:56:27:273PM | Plasma | Ok | |
| 26 | 06:11:34:900PM | Plasma | Ok | |
| System Availability | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Feb 15 2012 09:03:46:407AM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||