Alcator C-Mod Run 1120221 Information

Back to runs

Miniproposals
Miniproposal:
Date Filed:
Title:
First Author:
Session Leader:Anne White (shots 21-29)
Session Leader:Matt Reinke (shots 30-34)
Miniproposal:689
Date Filed: 1/11/2012
Title:Validation of gyrokinetic transport models across the ITG/TEM boundary in L-mode and I-mode plasmas
First Author:Anne White
Session Leader:Nathan Howard (shots 1-6)
Session Leader:Anne White (shots 7-20)

Operators
Session leader(s):Nathan Howard,Anne White,Anne White,Matt Reinke
Physics operator(s):Syunichi Shiraiwa
Engineering operator(s):Bill Cochran,Bill Parkin,Thomas Toland

Engineering Operator Run Comment
MP 689: ITG TEM Boundary Experiment -- Supporting JRT 2012

Session Leader Plans
Entered: Feb 20 2012 02:41:49:733PM
Author: Anne White
***********************************************************
MP 689: ITG TEM Boundary Experiment -- Supporting JRT 2012
Run 1120221
***********************************************************
Background and Motivation:

The goal for today is to produce high power L-mode and I-mode plasmas at low density, with dominant electron heating in order to favor dominance of TEM instead of ITG. We hope to collect a complete set of excellent profile data HIREX (Ti, Rotation), TS (Te, ne), GPC, FRCECE (Te) and turbulence data (PCI, FTCI, reflectometer, polarimeter, CECE) for validation studies to investigate how well GYRO and similar codes can reproduce experimental transport levels and turbulence in TEM vs ITG L-mode and I-mode plasmas. This experiment supports the 2012 Joint Research Target. In order to guide the experiment during the run, we will be performing in between shot profile analysis and linear stability analysis with GYRO in order to assess when and whether we cross the boundary from ITG to TEM dominated plasmas.

**** Run Plan ******

The basic plan for Tuesday is to begin by reproducing shot 1101014012, and then
reproducing shot 1101014006. These two shots represent our TEM and ITG target, respectively. We also must have a locked mode shot as the first shot of the day and last shot of the day (for HIREX calibration).

Lots of fluctuation data are requested: PCI, FTCI, reflectometer, polarimeter, and CECE

****** Set Up *******

1101014012 was an USN plasma, Bt = 5.35T, Ip = 800 kA
nl04 = 0.67, with 3 MW RF. 1101014006 was same except for 1 MW RF.

We want regular ECDC over night.

For first attempt at reproducing shot 1101014012 we want RF request at 4 MW, all antennas at 78 and 80 MHZ, RF on at 0.5 sec and off at 1.5 sec.

Cryopump == YES

Special gas request: We want Argon puff for HIREX SR.

NO NINJA PUFF unless SL okays this! This is critical since density control is very important in the experiment.

********** Shot by Shot Run Plan *********

1) Reproduce shot 1101014012: Bt = 5.35 T, Ip = 800 kA, nl04 = 0.67 x
10^19 m-2,
4 MW RF power (all antennas at 78,80 MHz) (1 shot)

2) Reproduce locked mode shot 1120216029 for HIREX SR calibration data (1 shot)

3) If step 2) shot went into H-mode, then drop RF power to 3.5 MW, and repeat.
If still H-mode then go to 3.0 MW to get a steady L-mode phase (1-2 shots)
4) Assess linear stability for high power L-mode shot from step 2 or
step 3. If
L-mode is TEM dominant, then repeat for statistics (2-3 shots) and skip
to step
9.

5) If step 4) linear stability analysis showed the high power L-mode is ITG
dominant, then reduce current to 600 kA and repeat shot ( 1 shot)

6) Assess linear stability for low current high power L-mode shot from
step 5.
If L-mode is TEM dominant, then repeat for statistics (2-3 shots) and skip to
step 9

7) Assess linear stability for high power, low current L-mode shot
from step 6.
If L-mode is ITG dominant, then keep current at 600 kA but reduce density to
nl04 = 0.5 x10-19 m-2 and repeat shot (1 shot)

8) Assess linear stability for low current, low density shot from step
7. If TEM
dominant, then repeat for statistics (2-3 shots), if ITG dominant then decide
whether to try another reduction in density or current or both and take shot
again to get the TEM dominant shot (1-2 shots)

9) In this step we get the low power L-mode that is ITG dominant. Run a shot
like 1101014006, a 1 MW shot. Assess linear stability, but we really expect
ITG, and don't foresee any surprises here. Repeat this ITG low power shot for
statistics (2-3 shots).

10) If steps 1-9 are successful (or if getting clear TEM doniannce in L-mode
appears unlikely) then we will transiiton and try running shots with a
RF power
step at 1.0 sec to cause a transition from L-I mode so we can get data for L-I
reduction experiment (5-6 shots). The I-modes may also give interesting TEM
dominant data of interest.

11) End the day with another locked mode shot for HIREX Sr calibration
( 1 shot)

Physics Operators Plans
Entered: Feb 21 2012 08:54:12:210AM
Author: Syunichi Shiraiwa
MP 689: ITG TEM Boundary Experiment -- Supporting JRT 2012

SL A. White
PO S. Shiraiwa
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1120215001 (5.4 T, 700 kA, USN)

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid enabled (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes (4MW all antennas at 78 or 80 MHz)
LH(yes/no): no
Cryopump (yes/no): yes
DNB (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

-------------------------------
PO preparation
-------------------------------
1) Reference shot is 1101014012 (USN plasma, Bt = 5.35T, Ip = 800 kA, nl04 = 0.67.)
2) Locked mode for HiReX Sr (1120210004 ?)

Session Leader Summaries
Entered: Feb 21 2012 05:07:21:823PM
Author: Anne White
***************** Summary of Run 1120221 *********************

MP 689 : Boundary between ITG and TEM for JRT 2012

This run was very successful, thank you everyone !!

***************** First Half of Day *********************

We were successful at reproducing target shots of interest, and we used in between shot linear GYRO analysis. The analysis indicates that we did cross the ITG TEM boundary in high power L/I mode plasmas. We were also successful at obtaining core fluctuation measurements with reflectometer and PCI. RF ran beautifully. For notes on in between linear GYRO analysis, please see TRANSPORT entries in logbook.

At this point in time, we have two nice pairs of shots that warrant a closer look:
1120221019, 1120221020 are a pair of high/low power shots at 0.7 MA, nl04 ~ 0.55
1120221014, 1120221012 are a pair of high/low power shots at 0.8 MA, nl04 ~ 0.50

and closer looks at the other pairs are needed. Lots of great data !!!


***************** Second Half of Day *********************

We were successful at making several very nice L-I transitions, using power steps and power ramps.

Good L-I transition shots to look more at later:
1120221021
1.0 MA, nl04=0.8, power ramp 2.0 -3.5 MW, LI transition? at 0.95 s
1120221023
1.0 MA, nl04 = 0.8, power steps, L-I transition near 1.0 sec
1120221024
1.0 MA, nl04 = 0.8, at 1.0 sec,step RF 2.5MW to 3.5MW , no LI transition
1120221025
1.1 MA, nl04 = 0.8, at 1.0 sec,step RF 2.5MW to 3.5MW ,good!! LI transition
shots 26, 27, 28, went back to RF power ramps to really pinpoint transition. But several late RF trips and high radiation early in time make these less clear cases compared to earlier shots.

***************** Last Hour of Day *********************

Ran M. L. Reinke's piggy back shots for fast Ti profiles.
Use Ar puffs of 250 ms to increase HIRE SR signal to allow for using
very fast time resolution settings. Goal is to resolve Ti during sawtooth cycle.
Information obtained during these shots will help to assess Ti vs Te changes suring sawteeth in I-mode, and is relevant/supports the MP 689 transport analysis and profile analysis.

Physics Operator Summaries
Entered: Feb 21 2012 05:19:40:763PM
Author: Syunichi Shiraiwa
Run Summary for 1120221

MP689: ITG TEM Boundary Experiment -- Supporting JRT 2012

SL A. White
PO S. Shiraiwa

The machine worked pretty well today.

We had 34 attempt to make a plasma, and got all start-up
as requested. No fizzle.

First two shots (#2 and #3) had tungsten injection from
upper diverter probes, which caused disruptions.
We adjusted RXU to avoid this and after #3, the most of
discharge went well until the ramp-down phase, except
for #7 and #22

#22 had very early injection causing disruption at 0.02s.

We ran out of He for cryo-pump at #28. After #29, the
machine was operated without using cryopump to do
fast Ti measurement.



Session Leader Comments
Feb 21 2012 08:31:43:957AM1120221001Nathan HowardITG/TEM Boundary Experiment for Transport Model Validation


Shot 1, is a repeat of shot 1101014012 (nl04 =.67, Ip=0.8MA), attempting 4 MW ICRH.
Feb 21 2012 09:15:38:857AM1120221001Nathan HowardTargets for this Shot:
--------------------------
nl04=.67
Ip= 0.8 MA
Bt= 5.35
PICRH = 3.5 MW

Notes: The max power at this time is 3.5 MW.

Feb 21 2012 09:36:13:217AM1120221001Nathan HowardTargets for this Shot was:
--------------------------
nl04=.67
Ip= 0.8 MA
Bt= 5.35
PICRH = 3.5 MW

Notes: The RF appears to be good. The shot disrupted at about .7 seconds via Tungsten injection...Brunner!

Feb 21 2012 10:02:24:090AM1120221003Nathan HowardTargets for this Shot was:
--------------------------
nl04=.67
Ip= 0.8 MA
Bt= 5.35
PICRH = 3.5 MW

Notes: The RF appears to be good. The shot disrupted at about 1.2 seconds. Very hot. Probably an I-mode

Feb 21 2012 10:03:23:203AM1120221004Nathan HowardTargets for this Shot was:
--------------------------
nl04=.67
Ip= 0.8 MA
Bt= 5.35
PICRH = 3.5 MW

Notes: The RF appears to be good. Lasted the whole time...still got a W injection but a good time period from .95 to 1.05 was obtained. Once again, probably an I-modeish plasma. No WCM however.

Feb 21 2012 10:13:46:080AM1120221005Nathan HowardTargets for this Shot was:
--------------------------
Locked Mode Calibration shot

Notes: The shot looked very nice. Full length....but....no argon. We are repeating this discharge

Feb 21 2012 10:21:17:300AM1120221006Nathan HowardTargets for this Shot was:
--------------------------
Locked Mode Calibration shot

Notes: The shot looked very nice. Almost full length. Good shot. With Argon
Feb 21 2012 10:33:07:130AM1120221007Anne Whiteshot 6 was a locked mode shot, looked good, had Ar
shots 3 and 4 looked like it has a good region to try and process the
linear stability analysis


Shot 7
Plan: Repeat shot 4 but with changes to density and shape
--> raise target density to nl04=0.7
--> move strikepoint (RXU) out a few millimeters

Result:
disruption, (injection?) near t = 1.0 sec
Feb 21 2012 10:52:17:067AM1120221008Anne Whiteshot 8

plan: keep nl04 request the same, change RXU to move strikepoint out more
and request only 1 MW RF input power

result: shot ran.

next shot:

repeat.
Feb 21 2012 11:12:03:283AM1120221009Anne Whiteshot 9 result:

good steady 0.8 MA, 1 MW L-mode shot. nl04 = 0.7
Shots 8, 9 are not good steady I-modes for refl, polarimeter and PCI at same
density.

next shot:
plan is to raise nl04 to 0.75 to scan reflectometer channels in core
for fluctuation measurements. keep smae Ip=0.8 and RF 1 MW


Feb 21 2012 11:19:18:547AM1120221010Anne Whiteshot 10

plan is to raise nl04 to 0.75 to scan reflectometer channels in core
for fluctuation measurements. keep smae Ip=0.8 and RF 1 MW


result: shot ran, good fluctuation data, but we did not get higher nl04 as requested.

next shot:

repeat, but try to adjust nl04 controlto actually get the density up to nl04 0.75 or so
Feb 21 2012 11:37:07:193AM1120221011Anne Whiteshot 11

plan is to raise nl04 to 0.75 to scan reflectometer channels in core
for fluctuation measurements. keep smae Ip=0.8 and RF 1 MW

TS jitter is going to be corrected with fudge factor by Yunxing so we can get a better sense of refl location coverage in shot 10.

result:
shot ran, looks good. got higher nl04 later in time. but we have gap in refl coverage it seems. so we will scan down to lower nl04 for next shot and assess core coverage.
Feb 21 2012 11:50:56:817AM1120221012Anne Whiteshot 12

plan is to decrease nl04 to 0.60 to scan reflectometer channels in core
for fluctuation measurements. keep smae Ip=0.8 and RF 1 MW

note from Yunxing: look at YAG1 for shots 3-11 today, as it has better agreement with TCI line avg density. use the higher ne profile for refl. assessmenets in w_dens

result:
shot ran, got good nlo04 - 0.6 control. refl 88 GHz near 0.83 cm
for next shot, go down in nl04 to 0.55, keep Ip = 0.8 MA and RF at 1 MW
Feb 21 2012 12:10:40:963PM1120221013Anne Whiteshot 13

plan is to decrease nl04 to 0.55to scan reflectometer channels in core
for fluctuation measurements. keep same Ip=0.8 and RF 1 MW

result:

shot ran. good shot. This is last shot in low power density scan.
88 GHz refl chan has clean core fluctuation data.

next shot:

go back to high power case. Increase RF to 3.5 MW as on shot 3 from today.
keep nl04 request same as in shot 13 (nl04 = 0.55)
Feb 21 2012 12:24:43:217PM1120221014Anne Whiteshot 14

Increase RF request to high power (3.5 MW) as in shot 3
Plan is to keep nl04 to 0.55 to get reflectometer channels in core
for fluctuation measurements. keep same Ip=0.8.

result:
shot ran. looks great.

next shot:

repeat, slight nl04 reduction for refl. scan. try to match nl04 from shot 13
to complete refl. core fluct. data set.


Feb 21 2012 01:04:39:967PM1120221015Anne Whiteshot 15

this was a high power (3.5 MW), 0.8 MA, nl04 ~ 0.5
result:
shot ran, had a locked mode

next shot:

reduce RF power to 2.3 MW and repeat.


Feb 21 2012 01:04:51:643PM1120221016Anne Whiteshot 16

this was a middle power (2.3 MW), 0.8 MA, nl04 ~ 0.5

result:
shot ran, looks good.

next shot:

Repeat of shot 14, but now reduce current to 700 kA


Feb 21 2012 01:06:21:693PM1120221017Anne Whiteshot 17

repeat of shot 14 at lower current

this was a high power (3.5 MW), 0.7 MA, nl04 ~ 0.55 shot

result:
shot ran, got an H-mode early, but tail end of shot is ok.
Ar looked low. to be safe, repeat with more Ar

next shot:

Repeat of shot 17, but with more Ar


Feb 21 2012 01:18:09:810PM1120221018Anne Whiteshot 18

Repeat of shot 17, but with more Ar
High power, 3.5 MW, Ip= 0.7 MA, nl04 ~0.55

result:

shot ran, had H-mode again. but later in time the shot looks good for analysis.

next shot:

repeat shot 18, but at lower power, 1.1 MW




Feb 21 2012 01:28:53:010PM1120221019Anne Whiteshot 19

High power, 3.5 MW, Ip= 0.7 MA, nl04 ~0.55
repeat shot 18

result: shot ran, looks good, a high power shot.

next shot:
Low power (1.1 MW) repeat of 18


Feb 21 2012 01:50:29:180PM1120221020Anne Whiteshot 20

Low power, 1.0 MW, Ip= 0.7 MA, nl04 ~0.55
repeat shot 18

result: shot ran, looks good, a low power companion shot to high power shot 19.
At this point in time, we have two key pairs of shots:
1120221019, 1120221020 are a pair of high/low power shots at 0.7 MA, nl04 ~ 0.55
1120221014, 1120221012 are a pair of high/low power shots at 0.8 MA, nl04 ~ 0.50


next shot:

Big changes!!

Switch to phase two of run plan:

dial up 14, but now at higher current Ip = 1.0 MA, higher density, nl04 = 0.8
and with an RF power ramp from 2 MW to 3.5 MW starting at t = 0.5 sec to 1.5 sec.
Goal is to make a L-I transition in middle of shot.


Feb 21 2012 02:03:48:220PM1120221021Anne Whiteshot 21


dial up 14, but now at higher current Ip = 1.0 MA, higher density, nl04 = 0.8
and with an RF power ramp from 2 MW to 3.5 MW starting at t = 0.5 sec to 1.5 sec.
Goal is to make a L-I transition in middle of shot.

result:

shot ran.
it looks like we have an L-I transition at around 0.95 sec.
WCM on edge refl and increase in edge Te

next shot:
change to a power step at 1.0 sec, 2.6 MW to 3.0MW
Feb 21 2012 02:07:54:753PM1120221022Anne Whiteshot 22

result:

looks like something fell in early, 30 ms or so...

next shot:

plan to repeat attempt at clean L-I with a power step at 1.0 sec, 2.6MW to 3.0MW
Feb 21 2012 02:50:58:693PM1120221023Anne Whiteshot 23

result:

looks like I-mode transition near 1.0 sec, but change in profiles not so clear. this was a 1.0 MA shot.

next shot:

plan to repeat attept at clean L-I with a power step at 1.0 sec, 2.0MW to 3.0MW
Feb 21 2012 02:50:33:703PM1120221024Anne Whiteshot 24

result:

good shot, at 1 .1 MA, but looks like it did not have an I-mode transition near 1.0 sec

next shot:

plan to repeat attept at clean L-I with a power step at 1.0 sec, 2.5MW to 3.5MW at 1.1 MA
Feb 21 2012 03:01:44:407PM1120221025Anne Whiteshot 25

result:

good shot, at 1.1 MA, with good (blessed by Amanda)L-I-mode transition near 1.0 sec

next shot:

plan to repeat attept at clean L-I transiiton with a power ramp from 2.5MW to 3.5MW at 1.1 MA
Feb 21 2012 03:14:59:700PM1120221026Anne Whiteshot 26

result:

good shot, at 1.1 MA, a power ramp from 2.5MW to 3.5MW. nl04 = 0.8
but RF trips later in timeoccur near the L-I transition time...

next shot:

new RF ramp from 3.0-3.5 MW, otherwise a repeat.


Feb 21 2012 03:38:06:337PM1120221027Anne Whiteshot 27

result:

shot ran at 1.1 MA, a power ramp from 3.0MW to 3.5MW. nl04 = 0.8
but doesn't quite get into I-mode

next shot:

nl04 = 0.9, new RF ramp from 3.0- max power MW


Feb 21 2012 04:01:03:130PM1120221028Anne Whiteshot 28

result:

shot ran, almost 4 MW RF at end os ramp

next shot:

locked mode shot for hirex sr calibration


Feb 21 2012 04:02:18:020PM1120221029Anne Whiteshot 29

result:

shot ran, good locked mode shot for HIREX SR calibration

next shot:

gas setup for fast Ti measurements (MLR)


Feb 21 2012 04:14:20:250PM1120221030Matt ReinkeTrying to get I-modes with high time resolution Ti profiles. Repeating 021 but with flat 3 MW ICRF (should be I-mode ish).

Increase HIREXSR time resolution to 200 Hz frame rate (3 ms dead, 2 ms on)

Increase early Ar puff to 200 ms from 150 ms.

RESULT: Good RF trace, early injection but 0.95-1.45 should have fairly repeatable sawteeth. They have multiple crashes, though.

NEXT: Had H-like DAQ problems. Chi thinks it's fixed. Repeat, increasing Ar.
Feb 21 2012 04:27:10:543PM1120221031Matt ReinkeRepeating 030, hopefully fixing w/ full HIREXSR system. Slightly increased Ar and added NINJA (D2) at 1.3 seconds for edge CXRS (inner and outer).

RESULT: excellent shot! got both H-like and He-like. NINJA puff changes nl04 a bit. ICRF was at 3 MW, but J-ANT trace is lost in the ether.

NEXT: moving NINJA to 1.4 seconds, increase Ip to 1.1 MA and repeating
Feb 21 2012 04:38:12:947PM1120221032Matt ReinkeIncreasing Ip to 1.1 MA and repeating

RESULT: again lost the J-ANT trace, but got the power input. Very repeatable Te based on the Thomson aliasing!

NEXT: increase Ip to 1.2 MA and repeat
Feb 21 2012 04:59:35:403PM1120221033Matt Reinkerepeat discharge but at 1.2 MA.

RESULT: great shot, all power traces showing up. After the NINJA the nl04 kind of runs away into the rampdown. Disruption at 1.0 MA :(

NEXT: repeat at 0.9 MA
Feb 21 2012 05:10:00:823PM1120221034Matt Reinkerepeat shot but at 0.9 MA. Combination of 5 o'clock and post-disruption fizzle make my prospects grim...

RESULT: sweet! got the 0.9 MA shot. This should make a good scan of the sawtooth inversion radius with fast Ti data!

Chi informs me we lost H-like data on this shot.

NEXT: end of run

Physics Operator Comments
Feb 21 2012 08:47:38:000AM1120221001Syunichi ShiraiwaLoaded 1101014012.
Update control parameters in seg 3
Zerod seg 2
(Thank you, Steve.)

Enable B-side lower.
Ar (pg1) from 0.3s to 0.4s

First shot is gas test.
Loaded seg 1 from 1120207001


Feb 21 2012 09:24:30:440AM1120221002Syunichi ShiraiwaEnable B-side lower.
Ar (pg1) from 0.3s to 0.4s

Loaded seg 1 from 1120207002 (cryopump startup)

.... debuging E-port antenna (08:51)....
.... done (09:16) ....

ICRF from 0.5 to 1.5 s with a small ramp

Result:
disrutption at 0.7 due to injection?
Feb 21 2012 09:48:53:297AM1120221003Syunichi ShiraiwaSetting for this shot
moved RXU out by 0.5cm
turn off density integral gain. (from 2 to 0)
request higher density ramp-up

Result:
Disrupted at 1.1s
Upper div probes are receiving heat, may consider X point sweep.
Feb 21 2012 09:58:49:400AM1120221004Syunichi ShiraiwaSetting for this shot
Increase density request to 0.65

Results:
The same density as the previous shot.
Next shot will be locked mode calibration using 1120216029
Feb 21 2012 10:13:57:680AM1120221005Syunichi ShiraiwaSetting for this shot
Locked mode calibration.
Load 1120216029 Set 3 to Seg 2.
Turn on Seg 2.

Result:
PCS piezo-chopper setting for gas_1 and h-bot were not correct
Feb 21 2012 10:24:30:927AM1120221006Syunichi ShiraiwaLocked mode, certified by Matt.

Next:
Move back to #4 (= turn on seg. 3)
Move RXU outward by 3mm
Increase density request to 0.7e20
Feb 21 2012 10:42:42:743AM1120221007Syunichi ShiraiwaDisrupted at 1s

Next :
Moves RXU by 3mm outward.
Feb 21 2012 10:52:33:623AM1120221008Syunichi ShiraiwaThe same setting as shot 7 except for ICRF power (1MW for this shot) and RXU request.

Good shot. Flat density, RF power,
Feb 21 2012 11:07:34:657AM1120221009Syunichi ShiraiwaRepeat of #8

Next:
Increase the density to 0.75e20
Feb 21 2012 11:19:25:153AM1120221010Syunichi ShiraiwaGood shot, but density did not increase much

Next:
Turn on int gain after 0.5 (set to be 1)

Feb 21 2012 11:37:10:797AM1120221011Syunichi ShiraiwaDensity shows gradual increase from 0.7 to 0.75 during
the flat top.

Next:
decrease the density request to 0.6e20
also move int gain starts from 0.5 to 0.3s

Feb 21 2012 11:56:33:870AM1120221012Syunichi ShiraiwaGood shot at ne04=0.6e20

Next:
decrease the density to 0.5e20
Feb 21 2012 12:00:32:993PM1120221013Syunichi ShiraiwaGood shot at 0.55e20

Next:
The same as the previous shot as for PCS.
RF power will be increase to 3.5-4MW.
Feb 21 2012 12:17:42:307PM1120221014Syunichi ShiraiwaGood shot at RF=3.5MW.

Next:
adjust the density program to match it as shot 13.

Feb 21 2012 12:33:44:310PM1120221015Syunichi ShiraiwaDisrupted during the ramp-down

Next:
Will take the shot at P_RF=2.25MW
Feb 21 2012 12:50:11:607PM1120221016Syunichi ShiraiwaFull length plasma at ne04=0.52e20

Next: reload shot 14 and decrease the ip to 700kA.
Feb 21 2012 01:06:10:813PM1120221017Syunichi ShiraiwaFull length plasma.
Short period of H-mode?

Next:
Repeat shot 17 with another pg1 (Ar) pulse at 0.9 s (50ms)


Feb 21 2012 01:10:32:100PM1120221018Syunichi ShiraiwaFull length plasma
Feb 21 2012 01:28:13:237PM1120221019Syunichi ShiraiwaGood shot. The RF power was the same as shot 18.

Next: low power shot.
Feb 21 2012 01:37:27:180PM1120221020Syunichi ShiraiwaFull length plasma

Next:
Ip 1MA
ne 0.8e20
RF power 2->3.5MW power ramp.
Feb 21 2012 02:02:23:797PM1120221021Syunichi ShiraiwaFull length plasma, we got density and Ip as requested

Next:
the same as shot 21 but stairway shape of ICRF power.
Feb 21 2012 02:05:57:253PM1120221022Syunichi ShiraiwaVery early injection at 0.03 s

Next: repeat
Feb 21 2012 04:06:30:913PM1120221023Syunichi ShiraiwaGot I-mode

Next:
Increase Ip to 1.1MA
Feb 21 2012 04:06:57:583PM1120221025Syunichi ShiraiwaFull length plasma

Next: No change in PCS
Feb 21 2012 04:05:58:790PM1120221026Syunichi ShiraiwaFull length plasma

Next: No change in PCS. Modify ICRF power trace
Feb 21 2012 04:05:40:347PM1120221027Syunichi ShiraiwaFull length shot

Next:
Increase density to 0.9e20
Change RF trace
Feb 21 2012 04:05:05:633PM1120221028Syunichi ShiraiwaFull length plasma

End of cryopump for today.
Feb 21 2012 04:04:38:720PM1120221029Syunichi ShiraiwaLocked mode calibration
Load entire PCS setting from 1120216029

Next:
reload shot 21, but with no-cryopump start-up
increase Ar puff to 200ms
Feb 21 2012 04:16:00:257PM1120221030Syunichi ShiraiwaFull length plasma.

Next: increase Ar to 250ms.
ninja will be turn-on
Feb 21 2012 04:27:30:137PM1120221031Syunichi ShiraiwaFull length plasma.
Little bump during the start-up again

Next: increase Ip to 1.1MA
Feb 21 2012 04:41:47:460PM1120221032Syunichi ShiraiwaGood shot

Next: 1.2MA
Feb 21 2012 05:00:07:263PM1120221033Syunichi ShiraiwaDisrupted at 1.6 s, due to Ninja...?

Next:
Ip = 900kA
Will be the last shot.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:44:45:473AMTestOkGas Test
209:20:57:480AMPlasmaOk
309:38:21:203AMPlasmaOk
409:52:10:193AMPlasmaOk
510:04:47:633AMPlasmaOk
610:17:26:320AMPlasmaOk
710:30:08:490AMPlasmaOk
810:44:36:570AMPlasmaOk
910:58:34:153AMPlasmaOk
1011:11:52:973AMPlasmaOk
1111:25:24:637AMPlasmaOk
1211:41:08:637AMPlasmaOk
1311:55:54:347AMPlasmaOk
1412:09:15:843PMPlasmaOk
1512:22:12:133PMPlasmaOk
1612:40:40:500PMPlasmaOk
1712:54:41:740PMPlasmaOk
1801:07:34:937PMPlasmaOk
1901:20:11:967PMPlasmaOk
2001:32:58:200PMPlasmaOk
2101:48:41:473PMPlasmaOk
2202:01:32:883PMPlasmaOk
2302:14:43:663PMPlasmaOk
2402:30:44:737PMPlasmaOk
2502:49:24:153PMPlasmaOk
2603:06:52:293PMPlasmaOk
2703:22:58:163PMPlasmaOk
2803:38:09:380PMPlasmaOk
2903:52:00:833PMPlasmaOk
3004:04:47:733PMPlasmaOk
3104:17:24:177PMPlasmaOk
3204:30:10:443PMPlasmaOk
3304:51:34:493PMPlasmaOk
3405:04:13:060PMPlasmaOk

System Availability
Feb 21 2012 08:44:17:533AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane and LEDGE-AX diodes functioning properly. Midplane bolometers working and calibrated. LEDGE/DIV bolometers working, but toaster calibration not yet complete.Jan 23 2012 12:02PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. System has been tested and will be ready once bottle is installedJan 09 2012 06:32AM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 06 2012 03:48PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperational. He level meter not working on 500L dewar. Frank will take manual readings.Jan 11 2012 11:46AM (labombard)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 05 2011 02:41PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 01 2012 01:24PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes Dec 01 2011 11:46AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIno Jan 06 2012 04:36PM Jim IrbyFast two-color interferometerirby
G-Side Ratiomaticyes Dec 02 2011 12:24PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 05 2011 02:42PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jan 09 2012 06:32AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 06 2011 08:21AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesOperational and testedJan 06 2012 03:50PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Jan 23 2012 12:03PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane Lyman-a and LEDGE-LY working normally. New B-PORT Lyman (BPLY) still being debugged.Jan 23 2012 12:04PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 01 2011 11:51AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonno**vacuum system problem*** McPherson viewing the 10-14 nm region for molybdenum monitoring. It's days are numbered as LoWEUS has demonstrated superiority.Jan 31 2012 08:15AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 02 2011 12:27PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno1/3/2011: push-pull mechanism broken. MSE inoperativeJan 03 2012 11:47AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 02 2011 12:28PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesOperational. High voltage comes on during INIT and off at RECOOL.Dec 09 2011 09:48AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 06 2012 04:22PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jan 09 2012 06:33AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jan 09 2012 06:33AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jan 09 2012 06:33AM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jan 09 2012 06:33AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational, except for probe #1 (open circuit) and probe #16 (not installed).Dec 09 2011 09:50AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational, except for bottom-D probe (open circuit).Dec 09 2011 09:52AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF-divertor ok. J-divertor ok, except for JDIV_06 which is shorted out.Dec 09 2011 09:54AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational except for probes #4, 5 and 13 (open)Dec 09 2011 09:56AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120105xxx, all channels are connectedJan 05 2012 09:14AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesIon Sensitive Probe head installed. Testing in piggy-back mode.Dec 20 2011 12:33PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Dec 09 2011 09:57AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP is operational. K-port WASP is dead (all probes melted together).Dec 09 2011 09:58AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesFixed frequency operation available (100kHz) at moderate power (< 0.5kW). Otherwise in receiver mode.Jan 11 2012 11:50AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with two 50Hz lasers, precise density calibration still required.Feb 03 2012 04:04AM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesSystem taking data. Requires calibration.Feb 03 2012 04:05AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Jan 23 2012 12:13PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 working normally, ARRAY5 (new core view) working but spatial calibration issues not yet resolvedJan 23 2012 12:13PM (mlreinke)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke