Alcator C-Mod Run 1120531 Information

Back to runs

Miniproposals
Miniproposal:681
Date Filed:12/2/2011
Title:Evaluate field-aligned antenna performance
First Author:Mike Garrett
Session Leader:Steve Wukitch (shots 1-34)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Yijun Lin
Engineering operator(s):Andy Pfeiffer,Sam Pierson,Thomas Toland

Engineering Operator Run Comment
PO-plan: MP355, ICRF conditioning PO Yijun Lin

Session Leader Plans
Entered: May 31 2012 10:39:27:623AM
Author: Steve Wukitch
---------
Run Plan
---------
1. Start with USN discharges - 1120530029.

2. troubleshoot the phase oscillation

3. maximize FA-J antenna power and voltage

4. time and hardware permitting compare D&E to FA-J

Physics Operators Plans
Entered: May 30 2012 01:22:37:183PM
Author: Yijun Lin
-----------------
Engineering Setup (same as run 1120530)
-----------------
PO-plan: MP355, ICRF conditioning

Run begins at 09:00 and ends at 17:00

Power systems as on: 1120530001

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED
fill H-bottom with 4 psi He4 Hybrid DISABLED (PG5)

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus/LoWEUS
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): yes (for piggy back test)

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: May 31 2012 05:13:06:140PM
Author: Steve Wukitch
Run Summary

We conditioned the FA-J antenna up to 2.5 MW for 0.4 s in USN
discharges. We had relatively short pulses at or above 3 MW. The
maximum voltage was 40 kV. We did some comparison discharges in both
USN and LSN. In LSN discharges, the FA-J antenna struggled likely
because we were operating at higher voltages (~40-42 kV) for the same
power. We also struggled with a phase feedback circuit. The circuit
was taking up to 20 ms to lock which is about 10 times longer than
normal.

Physics Operator Summaries
Entered: May 31 2012 05:08:46:603PM
Author: Yijun Lin
Relatively smooth run day.

Total plasma attempt: 34
full length plasma: 26

3 no power shot3 caused by ACK failure.
5 fizzles: Two of them following a disruption, and the other 3 just happened.

Session Leader Comments
May 31 2012 10:21:58:647AM1120531001Steve Wukitch001 no plasma

May 31 2012 10:19:22:870AM1120531002Steve Wukitchrequest: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.5 MHz
E : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.0 MHz
J3: t = [0.70, 1.20] sec, 0.20 to 1.20 MW, 78.0 MHz
J4: t = [0.70, 1.20] sec, 0.20 to 1.20 MW, 78.0 MHz
Result: plasma into rampdown
phase oscillation is still present


May 31 2012 10:16:35:210AM1120531003Steve Wukitchrequest: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.5 MHz
E : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.0 MHz
J3: t = [0.70, 1.20] sec, 0.20 to 1.20 MW, 78.0 MHz
J4: t = [0.70, 1.20] sec, 0.20 to 1.20 MW, 78.0 MHz
Result: plasma into rampdown
phase oscillation is gone
plasma heating response is also reduced

May 31 2012 10:13:32:770AM1120531004Steve Wukitchrequest: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.5 MHz
E : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.0 MHz
J3: t = [0.70, 1.20] sec, 0.20 to 1.20 MW, 78.0 MHz
J4: t = [0.70, 1.20] sec, 0.20 to 1.20 MW, 78.0 MHz
Result: plasma into rampdown
phase oscillation is back
return to 125 deg phase

May 31 2012 10:15:34:000AM1120531005Steve Wukitchrequest: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.5 MHz
E : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.0 MHz
J3: t = [0.70, 1.20] sec, 0.20 to 1.40 MW, 78.0 MHz
J4: t = [0.70, 1.20] sec, 0.20 to 1.40 MW, 78.0 MHz
Result: plasma into rampdown
phase oscillation is gone
plasma heating response is also reduced

May 31 2012 10:33:38:423AM1120531006Steve Wukitchrequest: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.5 MHz
E : t = [1.20, 1.50] sec, 0.20 to 1.20 MW, 80.0 MHz
J3: t = [0.70, 1.20] sec, 0.20 to 1.40 MW, 78.0 MHz
J4: t = [0.70, 1.20] sec, 0.20 to 1.40 MW, 78.0 MHz

Result: plasma into rampdown, J was a bit better at high power

May 31 2012 10:44:39:607AM1120531007Steve Wukitch007 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.50] sec, ramp to 1.20 MW
E : [1.20, 1.50] sec, ramp to 1.20 MW
J3: [0.70, 1.20] sec, ramp to 1.40 MW
J4: [0.70, 1.20] sec, ramp to 1.40 MW

Result: plasma into rampdown
next: repeat with 180 phase
May 31 2012 10:57:06:107AM1120531008Steve Wukitch008 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.50] sec, ramp to 1.20 MW
E : [1.20, 1.50] sec, ramp to 1.20 MW
J3: [0.70, 1.20] sec, ramp to 1.60 MW
J4: [0.70, 1.20] sec, ramp to 1.60 MW

Result: plasma into rampdown
next: repeat
May 31 2012 12:14:16:843PM1120531009Steve Wukitch009 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.50] sec, ramp to 1.20 MW
E : [1.20, 1.50] sec, ramp to 1.20 MW
J3: [0.70, 1.20] sec, ramp to 1.60 MW
J4: [0.70, 1.20] sec, ramp to 1.60 MW

Result: plasma into rampdown
next: repeat

May 31 2012 12:12:23:710PM1120531010Steve Wukitch010 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.50] sec, ramp to 1.20 MW
E : [1.20, 1.50] sec, ramp to 1.20 MW
J3: [0.70, 1.20] sec, ramp to 1.60 MW
J4: [0.70, 1.20] sec, ramp to 1.60 MW

Result: plasma into rampdown, brief periods at 3 MW
next: repeat
0
May 31 2012 12:11:59:177PM1120531011Steve Wukitch011 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.50] sec, ramp to 1.20 MW
E : [1.20, 1.50] sec, ramp to 1.20 MW
J3: [0.70, 1.20] sec, ramp to 1.60 MW
J4: [0.70, 1.20] sec, ramp to 1.60 MW

Result: plasma into rampdown, longer period at 3 MW
next: repeat

May 31 2012 12:11:40:443PM1120531012Steve Wukitch012 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.50] sec, ramp to 1.20 MW
E : [1.20, 1.50] sec, ramp to 1.20 MW
J3: [0.70, 1.20] sec, ramp to 1.60 MW
J4: [0.70, 1.20] sec, ramp to 1.60 MW

Result: plasma into rampdown, longer periods at 3 MW
next: repeat with phase controller in wideband rather than narrow
impurity injector is enabled
May 31 2012 12:32:02:747PM1120531013Steve Wukitch013 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.50] sec, ramp to 1.20 MW
E : [1.20, 1.50] sec, ramp to 1.20 MW
J3: [0.70, 1.20] sec, ramp to 1.60 MW
J4: [0.70, 1.20] sec, ramp to 1.60 MW

Result: plasma into rampdown
next: repeat

May 31 2012 12:58:00:200PM1120531015Steve Wukitch015 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.50] sec, 1.20 MW
E : [1.20, 1.50] sec, 1.20 MW
J3: [0.70, 1.15] sec, 1.20 MW
J4: [0.70, 1.15] sec, 1.20 MW

Result: plasma into rampdown
couple faults on J
next: repeat - increase J3 rampup rate
compare D/E and FA-J at 2.5 MW

May 31 2012 01:17:49:740PM1120531016Steve Wukitchfizzle
May 31 2012 01:19:02:440PM1120531017Steve Wukitch017 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.50] sec, 1.20 MW
E : [1.20, 1.50] sec, 1.20 MW
J3: [0.70, 1.15] sec, 1.20 MW
J4: [0.70, 1.15] sec, 1.20 MW

Result: plasma into rampdown
next: switch order
compare D/E and FA-J at 2.5 MW

May 31 2012 01:51:31:360PM1120531018Steve Wukitch018 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [0.70, 1.1] sec, 1.20 MW
E : [0.70, 1.1] sec, 1.20 MW
J3: [1.20, 1.5] sec, 1.20 MW
J4: [1.20, 1.5] sec, 1.20 MW

Result: plasma into rampdown - J had multiple faults
next: repeat
compare D/E and FA-J at 2.5 MW

May 31 2012 01:42:04:943PM1120531019Steve Wukitchno power
May 31 2012 02:12:54:663PM1120531020Steve Wukitch020 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [0.70, 1.1] sec, 1.20 MW
E : [0.70, 1.1] sec, 1.20 MW
J3: [1.20, 1.5] sec, 1.20 MW
J4: [1.20, 1.5] sec, 1.20 MW

Result: plasma into rampdown - good comparison
next: repeat - monopole phasing
compare D/E and FA-J at 2.5 MW

May 31 2012 02:13:09:187PM1120531021Steve Wukitch021 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [0.70, 1.1] sec, 1.20 MW
E : [0.70, 1.1] sec, 1.20 MW
J3: [1.20, 1.5] sec, 1.20 MW
J4: [1.20, 1.5] sec, 1.20 MW

Result: plasma disrupted in monopole - good comparison
next: switch order
compare D/E and FA-J at 2.5 MW

May 31 2012 02:23:45:323PM1120531022Steve Wukitchfizzle
May 31 2012 02:37:28:463PM1120531023Steve Wukitchfizzle
May 31 2012 02:52:01:743PM1120531024Steve Wukitch024 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.5] sec, 1.20 MW
E : [1.20, 1.5] sec, 1.20 MW
J3: [0.70, 1.1] sec, 1.20 MW
J4: [0.70, 1.1] sec, 1.20 MW

Result: plasma - crappy RF
next: repeat
compare D/E and FA-J at 2.5 MW
May 31 2012 03:12:49:867PM1120531025Steve Wukitch025 request: Bt = 5.3 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, USN
D : [1.20, 1.5] sec, 1.20 MW
E : [1.20, 1.5] sec, 1.20 MW
J3: [0.70, 1.1] sec, 1.20 MW
J4: [0.70, 1.1] sec, 1.20 MW

Result: plasma - good comparison
next: go to LSN
compare D/E and FA-J at 2.5 MW

May 31 2012 03:22:02:070PM1120531026Steve Wukitch026 request: Bt = 5.2 T, Ip = 0.8 MA, nl04 = 0.7e20 /m^2, LSN
D : [1.20, 1.5] sec, 1.20 MW
E : [1.20, 1.5] sec, 1.20 MW
J3: [0.70, 1.1] sec, 1.20 MW
J4: [0.70, 1.1] sec, 1.20 MW

Result: plasma - dithering during D/E portion - not the best comparison
next: repeat
compare D/E and FA-J at 2.5 MW

May 31 2012 03:56:22:037PM1120531028Steve Wukitchfizzle
May 31 2012 03:56:33:440PM1120531029Steve Wukitchno power
May 31 2012 04:15:16:383PM1120531030Steve Wukitch030 request: Bt = 5.2 T, Ip = 0.8 MA, nl04 = 0.5e20 /m^2, LSN
D : [1.20, 1.5] sec, 1.20 MW
E : [1.20, 1.5] sec, 1.20 MW
J3: [0.70, 1.1] sec, 1.20 MW
J4: [0.70, 1.1] sec, 1.20 MW

Result: plasma - FA-J still not great but maybe a start
next: repeat with antenna order reversed

May 31 2012 04:30:11:033PM1120531031Steve Wukitch031 request: Bt = 5.2 T, Ip = 0.8 MA, nl04 = 0.5e20 /m^2, LSN
D : [0.70, 1.1] sec, 1.20 MW
E : [0.70, 1.1] sec, 1.20 MW
J3: [1.20, 1.5] sec, 1.20 MW
J4: [1.20, 1.5] sec, 1.20 MW

Result: plasma - RF not looking good
next: repeat

May 31 2012 04:44:23:790PM1120531032Steve Wukitch032 request: Bt = 5.2 T, Ip = 0.8 MA, nl04 = 0.5e20 /m^2, LSN
D : [0.70, 1.1] sec, 1.20 MW
E : [0.70, 1.1] sec, 1.20 MW
J3: [1.20, 1.5] sec, 1.20 MW
J4: [1.20, 1.5] sec, 1.20 MW

Result: plasma - FA-J not so bad
next: repeat with antenna order reversed

May 31 2012 05:12:01:817PM1120531033Steve Wukitchfizzle
May 31 2012 05:12:25:113PM1120531034Steve Wukitch034 request: Bt = 5.2 T, Ip = 0.8 MA, nl04 = 0.5e20 /m^2, LSN
D : [1.20, 1.5] sec, 1.20 MW
E : [1.20, 1.5] sec, 1.20 MW
J3: [0.70, 1.1] sec, 1.20 MW
J4: [0.70, 1.1] sec, 1.20 MW

Result: plasma - FA-J not so bad
next: EoR

Physics Operator Comments
May 31 2012 09:02:59:963AM1120531001Yijun Linshot 1: reloaded shot 1120530029. The latest full plasma shot.
noticed the PG4 puff was 32 ms...far too long in my experience..and gas pressure at 0.08 mtorr at t=0.

reduce it to 25 ms.

Load at 31-May-2012 08:48:05.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

result: ACK failure. no plasma. no power.

next: no PCS change.
May 31 2012 09:31:22:593AM1120531002Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup OK.

next: enable Argon.
No PCS change.
May 31 2012 09:48:48:123AM1120531003Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup OK.

next: increase Argon
shorten PG4 to 22 ms.
May 31 2012 10:00:53:550AM1120531004Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup OK.

next: lengthen PG4 to 25 ms.
May 31 2012 10:15:55:807AM1120531005Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup OK. a little bouncy.

next: lengthen PG4 to 28 ms. slightly increase PG3 before t=0.
May 31 2012 10:30:45:590AM1120531006Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup better. less bouncy.

next: lengthen PG4 to 31 ms. also enable H-bottom for 40 ms He puff (Rowan)
May 31 2012 10:44:22:497AM1120531007Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup OK.

next:slightly increase PG3 puff before t=0.
May 31 2012 10:59:58:693AM1120531008Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next:no PCS change.
May 31 2012 11:13:16:993AM1120531009Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next:no PCS change.
May 31 2012 11:17:38:357AM1120531009Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next:PG5 He puff moved to 0.40-0.44 sec. no other change.
May 31 2012 11:36:14:953AM1120531010Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next: no PCS change.
May 31 2012 11:53:11:323AM1120531011Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next: no PCS change.
May 31 2012 12:05:04:430PM1120531012Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next: no PCS change.
May 31 2012 12:27:12:427PM1120531013Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next: no PCS change.
May 31 2012 12:53:09:037PM1120531015Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next: no PCS change.
May 31 2012 01:03:30:613PM1120531016Yijun Linfizzle. 1 pm fizzle. No particular reason.

next: no pcs change.
May 31 2012 01:16:42:033PM1120531017Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next: no PCS change.
May 31 2012 01:34:55:107PM1120531018Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next: no PCS change.
May 31 2012 01:42:09:743PM1120531019Yijun Linno power shot. ACK failure. similar to shot 1.
May 31 2012 02:00:49:617PM1120531020Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma full length.

startup good.

next: no PCS change. (J antenna try dipole and monopole in the same pulse)
May 31 2012 02:12:09:313PM1120531021Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma, disruption. Must related to the J antenna running at monopole.


next: no PCS change. it may recover from the disruption by itself.
May 31 2012 02:23:47:797PM1120531022Yijun Linpost-disruption fizzle.

Next: no pcs change.
May 31 2012 02:41:34:363PM1120531023Yijun Lin2nd fizzle in a row post the disruption caused by J monopole operation.

next: just do something...shorten PG3 puff to 25 ms.
May 31 2012 02:51:41:780PM1120531024Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma, full length (after two fizzles)

next: no PCS change.
May 31 2012 03:10:30:583PM1120531025Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, Upper-null

result: plasma, full length

next: lower single null. load segment 2 from 1120522031, adjust PG5 (He) and PG2 (Ar) puffs, also lower current to 800 kA.
May 31 2012 03:18:32:663PM1120531026Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 8e19 m^-2, lower-null

result: plasma, disrupted at 1.73 sec (ramp-down)

next: Lower density to 6e19 m^-2.
May 31 2012 03:46:40:287PM1120531028Yijun Linfizzle.
Maybe it was a wrong thing to reduce PG4. Reverse the decision.

Next: lengthen PG4 by 3 ms.
May 31 2012 03:56:04:183PM1120531029Yijun LinACK failure again. No power shot. Third one today.
May 31 2012 04:12:41:610PM1120531030Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 5e19 m^-2, lower-null

result: plasma, full length. good startup.

next: no PCS change.
May 31 2012 04:27:31:140PM1120531031Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 5e19 m^-2, lower-null

result: plasma, full length. good startup.

next: no PCS change.
May 31 2012 04:42:59:317PM1120531032Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 5e19 m^-2, lower-null

result: plasma, full length. good startup.

next: no PCS change.
May 31 2012 04:57:48:347PM1120531033Yijun Linfizzle. (almost 5 pm).

try one more. no PCS change.
May 31 2012 05:08:58:257PM1120531034Yijun Linplasma request: 5.2 T, 800 kA, nl04 = 5e19 m^-2, lower-null

result: plasma, full length. good startup.

end of run.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:58:44:333AMPlasmaBadAck fail
209:20:19:643AMPlasmaOk
309:37:14:867AMPlasmaOk
409:50:57:483AMPlasmaOk
510:04:43:703AMPlasmaOk
610:19:10:763AMPlasmaOk
710:36:57:880AMPlasmaOk
810:51:58:640AMPlasmaOk
911:06:27:453AMPlasmaOk
1011:22:07:963AMPlasmaOk
1111:46:44:033AMPlasmaOk
1212:00:26:367PMPlasmaOk
1312:14:04:320PMPlasmaOk
1412:29:21:700PMPlasmaOk
1512:43:09:357PMPlasmaOk
1612:57:29:787PMPlasmaOk
1701:10:47:943PMPlasmaOk
1801:24:19:810PMPlasmaOk
1901:37:42:947PMPlasmaOk
2001:51:53:177PMPlasmaOk
2102:05:11:150PMPlasmaOk
2202:18:33:707PMPlasmaOk
2302:31:49:663PMPlasmaOk
2402:45:03:790PMPlasmaOk
2502:58:25:710PMPlasmaOk
2603:11:44:163PMPlasmaOk
2703:25:21:913PMPlasmaOk
2803:39:09:657PMPlasmaOk
2903:52:42:750PMPlasmaBadAck Failure
3004:06:37:727PMPlasmaOk
3104:20:15:623PMPlasmaOk
3204:35:26:530PMPlasmaOk
3304:52:43:963PMPlasmaOk
3405:06:01:680PMPlasmaOk

System Availability
May 31 2012 08:58:26:077AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle has been disconnected from gas lines and plugged. It is being stored in the diborane cabinet.Feb 29 2012 07:47:39:617AM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 6 2012 03:48:47:060PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoOff line. Helium dewar to be installed Monday 5/14/12May 10 2012 08:45:54:900AM (labombard)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012May 1 2012 05:03:39:313PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-AntennayesconditioningMay 1 2012 10:31:59:277AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-AntennayesconditioningMay 1 2012 10:31:48:860AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-AntennanosecuredFeb 29 2012 11:12:32:567AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH is now safe for manned entry into machine. Positioner locked and tagged off. Switches locked in dummy load position.Mar 2 2012 02:34:28:943PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane Lyman-a. New B-PORT Lyman (BPLY) still being debugged.Apr 20 2012 10:44:00:540AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonno McPherson viewing the 10-14 nm region for molybdenum monitoring. It's days are numbered as LoWEUS has demonstrated superiority.Apr 20 2012 10:44:10:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.May 1 2012 08:31:33:743AM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120508, the 60, 75, 88s, 112, 140 and variable are connected and turned on.May 8 2012 10:33:21:567AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issues.Feb 27 2012 01:51:48:783PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:32:050PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:51:363PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke

May 31 2012 09:20:15:753AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle has been disconnected from gas lines and plugged. It is being stored in the diborane cabinet.Feb 29 2012 07:47:39:617AM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 6 2012 03:48:47:060PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoOff line. Helium dewar to be installed Monday 5/14/12May 10 2012 08:45:54:900AM (labombard)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012May 1 2012 05:03:39:313PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH is now safe for manned entry into machine. Positioner locked and tagged off. Switches locked in dummy load position.Mar 2 2012 02:34:28:943PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane Lyman-a. New B-PORT Lyman (BPLY) still being debugged.Apr 20 2012 10:44:00:540AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonno McPherson viewing the 10-14 nm region for molybdenum monitoring. It's days are numbered as LoWEUS has demonstrated superiority.Apr 20 2012 10:44:10:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.May 1 2012 08:31:33:743AM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120508, the 60, 75, 88s, 112, 140 and variable are connected and turned on.May 8 2012 10:33:21:567AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issues.Feb 27 2012 01:51:48:783PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:32:050PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:51:363PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke