Alcator C-Mod Run 1120627 Information

Back to runs

Miniproposals
Miniproposal:667
Date Filed: 9/6/2011
Title:Commissioning of new SOL probes
First Author:Dan Brunner
Session Leader:Dan Brunner (shots 1-22)

Operators
Session leader(s):Dan Brunner
Physics operator(s):Robert Granetz
Engineering operator(s):Andy Pfeiffer,Thomas Toland,Gary Dekow

Engineering Operator Run Comment
MP667 - Commissioning of SOL probes Session leader: D. Brunner Physics o

Session Leader Plans
Entered: Jun 26 2012 03:24:06:137PM
Author: Dan Brunner
MP667 Commissioning of SOL Probes

The purpose of this run is to get ion temperature profiles in the SOL with the new ASP Retarding Field Analyzer (RFA). These will be compared with a future run with the new Ion Sensitive Probe (ISP)

We'll begin with 1120217011 from the previous run with the ISP. Take a shot to ensure proper targeting. Then start pushing the probe in. Cell access may be required between shots to adjust the electronics. Once the RFA is operating properly, we'll begin a density scan; notching up by ~0.2*10^20 m-2 per shot. Given extra time, may revisit lower densities at the end of the day.

Tweaks may be made for CXRS. If puffing is needing, it can come after the last probe scan (~1.25 s).

HiRex & Co. have requested to inject calcium into ramp down, and they may.

Fill NINJA plenum with 10 psi He DISABLED

Physics Operators Plans
Entered: Jun 26 2012 04:38:02:887PM
Author: Robert Granetz

Engineering setup for Wednesday 2012/06/27

MP667 - Commissioning of SOL probes

Session leader: D. Brunner
Physics operator: R. Granetz

Overnight: normal ECDC in D2 and 60 C bake.

Run will start at 09:00 and end at 15:00

** NOTE THE EARLY ENDING TIME DUE TO THE PSFC BARBECUE **

Power systems as on: 1120217011 (0.8 MA, 5.4 T, 0.45e20 m-2, LSN)

A-coil configuration: +Dtop -Dbot -Jtop +Jbot; Hybrid enabled (standard
configuration)

Gas Setup:
   fill B-Top            with  6 psi D2  Hybrid enabled  (PG4)
   fill B-side lower     with  1 psi Ar  Hybrid DISABLED (PG1)
  leave B-side upper     as is           Hybrid DISABLED (PG2)   
   fill B-main (C-side)  with 40 psi D2  Hybrid enabled  (PG3)
   fill H-bottom         with 15 psi D2  Hybrid DISABLED (PG5)
  leave B-div            as is           Hybrid DISABLED (PG6)
  leave H-div            as is           Hybrid DISABLED (PG7)
  leave NINJA            as is                  DISABLED

Enable the following gate valves and shutters, assuming no vacuum problems:
  ECE, VUV, Z-bolo, HIREX-Sr, B-spectrometer GV, Xeus, LoWEUS
 
Torvac setup: keep gate valves open during pulse

Required diagnostics: RFA probe, edge CXRS, DNB

------------------------------------------------------------------------------
Boronization: no
Overnight ECDC: yes, D2
Impurity injector: not necessary, but CaF2 is okay in rampdown
ICRF: no
LH: no
DNB: yes
Cryopump: no
------------------------------------------------------------------------------

Run plan: Start from previous ISP run (1120217011 seg 2).  Density scan
          will be done.


Entered: Jun 26 2012 04:38:35:660PM
Author: Robert Granetz
DPCS setup: seg 1 from seg 1 of 1120626028 (decent non-cryopump startup from yesterday afternoon)
            seg 2 from seg 2 of 1120217011 (0.8 MA, 5.4 T, 0.45e20 m-2, LSN), as request by session leader

Session Leader Summaries
Entered: Jun 29 2012 08:55:08:063AM
Author: Dan Brunner
The run started off well. The RFA was tuned and all grids were working. None of the arcing problems seen on previous runs were seen today (sheets of mica in the corners solved that issue). Some good electron and ion temperature profiles were obtained in low densities. These will make for a good comparison with the ISP. But as the day progresses, the probe became unreliable. From the I-V traces, the Slit in ion saturation starts out with a normal profile (10's mA) then jumps by two orders of magnitude, indicating a sudden increase in collection area. Despite being held down tightly, it looks like the Slit's inertia is shorting it to the head. The other elements are not directly connected to the plasma, so this same diagnostic 'technique' cannot be used, but it is likely the same cause for them shorting out. Back to the clean room...

Physics Operator Summaries
Entered: Jun 27 2012 03:12:43:223PM
Author: Robert Granetz

Run summary for Wednesday 2012/06/27

MP667 - Commissioning of SOL probes

Session leader: D. Brunner
Physics operator: R. Granetz

The tokamak ran very well today.  The plasma configuration was the same all
day, with only a few density changes being made during the day.  The
startup didn't have to be touched at all.  The only issues were (a) the
vessel heaters breaker tripped between shots one time, which resulted in
the vessel cooling down to 10 C, and about 30 minutes were required to heat
it back up, and (b) a horizontal port seal started leaking argon in the
afternoon, and we lost a bit of time to remedy that.

We ended the run at 15:00 in order to accommodate the PSFC barbecue.

No fizzles, duds, or computer delays today!

Scorecard: 22 plasmas
            0 duds
            0 fizzles
            0 power supply tests
            0 no-power MDSplus cycle tests
            0 no-power gas test
           --------------
   Total:  22 shot cycles

Session Leader Comments
Jun 27 2012 09:04:09:350AM1120627001Dan BrunnerSetup: Loading target shot. Scanning probes, NINJA, and LBO off waiting for good plasma.

Result: Good target.

Next: Repeat shot. Probes enabled. NINJA and LBO may fire after 1.2 seconds.
Jun 27 2012 09:22:54:940AM1120627002Dan BrunnerSetup: Repeat Shot 1, but with probes scanning.

Result: Good shot. RFA messy. WASP and FSP looking good.

Next: Switching to only ion temperature. Push RFA and FSP in deeper.
Jun 27 2012 09:33:34:287AM1120627003Dan BrunnerSetup: Repeat Shot 2.

Result: Good shot. RFA looking good. FSP in too far, operator error.

Next: Push RFA in deeper, disable FSP.
Jun 27 2012 09:53:10:800AM1120627004Dan BrunnerSetup: Repeat Shot 3, RFA in deeper.

Result: Good plasma. RFA Collector card not working, cell access to swap.

Next: Push RFA in deeper, increase bias voltage.
Jun 27 2012 10:02:13:580AM1120627005Dan BrunnerSetup: Repeat Shot 4, RFA bias increased.

Result: Good plasma. ASP disabled from test shot, electronics working.

Next: Repeat with ASP enabled.
Jun 27 2012 10:15:40:117AM1120627006Dan BrunnerSetup: Repeat Shot 5, ASP enabled.

Result: Good plasma. RFA looks choppy because of Isat Slit.

Next: Repeat with floating Slit.
Jun 27 2012 10:36:51:223AM1120627007Dan BrunnerSetup: Repeat Shot 6, floating Slit.

Result: Good plasma, good data.

Next: Switch to Te.
Jun 27 2012 10:45:56:300AM1120627008Dan BrunnerSetup: Repeat Shot 8, Te-mode.

Result: Good plasma, good data.

Next: Switch to Ti, increase nl04 by 0.2 m-2.
Jun 27 2012 11:02:26:370AM1120627009Dan BrunnerSetup: Repeat Shot 8, increase nl04 by 0.2 m-2, Ti-mode.

Result: Good plasma, good data.

Next: Switch to Te.
Jun 27 2012 11:20:48:497AM1120627010Dan BrunnerSetup: Repeat Shot 9, Te-mode.

Result: Good plasma, decent data, Slit and Grid 1 may be coupled.

Next: Switch to Ti, increase nl04 by 0.2 m-2.
Jun 27 2012 11:58:33:490AM1120627011Dan BrunnerSetup: Repeat Shot 10, increase nl04 by 0.2 m-2, Ti-mode.

Result: Good plasma, Slit and Grid 1 coupled.

Next: Repeat, adjust bias scheme.
Jun 27 2012 12:24:29:227PM1120627012Dan BrunnerSetup: Repeat Shot 11, adjust bias scheme.

Result: Good plasma, set-up not balanced for this bias, cell access to adjust.

Next: Repeat.
Jun 27 2012 12:34:23:640PM1120627013Dan BrunnerSetup: Repeat Shot 12, adjust bias scheme.

Result: Good plasma, still need to adjust grids.

Next: Repeat.
Jun 27 2012 12:46:28:147PM1120627014Dan BrunnerSetup: Repeat Shot 12, adjust bias scheme.

Result: Good plasma, still need to adjust grids.

Next: Repeat.
Jun 27 2012 01:06:34:073PM1120627015Dan BrunnerSetup: Repeat Shot 14, adjust bias scheme.

Result: Good plasma, still need to adjust grids.

Next: Repeat.
Jun 27 2012 01:19:01:290PM1120627016Dan BrunnerSetup: Repeat Shot 15, adjust bias scheme.

Result: Good plasma, still need to adjust grids.

Next: Repeat.
Jun 27 2012 01:39:16:550PM1120627017Dan BrunnerSetup: Repeat Shot 16, adjust bias scheme.

Result: Good plasma, still need to adjust grids.

Next: Repeat.
Jun 27 2012 01:47:43:443PM1120627018Dan BrunnerSetup: Repeat Shot 17, adjust bias scheme.

Result: Good plasma, still need to adjust grids.

Next: Repeat, increase nl04 by 0.2 m-2.
Jun 27 2012 01:59:38:527PM1120627019Dan BrunnerSetup: Repeat Shot 18, adjust bias scheme, increase nl04 by 0.2 m-2.

Result: Good plasma, still need to adjust grids.

Next: Repeat.
Jun 27 2012 02:17:35:747PM1120627020Dan BrunnerSetup: Repeat Shot 19, adjust bias scheme.

Result: Good plasma, still need to adjust grids.

Next: Repeat.
Jun 27 2012 02:37:31:343PM1120627021Dan BrunnerSetup: Repeat Shot 20, adjust bias scheme.

Result: Good plasma, still need to adjust grids.

Next: Repeat.

Physics Operator Comments
Jun 27 2012 09:08:32:660AM1120627001Robert Granetz
Shot 01 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.4e20 m-2, LSN.  Good target for Dan's RFA probe.

Next shot: no DPCS changes; enable argon puff; Dan will run RFA probe on next shot

Jun 27 2012 09:18:19:607AM1120627002Robert Granetz
Shot 02 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.4e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 09:44:58:837AM1120627003Robert Granetz
Shot 03 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.4e20 m-2, LSN.  RFA probe scanned.
           FSP also scanned, but Looks like it went in a bit too far...lots of brightness, moly specks flying
           off of it, and glowing probe tip (WIDE2 camera).

Next shot: no DPCS changes

Jun 27 2012 09:45:37:637AM1120627004Robert Granetz
Shot 04 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.4e20 m-2, LSN.  RFA probe scanned.
           FPA did not scan on this shot.

Next shot: no DPCS changes

Jun 27 2012 10:08:59:097AM1120627005Robert Granetz
Shot 05 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.4e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 10:20:59:833AM1120627006Robert Granetz
Shot 06 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.4e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 10:34:15:460AM1120627007Robert Granetz
Shot 07 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.4e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 10:49:41:540AM1120627008Robert Granetz
Shot 08 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.4e20 m-2, LSN.  RFA probe scanned.

Next shot: increase nl_04 by 0.2e20 m-2 (to 0.65e20 m-2); also start TF 100 ms earlier
           than usual, i.e. at t=-1.1 s (on both DPCS programming and PLC start time)

Jun 27 2012 10:59:48:557AM1120627009Robert Granetz
Shot 09 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.6e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 11:35:39:020AM1120627010Robert Granetz
Shot 10 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.6e20 m-2, LSN.  RFA probe scanned.

Next shot: increase nl_04 by another 0.2e20 m-2 (to 0.85e20 m-2)

Jun 27 2012 11:58:36:760AM1120627011Robert Granetz
Shot 11 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.8e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 12:20:20:090PM1120627012Robert Granetz
Shot 12 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.8e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 12:30:49:750PM1120627013Robert Granetz
Shot 13 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.8e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 12:46:21:483PM1120627014Robert Granetz
Shot 14 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.8e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 01:06:25:467PM1120627015Robert Granetz
Shot 15 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.8e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 01:17:35:317PM1120627016Robert Granetz
Shot 16 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.8e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 01:38:06:430PM1120627017Robert Granetz
Shot 17 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.8e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 01:49:35:140PM1120627018Robert Granetz
Shot 18 -- Plasma, good shot.  0.8 MA, 5.4 T, 0.8e20 m-2, LSN.  RFA probe scanned.

Next shot: increase nl_04 by 0.2e20 m-2 (to 1.05e20 m-2)

Jun 27 2012 02:02:25:447PM1120627019Robert Granetz
Shot 19 -- Plasma, good shot.  0.8 MA, 5.4 T, 1.0e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 02:12:11:523PM1120627020Robert Granetz
Shot 20 -- Plasma, good shot.  0.8 MA, 5.4 T, 1.0e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 02:36:41:857PM1120627021Robert Granetz
Shot 21 -- Plasma, good shot.  0.8 MA, 5.4 T, 1.0e20 m-2, LSN.  RFA probe scanned.

Next shot: no DPCS changes

Jun 27 2012 02:54:55:713PM1120627022Robert Granetz
Shot 22 -- Plasma, good shot.  0.8 MA, 5.4 T, 1.0e20 m-2, LSN.  RFA probe scanned.

End of run (We are ending early for the PSFC barbecue.)

Engineering Operator Comments
ShotTimeTypeStatusComment
108:58:49:303AMPlasmaOk
209:12:26:057AMPlasmaOk
309:25:54:523AMPlasmaOk
409:41:31:663AMPlasmaOk
509:55:37:220AMPlasmaOk
610:09:25:377AMPlasmaOk
710:24:00:220AMPlasmaOk
810:38:40:023AMPlasmaOk
910:54:48:197AMPlasmaOk
1011:08:09:630AMPlasmaOk
1111:50:36:263AMPlasmaOk
1212:07:14:467PMPlasmaOk
1312:24:16:837PMPlasmaOk
1412:40:22:947PMPlasmaOk
1512:58:29:547PMPlasmaOk
1601:12:08:050PMPlasmaOk
1701:25:28:087PMPlasmaOk
1801:39:28:593PMPlasmaOk
1901:52:59:253PMPlasmaOk
2002:06:17:140PMPlasmaOk
2102:32:08:730PMPlasmaOk
2202:52:23:817PMPlasmaOk

System Availability
Jun 27 2012 08:58:29:740AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Jun 15 2012 05:02:46:313PM (dekow)Jim IrbyBoronizationdekow,irby
CECEno Jan 6 2012 03:48:47:060PM Anne WhiteCorrelation ECEwhitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertoryes Jun 15 2012 05:02:31:550PM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012. New controller installed 5/29/2012Jun 7 2012 10:40:00:957AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridnoLH is now safe for manned entry into machine. Positioner locked and tagged off. Switches locked in dummy load position.Mar 2 2012 02:34:28:943PM (dterry)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphayesMidplane Lyman-a. New B-PORT Lyman (BPLY) still being debugged.Apr 20 2012 10:44:00:540AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonno McPherson viewing the 10-14 nm region for molybdenum monitoring. It's days are numbered as LoWEUS has demonstrated superiority.Apr 20 2012 10:44:10:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.May 1 2012 08:31:33:743AM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1120608, the high frequency channels: 112, 140 and the variable, have been disconnected for some troubleshooting. All other channels are connectedJun 14 2012 11:28:59:603AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationnoSSS is up to air, no safety issues.Feb 27 2012 01:51:48:783PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:32:050PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:51:363PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke