Alcator C-Mod Run 1120604 Information

Back to runs

Miniproposals
Miniproposal:675
Date Filed:11/11/2011
Title:Initial disruption mitigation experiments with two gas jets
First Author:Geoff Olynyk
Session Leader:Geoff Olynyk (shots 1-12)

Operators
Session leader(s):Geoff Olynyk
Physics operator(s):
Engineering operator(s):Thomas Toland

Engineering Operator Run Comment
Gas Mitigation Tests

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments
Jun 4 2012 10:30:12:420AM1120604001Geoff OlynykThe gas jets were not enabled properly so didn't fire on this shot.
Also, we forgot to disable the fizzle detector and so we got a
fizzle-detector NOT PERMISSIVE signal on our interlock box.
Of course, no plasma = thought it was a fizzle.
Jun 4 2012 02:14:28:527PM1120604001Geoff Olynyk
Run 1120604 shot #001:
Test of existing setup of gas jets.

Plenum pressure 55 bar; gas mixture 15% Ar in 85% He.

Pulse start times:
""B-jet"" 1.0000 s
""F-jet"" 0.9989 s

Pulse lengths (duration):
""B-jet"" 1.28 ms
""F-jet"" 3.00 ms

OLD jet on B-port
NEW jet on F-port

OLD jet (B-port) driven by SHUTTER power supply
NEW jet (F-port) driven by PROPELLANT power supply


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer ""NEW""
2. Power supply current ""PROPELLANT""
3. Interlock pulse out ""#F""
4. Interlock pulse in ""#F""
5. Pressure transducer ""OLD""
6. Power supply current ""SHUTTER""
7. Interlock pulse out ""#B""
8. Interlock pulse in ""#B""

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive

Jun 4 2012 10:38:07:383AM1120604002Geoff OlynykInterlock worked successfully. B-port power supply appears to have not given a long enough pulse
to the valve and thus B-port valve didn't open. F-port valve opened successfully.
Jun 4 2012 02:14:36:170PM1120604002Geoff Olynyk
Run 1120604 shot #002:
Repeat shot 1. Test of existing setup of gas jets.

Plenum pressure 55 bar; gas mixture 15% Ar in 85% He.

Pulse start times:
""B-jet"" 1.0000 s
""F-jet"" 0.9989 s

Pulse lengths (duration):
""B-jet"" 1.28 ms
""F-jet"" 3.00 ms

OLD jet on B-port
NEW jet on F-port

OLD jet (B-port) driven by SHUTTER power supply
NEW jet (F-port) driven by PROPELLANT power supply


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer ""NEW""
2. Power supply current ""PROPELLANT""
3. Interlock pulse out ""#F""
4. Interlock pulse in ""#F""
5. Pressure transducer ""OLD""
6. Power supply current ""SHUTTER""
7. Interlock pulse out ""#B""
8. Interlock pulse in ""#B""

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive

Jun 4 2012 10:51:37:270AM1120604003Geoff OlynykRun 1120604 shot #003

Description:
Increase B-jet pulse duration to 2.00 ms.

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times:
B-jet 1.0000 s
F-jet 0.9989 s

Pulse lengths (duration):
B-jet 2.00 ms
F-jet 3.00 ms

OLD jet on B-port
NEW jet on F-port

OLD jet (B-port) driven by SHUTTER power supply
NEW jet (F-port) driven by PROPELLANT power supply


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer 'NEW'
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F'
4. Interlock pulse in '#F'
5. Pressure transducer 'OLD'
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B'
8. Interlock pulse in '#F'

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive (fizzle detector)
Jun 4 2012 11:01:57:777AM1120604003Geoff OlynykB-jet again didn't fire. Power supply is getting pulse in properly from interlock box, but current is not coming out.

One difference from before (run 1120202) is that the pulse in to the power supply is now 4.4 V (instead of 5.0 V). The interlock box seems to make the voltage droop a bit (passive elements in interlock box?)
Jun 4 2012 11:16:42:250AM1120604004Geoff OlynykB-port gas jet did not fire. Same problem as before - TTL input to SHUTTER power supply looks good, but output is just a little peak, less than 2 V and lasting about 0.65 ms.
Jun 4 2012 02:14:48:620PM1120604004Geoff OlynykRun 1120604 shot #004

Description:
B-jet pulse duration back to 1.28 ms. Restarted fast valve power supply (both modules: SHUTTER and PROPELLANT) and reseated B-jet high-current cable at both ends. Last attempt to get SHUTTER power supply working, otherwise we'll continue our tests with just the PROPELLANT power supply.

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times:
B-jet 1.0000 s
F-jet 0.9989 s

Pulse lengths (duration):
B-jet 1.28 ms
F-jet 3.00 ms


Power supply and valve configuration:

OLD jet on B-port
NEW jet on F-port

OLD jet (B-port) driven by SHUTTER power supply
NEW jet (F-port) driven by PROPELLANT power supply


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer 'NEW'
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F'
4. Interlock pulse in '#F'
5. Pressure transducer 'OLD'
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B'
8. Interlock pulse in '#B'

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive
Jun 4 2012 11:38:59:060AM1120604005Geoff OlynykSo it's definitely the SHUTTER power supply that is faulty. The B-jet was driven by the PROPELLANT power supply for this shot and it opened. F-jet was driven by the SHUTTER power supply and did not open.

Next: swap physical valve hardware.
Jun 4 2012 02:14:57:203PM1120604005Geoff OlynykRun 1120604 shot #005

Description:
Switch drivers, see what happens.

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times (note these are the settings in the RSview control system; they do not necessarily correspond to which valve is actually receiving current, because we're swapping things; see below for more details):
B-jet 1.0000 s (to SHUTTER power supply)
F-jet 0.9989 s (to PROPELLANT power supply)

Pulse lengths (duration) (RSview names):
B-jet 1.28 ms (connected to SHUTTER power supply)
F-jet 3.00 ms (connected to PROPELLANT) power supply)


Power supply and valve configuration:

OLD jet on B-port
NEW jet on F-port

OLD jet (B-port) driven by PROPELLANT power supply (reverse of normal!!)
NEW jet (F-port) driven by SHUTTER power supply (reverse of normal!!)


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer 'NEW'
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F'
4. Interlock pulse in '#F'
5. Pressure transducer 'OLD'
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B'
8. Interlock pulse in '#B'

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive
Jun 4 2012 12:44:07:060PM1120604006Geoff OlynykTorus pressure went to 377 mtorr on this shot.

Scopes are all messed up... every single one of the 32 inputs on the TRAQ_4 (all four T2812 8-channel cards) goes from 0 to 5 V for 1.28 ms beginning at t = 1.000 s. So we do not know which gas jet(s) fired or for how long.

Granetz is power-cycling the CAMAC crate (12:42 pm).
Jun 4 2012 02:15:05:347PM1120604006Geoff OlynykRun 1120604 shot #006

Description:
We have disconnected the interlock box so that the SHUTTER power supply is now driven directly by the 5 V trigger pulse (not the 4.4 V output from the interlock box).

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times (note these are the settings in the RSview control system; they do not necessarily correspond to which valve is actually receiving current, because we're swapping things; see below for more details):
B-jet 1.0000 s (to SHUTTER power supply)
F-jet 0.9989 s (to PROPELLANT power supply)

Pulse lengths (duration) (RSview names):
B-jet 1.28 ms (connected to SHUTTER power supply)
F-jet 3.00 ms (connected to PROPELLANT) power supply)


Power supply and valve configuration:

OLD jet on B-port
NEW jet on F-port

OLD jet (B-port) driven by PROPELLANT power supply (reverse of normal!!)
NEW jet (F-port) driven by SHUTTER power supply (reverse of normal!!)


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer 'NEW'
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F'
4. Interlock pulse in '#F'
5. Pressure transducer 'OLD'
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B'
8. Interlock pulse in '#B'

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive
Jun 4 2012 12:57:15:553PM1120604007Geoff OlynykSignals went to the interlock box, but nothing came out. Gas jets did not fire (torus pressure did not rise).
Jun 4 2012 02:15:16:813PM1120604007Geoff OlynykRun 1120604 shot #007

Description:
We have disconnected the interlock box so that the SHUTTER power supply is now driven directly by the 5 V trigger pulse (not the 4.4 V output from the interlock box). (Repeat of shot #6 - hopefully no digitizer problems this time)

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times (note these are the settings in the RSview control system; they do not necessarily correspond to which valve is actually receiving current, because we're swapping things; see below for more details):
B-jet 1.0000 s (to SHUTTER power supply)
F-jet 0.9989 s (to PROPELLANT power supply)

Pulse lengths (duration) (RSview names):
B-jet 1.28 ms (connected to SHUTTER power supply)
F-jet 3.00 ms (connected to PROPELLANT) power supply)


Power supply and valve configuration:

OLD jet on B-port
NEW jet on F-port

OLD jet (B-port) driven by PROPELLANT power supply (reverse of normal!!)
NEW jet (F-port) driven by SHUTTER power supply (reverse of normal!!)


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer 'NEW'
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F'
4. Interlock pulse in '#F'
5. Pressure transducer 'OLD'
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B'
8. Interlock pulse in '#B'

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive
Jun 4 2012 02:12:40:587PM1120604008Geoff OlynykWas basically identical to shot 5. Tom Toland et al. are now changing the gas valve hardware...
Jun 4 2012 02:15:24:317PM1120604008Geoff OlynykRun 1120604 shot #008

Description:
Repeat of shots 6 and 7

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times (note these are the settings in the RSview control system; they do not necessarily correspond to which valve is actually receiving current, because we're swapping things; see below for more details):
B-jet 1.0000 s (to SHUTTER power supply)
F-jet 0.9989 s (to PROPELLANT power supply)

Pulse lengths (duration) (RSview names):
B-jet 1.28 ms (connected to SHUTTER power supply)
F-jet 3.00 ms (connected to PROPELLANT) power supply)


Power supply and valve configuration:

OLD jet on B-port
NEW jet on F-port

OLD jet (B-port) driven by PROPELLANT power supply (reverse of normal!!)
NEW jet (F-port) driven by SHUTTER power supply (reverse of normal!!)


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer 'NEW'
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F'
4. Interlock pulse in '#F'
5. Pressure transducer 'OLD'
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B'
8. Interlock pulse in '#B'

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive
Jun 4 2012 02:15:34:493PM1120604009Geoff OlynykRun 1120604 shot #009

Description:
We have moved the NEW valve over to B-port. The OLD valve is sitting on the table. There is no fast valve installed at F-port.

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times (note these are the settings in the RSview control system; they do not necessarily correspond to which valve is actually receiving current, because we're swapping things; see below for more details):
B-jet 1.0000 s (to SHUTTER power supply)
F-jet 0.9989 s (to PROPELLANT power supply)

Pulse lengths (duration) (RSview names):
B-jet 1.28 ms (connected to SHUTTER power supply)
F-jet 3.00 ms (connected to PROPELLANT) power supply)


Power supply and valve configuration:

OLD valve not installed
NEW valve on B-port

NEW valve (B-port) driven by PROPELLANT power supply
OLD valve is not installed. SHUTTER power supply is not driving anything (but appears to be broken anyway).


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer at F-port, disconnected
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F' - goes to PROPELLANT power supply
4. Interlock pulse in '#F' - goes to PROPELLANT power supply
5. Pressure transducer 'NEW' (at B-port)
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B' - goes to SHUTTER power supply
8. Interlock pulse in '#B' - goes to SHUTTER power supply

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive
Jun 4 2012 02:36:19:073PM1120604010Geoff OlynykRun 1120604 shot #010

Description:
Swap outputs of power supplies back to what they were originally. For this shot, SHUTTER power supply drives NEW valve at B-port. PROPELLANT power supply would drive valve at F-port, except that there is no valve at F-port currently.

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times (note these are the settings in the RSview control system; they do not necessarily correspond to which valve is actually receiving current, because we're swapping things; see below for more details):
B-jet 0.9989 s (to SHUTTER power supply)
F-jet 0.9989 s (to PROPELLANT power supply - not driving any valve)

Pulse lengths (duration) (RSview names):
B-jet 3.00 ms (connected to SHUTTER power supply)
F-jet 3.00 ms (connected to PROPELLANT power supply - not driving any valve)


Power supply and valve configuration:

OLD valve not installed
NEW valve on B-port

NEW valve (B-port) driven by SHUTTER power supply
OLD valve is not installed. PROPELLANT power supply is not driving anything.


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer at F-port (currently disconnected)
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F' - goes to PROPELLANT power supply
4. Interlock pulse in '#F' - goes to PROPELLANT power supply
5. Pressure transducer at B-port (currently 'NEW' valve/transducer)
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B' - goes to SHUTTER power supply
8. Interlock pulse in '#B' - goes to SHUTTER power supply

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive
Jun 4 2012 02:43:31:243PM1120604011Geoff OlynykRun 1120604 shot #011

Description:
Same as shot 10 except we try to bypass the interlock box again. Last time we tried this (shot 06) the digitizer went crazy... hoping that was a coincidence and it doesn't have to do with us trying to bypass the interlock box.

For this shot, SHUTTER power supply drives NEW valve at B-port. PROPELLANT power supply would drive valve at F-port, except that there is no valve at F-port currently.

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times (note these are the settings in the RSview control system; they do not necessarily correspond to which valve is actually receiving current, because we're swapping things; see below for more details):
B-jet 0.9989 s (to SHUTTER power supply)
F-jet 0.9989 s (to PROPELLANT power supply - not driving any valve)

Pulse lengths (duration) (RSview names):
B-jet 3.00 ms (connected to SHUTTER power supply)
F-jet 3.00 ms (connected to PROPELLANT power supply - not driving any valve)


Power supply and valve configuration:

OLD valve not installed
NEW valve on B-port

NEW valve (B-port) driven by SHUTTER power supply
OLD valve is not installed. PROPELLANT power supply is not driving anything.


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer at F-port (currently disconnected)
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F' - goes to PROPELLANT power supply
4. Interlock pulse in '#F' - goes to PROPELLANT power supply
5. Pressure transducer at B-port (currently 'NEW' valve/transducer)
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B' - goes to SHUTTER power supply
8. Interlock pulse in '#B' - goes to SHUTTER power supply

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive
Jun 4 2012 02:58:55:353PM1120604011Geoff OlynykNEW jet at B-port still didn't fire using SHUTTER power supply, even with interlock box bypassed. So the SHUTTER power supply really does appear to be broken in some way.
Jun 4 2012 03:03:46:183PM1120604012Geoff OlynykRun 1120604 shot #012

Description:
Same as shots 10-11, but bypassing the interlock box in a different way.

For this shot, SHUTTER power supply drives NEW valve at B-port. PROPELLANT power supply would drive valve at F-port, except that there is no valve at F-port currently.

Plenum pressure 55 bar; gas mixture 15% Ar / 85% He.

Pulse start times (note these are the settings in the RSview control system; they do not necessarily correspond to which valve is actually receiving current, because we're swapping things; see below for more details):
B-jet 0.9989 s (to SHUTTER power supply)
F-jet 0.9989 s (to PROPELLANT power supply - not driving any valve)

Pulse lengths (duration) (RSview names):
B-jet 3.00 ms (connected to SHUTTER power supply)
F-jet 3.00 ms (connected to PROPELLANT power supply - not driving any valve)


Power supply and valve configuration:

OLD valve not installed
NEW valve on B-port

NEW valve (B-port) driven by SHUTTER power supply
OLD valve is not installed. PROPELLANT power supply is not driving anything.


Digitization setup:

XTOMO TRAQ_4 T2812 #04:
1. Pressure transducer at F-port (currently disconnected)
2. Power supply current 'PROPELLANT'
3. Interlock pulse out '#F' - goes to PROPELLANT power supply
4. Interlock pulse in '#F' - goes to PROPELLANT power supply
5. Pressure transducer at B-port (currently 'NEW' valve/transducer)
6. Power supply current 'SHUTTER'
7. Interlock pulse out '#B' - goes to SHUTTER power supply
8. Interlock pulse in '#B' - goes to SHUTTER power supply

XTOMO TRAQ_4 T2812 #03:
1-7. Not used
8. TORVAC permissive
Jun 4 2012 03:11:46:110PM1120604012Geoff OlynykStill didn't work. That's all folks.

Conclusions and lessons learned:

1. The SHUTTER power supply (which normally drives the valve at B-port) is borked. Have to get this fixed ASAP.

2. Using the PROPELLANT power supply to drive each of the two valves individually (the NEW valve on F-port on shot 4; and the OLD valve on B-port on shot 5) shows that it is not the power supplies that are causing the difference, but rather hardware differences in the valve/pressure transducer assembly.

3. Moving the NEW valve from F-port to B-port (see shot 9), driven by the PROPELLANT power supply, causes the NEW valve to act exactly like it did when it was at F-port. So it is not obstructions in the pipe that are causing the difference.

4. We have to figure out what information is usable from the run back in February (1120202) given the hardware differences between the two gas injectors.

Physics Operator Comments
Jun 4 2012 09:51:08:950AMRobert Granetz
Setting up to do gas jet tests.  Plenum fill pressure is 55 bar of a mixture of 15% Ar / 85% He

Engineering Operator Comments
ShotTimeTypeStatusComment
110:22:55:823AMTestBadNo Gas
210:32:01:773AMTestOk
310:53:52:210AMTestOk
411:11:23:607AMTestOk
511:29:42:570AMTestOk
612:24:26:137PMTestOk
712:49:24:940PMTestOk
812:57:35:210PMTestOk
902:20:17:900PMTestOk
1002:38:43:677PMTestOk
1102:55:14:650PMTestOk
1203:03:05:017PMTestOk

System Availability
Jun 4 2012 10:22:32:950AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
BoronizationnoBottle has been disconnected from gas lines and plugged. It is being stored in the diborane cabinet.Feb 29 2012 07:47:39:617AM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 6 2012 03:48:47:060PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper DivertornoOff line. Helium dewar to be installed Monday 5/14/12May 10 2012 08:45:54:900AM (labombard)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012May 1 2012 05:03:39:313PM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH is now safe for manned entry into machine. Positioner locked and tagged off. Switches locked in dummy load position.Mar 2 2012 02:34:28:943PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane Lyman-a. New B-PORT Lyman (BPLY) still being debugged.Apr 20 2012 10:44:00:540AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonno McPherson viewing the 10-14 nm region for molybdenum monitoring. It's days are numbered as LoWEUS has demonstrated superiority.Apr 20 2012 10:44:10:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.May 1 2012 08:31:33:743AM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesAs of 1120508, the 60, 75, 88s, 112, 140 and variable are connected and turned on.May 8 2012 10:33:21:567AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issues.Feb 27 2012 01:51:48:783PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:32:050PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:51:363PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke