Alcator C-Mod Run 1120530 Information

Back to runs

Miniproposals
Miniproposal:355
Date Filed:11/12/2003
Title:ICRF Testing & Conditioning
First Author:Steve Wukitch
Session Leader:Yijun Lin (shots 1-30)

Operators
Session leader(s):Yijun Lin
Physics operator(s):Syunichi Shiraiwa
Engineering operator(s):Bill Cochran,Bill Parkin,Bill Byford

Engineering Operator Run Comment
PO-plan: MP355, ICRF conditioning

Session Leader Plans
Entered: May 29 2012 02:33:52:647PM
Author: Yijun Lin
SL-plan: MP355, ICRF conditioning

Purpose:
1. check out the recently repaired and re-configured transmission line of the J antenna.

2. Condition the J antenna to high power.

3. Running all ICRF antennas to condition the machine and to reduce the H/D level.

Plasma:
Reload shot 1120523032. It was an upper-single-null plasma. 800 kA, 5.4 T.

Start J-antenna at low power (400 kW total, 400 ms) and check out whether there is reduction in the standing wave voltage. Run D/E at 2 MW total separately.

DNB may work piggyback to check out beam problems.


Physics Operators Plans
Entered: May 29 2012 04:31:34:100PM
Author: Syunichi Shiraiwa
-----------------
Engineering Setup
-----------------
PO-plan: MP355, ICRF conditioning

Run begins at 09:00 and ends at 17:00

Power systems as on: 1120523032

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED
fill H-bottom with 4 psi He4 Hybrid DISABLED (PG5)

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus/LoWEUS
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): yes (for piggy back test)

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries

Physics Operator Summaries
Entered: May 31 2012 07:01:35:650AM
Author: Syunichi Shiraiwa
The machine ran well.

The main gas valve was replaced before this run. A new
piezo initially does not open well and tends to
become normal as it is is used. This results in too
much pre-puff in shot 3 and ended up in early disruption
in this shot. This disruption blow off 6 fuses of OH1 PS.
Also IGOR canceled the shot sequence twice, today.

Other than these two events, the machine operation
went well smoothly. Among total 30 attempt and we got
23 full pulse length plasma w/o disruptions.
J-port seems to couple about 2MW of ICRF power.

Score card with the total ICRF power is as follows.
The first half is the power from J



Session Leader Comments
May 30 2012 09:21:48:667AM1120530001Yijun Linplasma.
J match is off, possibly due to the modification of the decoupling loop.
lower field to 5.2 T so J is on axis.
May 30 2012 10:37:10:473AM1120530002Yijun Linplasma
J match is still off.
H/(D+H) ~ 10%.
May 30 2012 09:49:47:860AM1120530003Yijun Linplasma. ended earlier.
May 30 2012 10:50:18:487AM1120530004Yijun LinOH test after replacing fuses.
May 30 2012 11:03:25:080AM1120530005Yijun LinPlasma attempt, but no plasma.
May 30 2012 11:20:23:747AM1120530006Yijun LinPlasma.
j still mismatched.
May 30 2012 11:39:59:833AM1120530008Yijun Linfizzle
May 30 2012 11:58:08:037AM1120530009Yijun Linplasma.
j match better.
next: repeat.
May 30 2012 12:07:27:570PM1120530010Yijun Linplasma.
J ran.
May 30 2012 12:26:48:817PM1120530011Yijun Linplasma.
J ran at 1 MW power.
next: repeat.
May 30 2012 12:49:44:847PM1120530012Yijun Linplasma.

the standing wave VMAX in the 9" line is about 30% lower than the setup 2 weeks ago (which ran @ 2.2 MW in H-mode and caused arcing on the J3 stub tuner). The current setup would make the system run above 3 MW.

J ran at 1 MW power.
next: raise J power.
May 30 2012 12:54:25:410PM1120530013Yijun LinNo power shot. Alternator problem.
May 30 2012 01:19:30:193PM1120530014Yijun LinPlasma.
J had a lot of fault at 2 MW.
May 30 2012 01:34:20:243PM1120530015Yijun LinPlasma.
J ran well.
May 30 2012 01:49:56:117PM1120530016Yijun LinPlasma.
J ran. problem in retries.
May 30 2012 02:00:11:300PM1120530017Yijun LinPlasma.
J ran. OK.
May 30 2012 02:19:12:360PM1120530018Yijun LinPlasma.
J ran. OK.
May 30 2012 02:30:46:743PM1120530019Yijun LinPlasma.
J ran. OK.
May 30 2012 03:34:00:280PM1120530023Yijun LinPlasma.
J ran. OK.
May 30 2012 03:48:25:343PM1120530024Yijun LinPlasma.
all antennas ran. no fault.
next: raise power. overlap all antennas.
May 30 2012 03:57:52:560PM1120530025Yijun Linno plasma.
May 30 2012 04:14:40:790PM1120530026Yijun Linplasma.
J faulted after raising power.
May 30 2012 05:03:24:723PM1120530030Yijun LinClassic 5 pm fizzle.
End of run.

Physics Operator Comments
May 30 2012 09:23:07:383AM1120530001Syunichi ShiraiwaLoaded 1120523032. Seg 4 was active in this shot,
which was reloaded to Seg 2 for today.
Setting checked by my pcs-compare...Ready to go?

Got a full length plasma.
J tripping

Next:
Ninja will be enabled.
enabled B-side lowe (Ar). Puff from 0.3 to 0.375
changed field to 5.2T

May 30 2012 09:31:37:250AM1120530002Syunichi ShiraiwaPlasma was full length.
J not coupled.

Next:
enalbe H botton. 0.6 to 0.65ms at 100V
May 30 2012 10:07:03:507AM1120530003Syunichi ShiraiwaPlasma current did not ramp-up with the usual dIdt,
and died at 0.35s.
Massive gas puff during the ramp-up.
Replacing 6 fuses on OH

Next:
Reduced the pre-puff
May 30 2012 10:49:48:380AM1120530004Syunichi ShiraiwaTest shot for OH1

Checking OH1 fuses, after pulse.
May 30 2012 11:09:54:283AM1120530005Syunichi ShiraiwaShot did not start due to IGOR
May 30 2012 11:19:01:640AM1120530006Syunichi ShiraiwaGot a full length plasma.
J is still not happy

Next:
Reduce PG5 to 25ms
May 30 2012 11:30:13:120AM1120530007Syunichi ShiraiwaFull length plasma, though dI/dt is slightly lower than
before..

Next:
Reduce prepuff after 0s, again
May 30 2012 11:45:19:920AM1120530008Syunichi ShiraiwaFizzle

Next: Retry
May 30 2012 11:59:01:860AM1120530009Syunichi ShiraiwaGot a plasma.
J is not happy....
May 30 2012 12:13:02:153PM1120530010Syunichi ShiraiwaRamp-up looks ok.
J coupled this shot.
May 30 2012 12:34:36:130PM1120530011Syunichi ShiraiwaA plasma. >1MW from J.

Next:
reduce prepuff a little again
reduce density to 8e19 (from 9e19)

May 30 2012 12:41:20:043PM1120530012Syunichi ShiraiwaGot 8e19. D_alpha signal is smaller than before
May 30 2012 12:58:01:160PM1120530013Syunichi ShiraiwaNo power

Next: retry
May 30 2012 01:18:12:707PM1120530014Syunichi ShiraiwaA plasma.

Next:
reduce pg5 to 10ms

May 30 2012 01:34:11:753PM1120530015Syunichi Shiraiwaa plasma. J was better in this shot
May 30 2012 01:41:59:683PM1120530016Syunichi ShiraiwaA plasma

Next: increase pg5 to 20ms
May 30 2012 02:04:21:713PM1120530017Syunichi ShiraiwaPlasma is ok. A few trip in RF

Next:
Move PG5 to 0.5s
May 30 2012 02:14:58:810PM1120530018Syunichi ShiraiwaA plasma. Coupling was good
May 30 2012 02:31:45:227PM1120530019Syunichi ShiraiwaAnother plasma with good RF coupling.

Next:
set pg5 to 40ms
May 30 2012 02:38:03:937PM1120530019Steve ScottIf you compare shots 2 and 19, they have the same RF power, but shot 19 has lower Zeff and considerably higher
stored energy
May 30 2012 02:45:09:840PM1120530020Syunichi Shiraiwaanother plasma
May 30 2012 03:01:08:667PM1120530021Syunichi Shiraiwa

Next:
increase pg5 pulse to 60ms
May 30 2012 03:28:27:707PM1120530022Syunichi ShiraiwaFull length plasma. ICRF has a good coupling.
May 30 2012 03:33:23:630PM1120530023Syunichi ShiraiwaGot a plasma

Next:
PG5 disabled
May 30 2012 03:46:46:747PM1120530024Syunichi ShiraiwaA plasma. ICRF couples well.
May 30 2012 04:00:00:713PM1120530025Syunichi ShiraiwaNo Power (IGOR error)
May 30 2012 04:20:09:987PM1120530026Syunichi Shiraiwa20th full length plasma today... still the toal is 40s...;D

J is not happy. Camera shows arcing in the 2nd strap (from
the left) at 0.737s
May 30 2012 04:27:04:250PM1120530027Syunichi ShiraiwaFull length plasma.
May 30 2012 04:42:48:853PM1120530028Syunichi ShiraiwaA full length plasma

Next: Adjust XLR, XLZ
May 30 2012 04:55:10:927PM1120530029Syunichi ShiraiwaAnother plasma.
May 30 2012 05:03:16:297PM1120530030Syunichi ShiraiwaFizzle

Engineering Operator Comments
ShotTimeTypeStatusComment
109:05:25:117AMPlasmaOk
209:25:52:863AMPlasmaOk
309:46:05:633AMPlasmaBadOH1 Type 1 Flt
410:44:57:053AMTestOkOH1 PLC 10kA Test
510:57:59:730AMPlasmaBadIgor failure
611:10:01:540AMPlasmaOk
711:23:11:500AMPlasmaOk
811:37:23:560AMPlasmaOk
911:50:49:963AMPlasmaOk
1012:04:16:327PMPlasmaOk
1112:17:40:823PMPlasmaOk
1212:34:32:597PMPlasmaOk
1312:49:51:447PMPlasmaBadAlternator fault - No Power shot
1401:08:21:437PMPlasmaOk
1501:23:31:110PMPlasmaOk
1601:36:48:513PMPlasmaOk
1701:53:15:757PMPlasmaOk
1802:06:28:913PMPlasmaOk
1902:24:09:810PMPlasmaOk
2002:37:21:850PMPlasmaOk
2102:52:27:520PMPlasmaOk
2203:05:41:637PMPlasmaOk
2303:27:53:487PMPlasmaOk
2403:41:08:520PMPlasmaOk
2503:54:51:810PMPlasmaBadACK Failue
2604:04:49:123PMPlasmaOk
2704:18:01:707PMPlasmaOk
2804:31:29:057PMPlasmaOk
2904:45:54:053PMPlasmaOk
3004:59:06:293PMPlasmaOk

System Availability
May 30 2012 09:05:06:950AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle has been disconnected from gas lines and plugged. It is being stored in the diborane cabinet.Feb 29 2012 07:47:39:617AM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 6 2012 03:48:47:060PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoOff line. Helium dewar to be installed Monday 5/14/12May 10 2012 08:45:54:900AM (labombard)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012May 1 2012 05:03:39:313PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennayesconditioningMay 1 2012 10:31:59:277AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennayesconditioningMay 1 2012 10:31:48:860AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredFeb 29 2012 11:12:32:567AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH is now safe for manned entry into machine. Positioner locked and tagged off. Switches locked in dummy load position.Mar 2 2012 02:34:28:943PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane Lyman-a. New B-PORT Lyman (BPLY) still being debugged.Apr 20 2012 10:44:00:540AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonno McPherson viewing the 10-14 nm region for molybdenum monitoring. It's days are numbered as LoWEUS has demonstrated superiority.Apr 20 2012 10:44:10:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.May 1 2012 08:31:33:743AM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120508, the 60, 75, 88s, 112, 140 and variable are connected and turned on.May 8 2012 10:33:21:567AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issues.Feb 27 2012 01:51:48:783PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:32:050PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:51:363PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke

May 31 2012 01:49:38:673AM
Change voltage range on ACQ_216_3:INPUT_05 and 06 to 2.5 on pcdaqeng1 192.168.0.19 web control.

Otherwise, same parameters as Shot 1120530903.
May 31 2012 01:49:53:960AM
Repeat of Shot 904

(Change voltage range on ACQ_216_3:INPUT_05 and 06 to 2.5 on pcdaqeng1 192.168.0.19 web control.

Otherwise, same parameters as Shot 1120530903.)
May 31 2012 01:50:26:000AM
Change voltage range on ACQ_216_3:INPUT_05 to 1.6; leave INPUT_06 at 2.5.

Otherwise, same parameters as Shot 1120530903.
May 31 2012 01:51:18:270AM
Now, change ACQ_216_3:INPUT_03 range to 1.6 - this corresponds to antenna current probe.

Leave voltage range on ACQ_216_3:INPUT_05 at 1.6; leave INPUT_06 at 2.5.

Otherwise, same parameters as Shot 1120530903.

(Note that on Shots 904 on, all three digitizers are stored so that magnetics signals are available.)
May 31 2012 01:56:14:120AM
Now, change ACQ_216_3:INPUT_04 range to 2.5, and leave other voltage ranges the same.

BUT I think this method of adjusting digitizer ranges does not work, since during the shot, the readout on the web display resets to a range of 10 on all channels.

(Note that on Shots 904 on, all three digitizers are stored so that magnetics signals are available.)