Alcator C-Mod Run 1120223 Information

Back to runs

Miniproposals
Miniproposal:673
Date Filed:11/9/2011
Title:Study of L-H transition and H-mode at low plasma density with improved C-Mod diagnostics
First Author:Yunxing Ma
Session Leader:Yunxing Ma (shots 1-34)

Operators
Session leader(s):Yunxing Ma
Physics operator(s):Earl Marmar
Engineering operator(s):Andy Pfeiffer,Sam Pierson,Ed Fitzgerald

Engineering Operator Run Comment
MP 673, Study of L-H transition and H-mode at low plasma density with im

Session Leader Plans
Entered: Feb 22 2012 04:27:01:463PM
Author: Yunxing Ma
Run plan for MP673 (02/23/2012)
==================================================

Purpose:
The primary objective of this experiment is two-fold: (1) studying the plasma density dependence of divertor geometry effect on H-mode threshold power and plasma behaviors close to L-H transition in (2) characterizing the density and divertor geometry dependence of GAM-like low-frequency (~3KHz) plasma fluctuation preceding and near the onset of L-H transition.

*********************************************
*********************************************
Machine Operation Parameters:
Gas: D2
Bt/Ip: 5.4T/1.0MA
L-mode target nl04 (10^20m^-2): 0.35-0.45, 0.7-0.8, 1.1-1.2
ICRF: up to ~3.0MW
Cryopump: on


**********************************************
**********************************************
Diagnostics Requirement:
Profiles: TS (edge+core), ECE (GPC1, GPC2, FRC), Hirex (Ar), CXRS (providing DNB working), X-mode reflectometry, divertor probes, Ly edge
Fluctuations: O-mode reflectometry (in particular 50~88GHz), magnetic coils, PCI, GPI (providing J.Terry on site)


**********************************************
**********************************************

Shot Sequence (20~24 shots):

Part 1, nl04~0.35 (8~10 shots):
Load target shot from 1120209012: nl04~0.35, Bt=5.3T, Ip=1MA, vertical-plate divertor, Prf implemented at 0.6s and linearly ramped up to ~3.0MW before terminated at 1.4s.

After the target shot is successfully repeated, the run will proceed to develop H-mode at low density (nl04~0.4) with slot divertor geometry. Based on experience gained from previous experiments, this magnetic configuration can be realized by decreasing (2~3cm) RXL and/or ZXL while maintaining the shaping (elongation, triangularity, etc) nearly fixed. The phys op may reference the magnetic geometry of shot 1101221012 to get some direction. To ensure the maximum likelihood of H-mode access, the same RF wave form as of the target shot (1120209012) will be used (ramp-up to ~3.0MW). One major foreseen difficulty based on what we encountered in the past, is how to maintain the strike point in the slot through the discharge to before L-H transition, while the RF power is continuously raised and the flux swing tend to move the strike point up to the vertical plate. Considering the potential impedance, it might take a few (2~3) discharges to successfully establish this scenario.

After a low density L-H transition with slot divertor is successfully produced and repeated, the session leader will evaluate the threshold power. The next stage then is to iterate between vertical-plate and slot divertor for 4~6 shots to collect sufficient (statistically meaningful) plasma data from various C-Mod diagnostics. If necessary, the RF wave form may be programmed in staircase close to Pth for each divertor geometry to optimize the diagnostics performance. Approximately 3~5 shots are aimed in each divertor geometry by the end of this part (6~10 shots in total).

Part 3, nl04~1.1 (6~8 shots):
Increase target density to nl04~1.1 and repeat part 1.

Part 4, nl04~0.8 (~6 shots):
set target density to nl04~0.8 and repeat part 1.








Physics Operators Plans
Entered: Feb 22 2012 05:38:34:893PM
Author: Earl Marmar
PO Plan for Thursday, Feb 23, 2012

MP 673, Study of L-H transition and H-mode at low plasma density with improved C-Mod diagnostics

SL Y. Ma
PO E. Marmar
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1120209012

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid enabled (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes (3MW all antennas at 78 or 80 MHz)
LH(yes/no): no
Cryopump (yes/no): yes
DNB (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Feb 23 2012 06:22:32:830PM
Author: Yunxing Ma
Today's run went faily well despite many fizzles and disruptions in the first 2/3 of the expreriment. Totally 17 plasmas were produced, 14 of them have clear L-H transition in the Ip flattop. Most of the transitions were realized with the slot divertor, and cover a reasonably broad density range of 0.8~2.2n20. The run has reproduced the earlier observation of H-mode threshold power reduction in slot divertor operation at moderate- to high-density, while it seems at low density, the H-mode threshold power with slot divertor could be similar to the value with vertical-plate divertor operation. More analysis will be carried out.

Physics Operator Summaries

Session Leader Comments
Feb 23 2012 08:59:58:030AM1120223001Yunxing Mashot 1: load target shot 1120209012, and repeat it
Feb 23 2012 09:13:32:450AM1120223001Yunxing MaGood shot and clear L-H transition at 0.845sec.
Strike point on the vertical divertor at transition.
nebar at transition~1.0n20, slightly higher than the target shot, but still in the low-density regime
Feb 23 2012 09:28:14:360AM1120223002Yunxing Maclear L-h transition at 1.104sec, density at transition higher with nl04~0.6
the strike point is kind on the lowest tile of the vertical divertor at transition, close to the slot but not in.
Next shot, try recuding RXL by 0.5cm, reducing ZXL by 0.5cm.



Feb 23 2012 11:26:23:687AM1120223003Yunxing MaGood shot, H-mode transition at 1.255sec, nebar~1.0n20, strike point curl up to hit the bottom tile on vertical divertor plate before L-H while maintained reasaonably long in slot beforehand
Feb 23 2012 11:26:59:167AM1120223004Yunxing MaGood shot, H-mode transition at 1.317sec, nebar~1.0n20, strike point curl up to hit the bottom tile on vertical divertor plate before L-H while maintained reasaonably long in slot beforehand
Feb 23 2012 11:31:23:373AM1120223005Yunxing MaIncrease the initial RF power to 2MW, get a true slot H-mode at low density
at 0.643sec, nbar~0.9n20
Pth~1.6MW
Feb 23 2012 11:31:56:120AM1120223006Yunxing Mafizzle
Feb 23 2012 11:33:31:130AM1120223007Yunxing Madensity lower to 0.7n20
no H-mode, early disruption at 1.1sec
Feb 23 2012 11:38:20:940AM1120223008Yunxing Maplasma last through flattop, density lower at ~0.7n20
no H-mode
Feb 23 2012 11:39:31:370AM1120223009Yunxing Mafizzle
Feb 23 2012 11:39:43:143AM1120223010Yunxing Maanother fizzle
Feb 23 2012 11:39:57:803AM1120223011Yunxing Maearly disruption
Feb 23 2012 11:51:45:663AM1120223012Yunxing Maearly disruption at 0.58sec
Feb 23 2012 12:09:43:120PM1120223013Yunxing Mafizzle
Feb 23 2012 01:10:09:047PM1120223014Yunxing MaGood shots. Get H-mode in slot geometry.
transiton time at ~0.8sec, nebar~0.8, Prf~2MW

Feb 23 2012 01:10:17:570PM1120223015Yunxing Mafizzle

Feb 23 2012 01:10:26:757PM1120223016Yunxing Maearly disruption
Feb 23 2012 01:10:36:323PM1120223017Yunxing Maearly disruption
Feb 23 2012 01:19:39:180PM1120223018Yunxing Mafizzle
Feb 23 2012 01:39:49:017PM1120223019Yunxing Maearly disruption
Feb 23 2012 06:05:07:430PM1120223020Yunxing Mafizzzzzzzzzle
Feb 23 2012 01:59:12:307PM1120223021Yunxing MaGood shots, many H-modes

Feb 23 2012 02:25:58:920PM1120223022Yunxing Mafizzle
next shot: increase nl04 to 7e19

Feb 23 2012 03:41:42:960PM1120223023Yunxing Maearly disruption

Feb 23 2012 03:42:36:920PM1120223024Yunxing MaGood shot, L-H at 0.732, slot divertor, nebar~1.25n20
Feb 23 2012 03:42:47:990PM1120223025Yunxing Mafizzle
Feb 23 2012 03:43:17:050PM1120223026Yunxing Mafizzle
Feb 23 2012 03:46:10:577PM1120223027Yunxing Magood shot, L-H at 0.79sec, nebar~1.4n20,
Feb 23 2012 05:38:07:337PM1120223028Yunxing Magood shot, L-H transition at 0.85sec, nebar~1.9n20
Feb 23 2012 05:38:41:683PM1120223029Yunxing Magood shot, no L-H due to the RF power from D-ant was missing
Feb 23 2012 05:39:11:253PM1120223030Yunxing Mafizzle
Feb 23 2012 05:41:44:917PM1120223031Yunxing Madithering transition from 0.7 to 0.76 sec,
nebar~1.75 at 0.7sec
nebar~2.3 at 0.76 sec
Feb 23 2012 05:47:26:737PM1120223032Yunxing Madithering transition from 0.7 to 0.73 sec,
Feb 23 2012 05:48:28:477PM1120223033Yunxing Magood shot, L-H transition at 0.65 sec, nebar~1.3n20
Feb 23 2012 05:50:14:110PM1120223034Yunxing Magood shot, L-H transition at 0.607 sec, nebar~1.0n20

Physics Operator Comments
Feb 23 2012 09:16:19:497AM1120223001Earl Marmarload from 1120209012
import segment 1 from 1120222016 into segment 1

plasma, full length
startup looks ok
Feb 23 2012 09:28:21:870AM1120223002Earl Marmardecrease RXL in segment 2, attempting to match shape of 1101221012 (but at 1 MA instead of 0.9 MA).

plasma, full length
strike point is on the bottom vertical-plate tile for most of the flattop.
Feb 23 2012 09:40:38:907AM1120223003Earl Marmardecrease ZXL 5 mm, RXL 4 mm

plasma, disrupt in rampdown (0.66 MA)
Feb 23 2012 09:58:50:900AM1120223004Earl Marmartweak shape during rampdown

plasma, disrupted later in rampdown (0.35 MA)
Feb 23 2012 10:14:22:327AM1120223005Earl Marmarno dpcs changes

plasma
went into H-mode early, then disrupt at .85 s

G-H limiter is getting quite hot on the damaged tiles near the midplane
Feb 23 2012 10:19:05:900AM1120223006Earl Marmardecrease RXL further after 1 second; try to keep the strike point in the slot longer

tweak plasma current rise to try to get to 1 MA earlier

fizzle
Feb 23 2012 10:48:53:057AM1120223007Earl Marmarno additional dpcs changes

plasma, disrupt at 1 s
reports of A-port probe causing trouble
G-H limiter also getting warm
Feb 23 2012 11:06:39:133AM1120223008Earl MarmarBT to 5.4 T
reduce prefill puff to 27 ms (from 30 ms)
increase outer gap by 4 mm

plasma, disrupt in rampdown
Feb 23 2012 11:11:19:083AM1120223009Earl Marmarreduce RXL 5 mm during flattop
increase nl_04 target to 4e19 (from 3.5e19)

fizzle
Feb 23 2012 11:25:21:440AM1120223010Earl Marmarincrease prefill puff to 29 ms (from 27 ms)

fizzle
Feb 23 2012 11:55:40:767AM1120223011Earl MarmarEF4 10 A more negative for t<0 (now -1320 A)

plasma, short, ugly, disrupt during current rise (0.35 MA)
Feb 23 2012 12:01:57:687PM1120223012Earl Marmarno dpcs changes

plasma, disrupt early in flattop (1 MA, 0.59 s)

Feb 23 2012 12:11:19:500PM1120223013Earl Marmartweak ZXL programming through flattop

fizzle
Feb 23 2012 12:36:00:590PM1120223014Earl Marmarno additional dpcs changes

plasma, disrupt in rampdown
Feb 23 2012 12:42:04:993PM1120223015Earl Marmarreduce prefill puff by 1 ms (now 28 ms)
reduce segment 2 TF current to -149 kA (5.4 tesla instead of 5.5)

fizzle
Feb 23 2012 01:03:38:180PM1120223016Earl Marmarno dpcs changes

plasma, short, ugly
looks a lot like shot 11
Feb 23 2012 01:06:49:553PM1120223017Earl Marmarno dpcs changes

plasma, disrupt at .615 s
looks a lot like shot 12
Feb 23 2012 01:24:10:823PM1120223018Earl Marmarno dpcs changes

fizzle, looks a lot like 13
Feb 23 2012 01:39:46:970PM1120223019Earl Marmartweak rcur and clearin during rampdown

plasma, disrupt at 0.625 s

on these early full-current disruptions, sawteeth are getting very small (locked mode?)
Feb 23 2012 01:52:46:997PM1120223020Earl Marmarreduce prefill puff to 25 ms (from 28)
increase nl_04 target to 5e19 (from 4e19)

fizzle
Feb 23 2012 02:07:25:850PM1120223021Earl Marmarincrease prefill puff to 27 ms
nl_04 target to 6e19

plasma, disrupt at start of rampdown
Feb 23 2012 02:25:30:010PM1120223022Earl Marmardecrease prefill puff to 25 ms
EF4 current to -1330 A (from -1320)

fizzle
Feb 23 2012 02:58:54:770PM1120223023Earl Marmarincrease prefill puff to 27 ms
EF4 current to -1320 A (from -1330)
nl_04 target to 7e19

short, ugly
Feb 23 2012 02:59:20:273PM1120223024Earl Marmarno dpcs changes

plasma, disrupt at start of rampdown

Feb 23 2012 03:05:04:887PM1120223025Earl Marmarcryopump on standby
prefill puff to 12 ms
nl_04 target to 8e19
tweak RCUR, CLEARIN, RXL during rampdown

fizzle

Feb 23 2012 03:25:14:877PM1120223026Earl Marmarprefill puff to 11 ms (from 12)

fizzle
Feb 23 2012 03:33:00:470PM1120223027Earl Marmarreduce early PG3 puff (t<0)

plasma, full length
Feb 23 2012 03:53:20:950PM1120223028Earl Marmarnl_04 target to 1e20

plasma, rampdown disrupt at 0.5 MA
Feb 23 2012 04:07:05:877PM1120223029Earl Marmarnl_04 target to 1.1e20

plasma, disrupt at start of rampdown
Feb 23 2012 04:16:26:823PM1120223030Earl Marmarprefill puff to 10 ms (from 11)

fizzle
Feb 23 2012 04:33:37:740PM1120223031Earl Marmarimport segment 2 from 1120223028 into segment 2 (nl_04 target = 1.0e20)

plasma, disrupt at start of ramp-down
Feb 23 2012 04:33:19:363PM1120223032Earl Marmarno dpcs changes
Feb 23 2012 04:57:46:610PM1120223033Earl Marmarimport segment 2 from 1120223024 into segment 2 (nl_04 target = 7e19)

plasma, rampdown disrupt (0.5 MA)
Feb 23 2012 05:21:48:433PM1120223034Earl Marmarnl_04 target = 4e19

plasma, full length

Engineering Operator Comments
ShotTimeTypeStatusComment
109:02:36:450AMPlasmaOk
209:16:07:613AMPlasmaOk
309:29:08:410AMPlasmaOk
409:43:06:977AMPlasmaOk
509:58:40:157AMPlasmaOk
610:16:08:733AMPlasmaOk
710:30:38:187AMPlasmaOk
810:48:24:937AMPlasmaOk
911:06:27:027AMPlasmaOk
1011:19:31:940AMPlasmaOk
1111:32:20:983AMPlasmaOk
1211:46:37:417AMPlasmaOk
1312:04:50:733PMPlasmaOk
1412:20:22:553PMPlasmaOk
1512:36:05:250PMPlasmaOk
1612:49:10:583PMPlasmaOk
1701:02:03:967PMPlasmaOk
1801:17:20:917PMPlasmaOk
1901:30:37:473PMPlasmaOk
2001:43:30:780PMPlasmaOk
2101:56:17:793PMPlasmaOk
2202:21:14:510PMPlasmaOk
2302:34:00:783PMPlasmaOk
2402:47:53:623PMPlasmaOk
2503:01:14:860PMPlasmaOk
2603:13:58:337PMPlasmaOk
2703:26:55:270PMPlasmaOk
2803:43:19:353PMPlasmaOk
2903:56:51:380PMPlasmaOk
3004:11:18:513PMPlasmaOk
3104:24:16:137PMPlasmaOk
3204:37:09:713PMPlasmaOk
3304:50:38:703PMPlasmaOk
3405:03:21:790PMPlasmaOk

System Availability
Feb 23 2012 09:02:18:227AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 02 2008 11:03AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane and LEDGE-AX diodes functioning properly. Midplane bolometers working and calibrated. LEDGE/DIV bolometers working, but toaster calibration not yet complete.Jan 23 2012 12:02PM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle Removed. System has been tested and will be ready once bottle is installedJan 09 2012 06:32AM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 06 2012 03:48PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertoryesOperational. He level meter not working on 500L dewar. Frank will take manual readings.Jan 11 2012 11:46AM (labombard)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 01 2009 09:45AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 05 2011 02:41PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationnogas jet valve disabled on 2011/04/13Apr 13 2011 02:04PM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 06 2007 10:50AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 06 2007 10:51AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 01 2012 01:24PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes Dec 01 2011 11:46AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyesOperational as of 11/19/11Nov 22 2011 03:01PM (irby)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEnoPower off to RF and IF sections- Power on to DAApr 11 2011 02:54PM (phillips)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIno Jan 06 2012 04:36PM Jim IrbyFast two-color interferometerirby
G-Side Ratiomaticyes Dec 02 2011 12:24PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoPower supply unplugged and redtagged, HV cables removedApr 14 2011 08:03AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesUsing new preamps.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesDewar cold. Nov 21 2011 09:55AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 01 2009 09:45AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 05 2011 02:42PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Jan 09 2012 06:32AM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 06 2011 08:21AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennanosecuredApr 14 2011 08:55AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredApr 14 2011 08:56AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesOperational and testedJan 06 2012 03:50PM (g)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH HV Breaker Opened and Tagged, TPS Upgrade UnderwayNov 10 2011 03:51PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Jan 23 2012 12:03PM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane Lyman-a and LEDGE-LY working normally. New B-PORT Lyman (BPLY) still being debugged.Jan 23 2012 12:04PM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 01 2011 11:51AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonno**vacuum system problem*** McPherson viewing the 10-14 nm region for molybdenum monitoring. It's days are numbered as LoWEUS has demonstrated superiority.Jan 31 2012 08:15AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesFront end at 4.5e-8 T. Reduced speed for initial operation.Nov 30 2011 07:51AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 02 2011 12:27PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPnoSystem is in edge lab. Version 2 drivers ready to test. Needs a student to help work on it.Jul 14 2009 09:20PM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEno1/3/2011: push-pull mechanism broken. MSE inoperativeJan 03 2012 11:47AM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesHigh voltage is on. We're ready for plasma.Nov 21 2011 12:58PM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 02 2011 12:28PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Nov 30 2011 12:45PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesOperational. High voltage comes on during INIT and off at RECOOL.Dec 09 2011 09:48AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 01 2009 09:46AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 06 2012 04:22PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Jan 09 2012 06:33AM (dekow)Gary Dekowfeeds all the other suppliescochran,dekow,dterry,irby
Power - PEIyes Jan 09 2012 06:33AM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Jan 09 2012 06:33AM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Jan 09 2012 06:33AM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational, except for probe #1 (open circuit) and probe #16 (not installed).Dec 09 2011 09:50AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational, except for bottom-D probe (open circuit).Dec 09 2011 09:52AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesF-divertor ok. J-divertor ok, except for JDIV_06 which is shorted out.Dec 09 2011 09:54AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational except for probes #4, 5 and 13 (open)Dec 09 2011 09:56AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120105xxx, all channels are connectedJan 05 2012 09:14AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesIon Sensitive Probe head installed. Testing in piggy-back mode.Dec 20 2011 12:33PM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.Dec 09 2011 09:57AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPyesA-port WASP is operational. K-port WASP is dead (all probes melted together).Dec 09 2011 09:58AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesFixed frequency operation available (100kHz) at moderate power (< 0.5kW). Otherwise in receiver mode.Jan 11 2012 11:50AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port waveguides operational, h-port waveguides are not.Nov 29 2011 12:04PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesNew Type II sparker replaced Type I on 11/17/2011Nov 23 2011 08:53AM (irby)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issuesApr 14 2011 12:06PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI Operational. Density feedback operational.Nov 10 2011 11:47AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with one 50Hz laser, precise density calibration still required.Feb 22 2012 08:37AM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesSystem taking data. Requires calibration.Feb 03 2012 04:05AM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Jan 23 2012 12:13PM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->4 working normally, ARRAY5 (new core view) working but spatial calibration issues not yet resolvedJan 23 2012 12:13PM (mlreinke)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke