Alcator C-Mod Run 1120719 Information

Back to runs

Miniproposals
Miniproposal:691
Date Filed: 1/11/2012
Title:Development of TEM in high performance ITBs
First Author:Catherine Fiore
Session Leader:Catherine Fiore (shots 15-30)
Miniproposal:698
Date Filed: 5/7/2012
Title:ITER-like discharge studies at reduced Bt
First Author:Chuck Kessel
Session Leader:Chuck Kessel (shots 1-14)

Operators
Session leader(s):Chuck Kessel,Catherine Fiore
Physics operator(s):Yijun Lin
Engineering operator(s):Bill Cochran,Ed Fitzgerald

Engineering Operator Run Comment
MP698 ITER-like plasmas, MP691: TEMs in high performance ITBs

Session Leader Plans
Entered: Jul 19 2012 08:00:10:940AM
Author: Chuck Kessel
MP698 ITER-like Discharges at 2.7T

Partial run day to recover 3 hours lost on 1120717 due to alternator shutdown

Recover shot 1120717021

Raise ICRF power in order to raise Pnet, attempting to hold long EDA phase in flattop
Need to achieve steady ICRF pulses, so boronization recovery is critical
Maintain n/nGr --> 0.85, possibly adjust end of ramp density

Maintain good discharge features established on 1120717 (rampup, early divert, rampdown, elongation, Ip waveform)


Entered: Jul 19 2012 12:16:24:017PM
Author: Catherine Fiore
This run is in support of MP 691, Development of TEM in high performance ITBs

Overnight boronization. This work will begin at noon. Presumably boron recovery will be complete by then.

We will need argon for Hirex, but it should be kept at the minimum that is needed for measuremets of Ti and rotation profiles.

We will begin with at least one locked mode shot for HIREX calibration.

The shots should be based on shot 1040310014.

Once preliminary shots have been taken, we need to set up EDA H-mode shots at 6.3 T (possibly 6.25 T) to try to obtain reproducible ITBs. We would like to begin with 3MW ICRF power

Once a good data set (HIREX, PCI, Thomson, other fluctuations) have been obtained at this power level, the power level should be increased over several shots to obtain fluctuation data with increasing power.

Physics Operators Plans
Entered: Jul 18 2012 03:22:55:200PM
Author: Yijun Lin
1120719:
1st part: MP698 ITER-like plasmas
SL: C. Kessel

2nd part: MP691: TEMs in high performance ITBs
SL: C. Fiore

PO: Y. Lin
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1120717021

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup: (NOTE special gas setup! )

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 2 psi NEON Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED
fill H-bottom with 2 psi ARGON Hybrid disabled (PG5)

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus/LoWEUS
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): yes
Overnight ECDC (yes/no): yes
ICRF(yes/no): yes. max power available.
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): unavailable.

--------------

PO-Plan:
part 1: MP698:
finish C. Kessel's run that was terminated early due to alternator problems.
reload shot 1120717021 and start from there.

part 2: MP 691
Try to re-create plasma conditions similar to shot 1040310014 (using a recent LSN shot, and modify the equilibrium to that of 1040310014) and re-produce ITBs at Bt0 ~ 6.3 T. Start with about 3 MW ICRF (assuming conditioned in the first part of the run day). After ITB is obtained, we will increase ICRF power and study fluctuations. If ITB cannot be achieved at ~6.3 T, run Bt0 ~ 4.6 T. See SL_PLAN for more details.

Session Leader Summaries
Entered: Jul 19 2012 05:21:48:687PM
Author: Catherine Fiore
This run is in support of MP 691, Development of TEM in high performance ITBs

We begin on shot 15 with a locked mode shot.

We had 2 locked mode shots, 1 no power shots, and most of the remainder exhibited ITB peaking. The best shots were 21-24, but most of the shots generated usable ITBs. Today we focused on re-establishing high power ITBs. Tomorrow we will focus on increasing the ICRF power into them.

Shot 15-- Locked mode shot for HIREX. Signal low, so we might need another later. We will be setting up the EDA H-mode and ITB over the next few shots.

Shot 16-- No power shot

Shot 17--No steady H-mode. Many faults on the ICRF. It is suggested that we raise the density somewhat to get EDA H-modes

Shot 18--One steady H-mode, but not long enough for a good ITB. Many back transitions after that. We still don't have steady rf, D dropped out early. It may take a while to get the shot set up.

Shot 19--One steady (0.4 s) H-mode. There was a weak amount of peaking, leaning towards ITB. Two back transitions after that. We still don't have steady rf, D dropped out early.

Shot 20--Very late H-mode. No ITB Still having problems with rf tuning.

Shot 21--Good long ITB. We need more argon to get the Ti and rotation.

Shot 22--Beautiful long ITB. We still need more argon to get the Ti and rotation.

Shot 23--Another good ITB. We are still having problems getting argon in. We are changing plenums.

Shot 24--Another good ITB, but ended a bit early. The density was much more peaked, and the PCI signature was different. This could be very interesting in the stability analysis, because the temperature is also lower.

We had some argon in, but Matt would like more.

Shot 25--A couple of Moly injections, but an ITB formed on the last H-mode. We have enough argon. The rf power is at 3.5 Mhz. We need to make sure we have good rotation and Ti data before beginning the power scan.

Shot 26--ITB on the second H-mode. We should have HIREX data. We are backing off a little on the ICRF power.

Shot 27--ITB on the second H-mode. Repeat to make sure we have good data

Shot 28--ITB on the second H-mode A bit more peaked than the one before. HIREX needs a locked mode for the next shot.

Shot 29--Locked mode shot

Shot 30--ITB on the first H-mode. RF power at 4 MW. Tomorrow's run will resume from this point.

Entered: Jul 19 2012 09:25:57:807PM
Author: Chuck Kessel
MP698 ITER-like Discharges at 2.7T

A 3 hour run was performed to make up for lost time on 1120717 due an alternator shutdown.

Recovery of 1120717021 with the previous night's boronization was largely done by shot 005, at n/nGr = 0.85, betaN = 1.75. Shot 004 reached the Greenwald density in its EDA H-mode phase. In shot 006 the ICRF power was raised from 4.0 MW to 4.5 MW in the flattop. In shot 007 the ICRF power was raised to 5 MW in flattop, although there were several dropouts. The betan values were consistently reaching sustained values of 1.8 for over 500 ms, with excursions above 2.0. The ICRF power in the rampdown was obtained in 007 and we got a full rampdown. We began to incrementally increase the density request with shot 008 to maintain the flattop EDA H-mode density near the target of 0.85nGr. By shot 010 we were not getting the ICRF power to remain steady, and introduced neon. Although 010 disrupted, the same was tried in 011-014, and the neon clearly improved the ICRF power. 3 levels were tried, 50, 40 and 30 V. The 2 higher were satisfactory, while the lowest seem not quite enough. Although the radiated power rose over no neon, it was not detrimental. High Pnet over n values were obtained, up to 1.3 with H98 values as high as 0.9. The final discharge gave betan > 2 for over 300 ms. The 10 KHz MHD signal was evident on several shots, however, it could take on a range of characters.

Overall for MP698, the runday was quite successful, providing a significant extension of the database for ITER-like flattop performance at the high density operating point. This will be reported at the IAEA and APS meetings. Thanks to I. Hutchinson, S. Wolfe, Y. Lin, S. Wukitch, M. Reinke (who has been vindicated by good neon performance), J. Hughes, the C-Mod team.

Physics Operator Summaries
Entered: Jul 19 2012 05:05:30:577PM
Author: Yijun Lin
Startup was good all day.
Good ITER like plasmas (650 kA, 2.7T) for the 1st part. Also good RF power > 4.5 MW with Neon puff (from B-side lower) (shot 12, 13 etc).

Good ITB plasmas (1 MA, 6.25 T) for the 2nd part.

Using H-bottom 3 psi for Argon puff seemed to be not working (shot 16-22). Switched back to B0-side lower for Argon since shot 23.

plasma attempts: 30
fizzle: ZERO (0)
no power shot: 1 (due to engineering operator error)

Several early disruptions in the beginning to recover from boronization.

Session Leader Comments
Jul 19 2012 10:36:33:287AM1120719006Chuck KesselWe are cooking now. ICRF is moving above 1120717 levels, radiated power is dropping, and n is very close to 0.85nGr. Lower L-mode density request is removing the early ELM free H-mode. betaN is peaking around 2 and dropping to 1.7-1.85.
Jul 19 2012 11:19:09:947AM1120719009Chuck KesselPushing ICRF to 5 MW, and raising slowly the requested n. Good up to 008, 009 a bit worse due to full ICRF drop out, density stops rising, although radiated power is not high. ICRF seems near limit, try neon in next shot. Pnet/n would be pretty high if ICRF power can stay steady.
Jul 19 2012 12:02:01:323PM1120719014Chuck KesselIntroduced neon which has helped A LOT with ICRF. Have good high n/nGr, H98, betan...and rising H98, so Pnet/n vs H98 trend is emerging.

THANKS to Catherine for the 3 hours today! We had excellent additional data from 1120717. ICRF up to 5 MW, high Te, higher tped ~ 500 eV.
Jul 19 2012 12:30:09:137PM1120719015Catherine FioreLocked mode shot for HIREX. Signal low, so we might need another later. We will be setting up the EDA H-mode and ITB over the next few shots.


Jul 19 2012 12:37:59:510PM1120719016Catherine FioreNo power shot
Jul 19 2012 12:58:21:477PM1120719017Catherine FioreNo steady H-mode. Many faults on the ICRF. It is suggested that we raise the density somewhat to get EDA H-modes
Jul 19 2012 01:13:08:547PM1120719018Catherine FioreOne steady H-mode, but not long enough for a good ITB. Many back transitions after that. We still don't have steady rf, D dropped out early. It may take a while to get the shot set up.
Jul 19 2012 01:29:28:800PM1120719019Catherine FioreOne steady (0.4 s) H-mode. There was a weak amount of peaking, leaning towards ITB. Two back transitions after that. We still don't have steady rf, D dropped out early.
Jul 19 2012 01:43:44:133PM1120719020Catherine FioreVery late H-mode. No ITB Still having problems with rf tuning.
Jul 19 2012 02:01:28:870PM1120719021Catherine FioreGood long ITB. We need more argon to get the Ti and rotation.
Jul 19 2012 02:22:48:137PM1120719022Catherine FioreBeautiful long ITB. We still need more argon to get the Ti and rotation.
Jul 19 2012 02:42:16:290PM1120719023Catherine FioreAnother good ITB. We are still having problems getting argon in. We are changing plenums.
Jul 19 2012 03:10:31:340PM1120719024Catherine FioreAnother good ITB, but ended a bit early. The density was much more peaked, and the PCI signature was different. This could be very interesting in the stability analysis, because the temperature is also lower.

We had some argon in, but Matt would like more.


Jul 19 2012 03:30:51:150PM1120719025Catherine FioreA couple of Moly injections, but an ITB formed on the last H-mode. We have enough argon. The rf power is at 3.5 Mhz. We need to make sure we have good rotation and Ti data before beginning the power scan.

Jul 19 2012 03:49:28:120PM1120719026Catherine FioreITB on the second H-mode. We should have HIREX data. We are backing off a little on the ICRF power.
Jul 19 2012 04:07:32:533PM1120719027Catherine FioreITB on the second H-mode. Repeat to make sure we have good data
Jul 19 2012 04:30:08:417PM1120719028Catherine FioreITB on the second H-mode A bit more peaked than the one before. HIREX needs a locked mode for the next shot.
Jul 19 2012 04:46:46:380PM1120719029Catherine FioreLocked mode shot for HIREX
Jul 19 2012 05:11:32:233PM1120719030Catherine FioreITB on the first H-mode. RF power at 4 MW. Tomorrow's run will resume from this point.

Physics Operator Comments
Jul 19 2012 09:12:57:963AM1120719001Yijun Linreload shot 1120717021. try to replicate the shot.
(there was programed PG1 for Neon puff, but hybrid is disabled).
shorten PG4 pre-puff from 22 ms to 20 ms...pre-emptive move after a fresh boronization...

(note TF starts at -0.5 sec for this 3 T startup. I will need to move it for 2nd part of the run)

Load at 19-Jul-2012 08:43:59.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

result: disrupted 0.35 sec. start up ok.

next: no dpcs change.
Jul 19 2012 09:27:04:993AM1120719002Yijun Lintarget: Ip 0.65 MA, nl 0.9e20 m^-2, 2.7 T
result: disrupted 0.88 sec.

next shot: no pcs change.
Jul 19 2012 09:47:22:693AM1120719003Yijun Lintarget: Ip 0.65 MA, nl 0.9e20 m^-2, 2.7 T
result: disrupted at 0.84 s.

next shot: lower density demand to 0.7 and see if we can keep density lower.Load
at 19-Jul-2012 09:46:55.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

Jul 19 2012 09:56:07:877AM1120719004Yijun Lintarget: Ip 0.65 MA, nl 0.7e20 m^-2, 2.7 T
result: disrupted at 1.55 sec.

next shot: no pcs change.
Jul 19 2012 10:10:13:177AM1120719005Yijun Lintarget: Ip 0.65 MA, nl 0.7e20 m^-2, 2.7 T
result: ended at 1.62 sec ramp-down.

next shot: no pcs change.
Jul 19 2012 10:30:13:710AM1120719006Yijun Lintarget: Ip 0.65 MA, nl 0.7e20 m^-2, 2.7 T
result: ended at 1.67 sec ramp-down.

next shot: no pcs change.
Jul 19 2012 10:40:03:287AM1120719007Yijun Lintarget: Ip 0.65 MA, nl 0.7e20 m^-2, 2.7 T
result: full length

next shot: nl 0.75

Load at 19-Jul-2012 10:39:46.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

Jul 19 2012 10:49:57:937AM1120719008Yijun Lintarget: Ip 0.65 MA, nl 0.75e20 m^-2, 2.7 T
result: full length

next shot: nl 0.8
Jul 19 2012 11:08:13:610AM1120719009Yijun Lintarget: Ip 0.65 MA, nl 0.8e20 m^-2, 2.7 T
result: full length

next shot: add neon PG1, 40% from .4-0.6 sec. Ask Engieering Operator to enable hybrid for B-side lower (2 psi Neon filled)

Load at 19-Jul-2012 11:06:51.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

Jul 19 2012 11:18:28:707AM1120719010Yijun Lintarget: Ip 0.65 MA, nl 0.8e20 m^-2, 2.7 T, neon puff
result: disrupted 0.26 sec.

next shot: no pcs change.
Jul 19 2012 11:34:25:157AM1120719011Yijun Lintarget: Ip 0.65 MA, nl 0.8e20 m^-2, 2.7 T, neon puff
result: much better RF with Neon puff.

next shot: move neon later by 0.3 s. (0.70-0.9 sec)
Jul 19 2012 11:47:45:777AM1120719012Yijun Lintarget: Ip 0.65 MA, nl 0.8e20 m^-2, 2.7 T, neon puff
result: plasma

next shot: nl 0.85, neon 50%, 0.7-0.9 sec
Load at 19-Jul-2012 11:47:31.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

Jul 19 2012 11:58:49:037AM1120719013Yijun Lintarget: Ip 0.65 MA, nl 0.85e20 m^-2, 2.7 T, neon puff
result: plasma

next shot: 30% Neon, 0.7-0.9 sec


Jul 19 2012 12:10:35:740PM1120719014Yijun Lintarget: Ip 0.65 MA, nl 0.85e20 m^-2, 2.7 T, neon puff
result: plasma

next shot:

switch experiment. 6.3 T run.
locked mode shot, load shot 1120626029


Jul 19 2012 12:22:15:080PM1120719014Yijun LinLocked mode shot.

Engineering setup reloaded from shot 1120614028
move TF limit to 180 (for 6.3 T shot)

disable B-side lower
enable H-bottom (2.9 PSI Argon)

load shot 1120626029
lower PG5 demand to 50% (segment 4 for locked mode)
use its start-up, but shorten PG4 prepuff to 20 ms. also started TF at -1.1 sec

Load at 19-Jul-2012 12:16:43.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

result: good shot.

Jul 19 2012 12:40:34:070PM1120719016Yijun LinTarget: 6.2 T, LSN, 1.1 MA, nl04: 1.0e20 m^-2, try ITB...
a lot changes made for shot setup
reloaded a saved shot 1120719101...which was based on the shape of shot 1040310014, but at 1.1 MA..

result: no alternator excitation...no power shot.

next: no pcs change.
Jul 19 2012 12:58:29:120PM1120719017Yijun LinTarget: 6.2 T, LSN, 1.1 MA, nl04: 1.0e20 m^-2, try ITB...

result: plasma. full length. more like ELM-fee H-modes.

next: raise density to 1.15 e20 m^-2. A little touch on plasma shape. Also a correction on the start of TF waveform in segment 2.
Jul 19 2012 01:17:12:183PM1120719018Yijun LinTarget: 6.3 T, LSN, 1.1 MA, nl04: 1.15e20 m^-2, try ITB.

result: plasma.

next: shorten Argon puff. raise density to 1.25
Jul 19 2012 01:27:27:477PM1120719019Yijun LinTarget: 6.3 T, LSN, 1.1 MA, nl04: 1.15e20 m^-2, try ITB.

result: plasma.

next: lower current to 1 MA. no other change.

Load at 19-Jul-2012 13:25:01.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

Jul 19 2012 01:58:22:213PM1120719020Yijun LinTarget: 6.3 T, LSN, 1.0 MA, nl04: 1.15e20 m^-2, try ITB.

result: plasma.

next: no dpcs change.
Jul 19 2012 02:03:20:660PM1120719021Yijun LinTarget: 6.3 T, LSN, 1.0 MA, nl04: 1.25e20 m^-2, try ITB.

result: plasma. Maybe ITB.

next: argon to 45 ms. TF to 174 kA from 175 kA (--> 6.25 T).
no other change.

Load at 19-Jul-2012 14:03:07.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

Jul 19 2012 02:31:33:700PM1120719022Yijun LinTarget: 6.25 T, LSN, 1.0 MA, nl04: 1.25e20 m^-2, try ITB.

result: plasma. ITB.

next: 100% 50 ms Argon.

Load at 19-Jul-2012 14:31:20.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

Jul 19 2012 02:46:20:077PM1120719023Yijun LinTarget: 6.25 T, LSN, 1.0 MA, nl04: 1.25e20 m^-2, try ITB.

result: plasma. ITB. Still no argon.

next shot: pump out b-side lower (neon)...fill 1 psi argon. hybrid enabled.
H-bottom hybrid disabled.

Argon puff PG1 0.3-0.35 sec, 100%..

Load at 19-Jul-2012 14:45:19.00
Open tree /home/ylin/pcs_scratch -1
Open tree done
Jul 19 2012 03:04:19:790PM1120719024Yijun LinTarget: 6.25 T, LSN, 1.0 MA, nl04: 1.25e20 m^-2, try ITB.

result: plasma. ITB.

next shot: argon 75 ms.

Load at 19-Jul-2012 15:03:31.00
Open tree /home/ylin/pcs_scratch -1
Open tree done
Jul 19 2012 03:25:42:430PM1120719025Yijun LinTarget: 6.25 T, LSN, 1.0 MA, nl04: 1.25e20 m^-2, try ITB.

result: plasma. ITB.

next shot: no pcs change.


Jul 19 2012 03:48:18:657PM1120719026Yijun LinTarget: 6.25 T, LSN, 1.0 MA, nl04: 1.25e20 m^-2, try ITB.

result: plasma. ITB.

next shot: no pcs change.


Jul 19 2012 04:06:54:830PM1120719027Yijun LinTarget: 6.25 T, LSN, 1.0 MA, nl04: 1.25e20 m^-2, try ITB.

result: plasma. ITB.

next shot: no pcs change.


Jul 19 2012 04:35:16:943PM1120719028Yijun LinTarget: 6.25 T, LSN, 1.0 MA, nl04: 1.25e20 m^-2, try ITB.

result: plasma. ITB.

next shot: locked mode shot... turn off segment 2, turn on segment 3.
Load at 19-Jul-2012 16:35:02.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

Jul 19 2012 04:48:57:077PM1120719029Yijun Linlocked mode shot.
result: plasma.

next: turn off segment 3, turn on segment 2 (run 6.25 T ITB shot).

Load at 19-Jul-2012 16:48:24.00
Open tree /home/ylin/pcs_scratch -1
Open tree done

Jul 19 2012 05:04:46:563PM1120719030Yijun LinTarget: 6.25 T, LSN, 1.0 MA, nl04: 1.25e20 m^-2, try ITB.

result: plasma. ITB.

end of run.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:04:22:280AMPlasmaOk
209:21:31:523AMPlasmaOk
309:34:52:483AMPlasmaOk
409:50:27:290AMPlasmaOk
510:03:45:417AMPlasmaOk
610:16:10:127AMPlasmaOk
710:31:27:687AMPlasmaOk
810:43:55:343AMPlasmaOk
910:57:44:350AMPlasmaOk
1011:10:12:317AMPlasmaOk
1111:22:40:850AMPlasmaOk
1211:35:33:163AMPlasmaOk
1311:48:27:227AMPlasmaOk
1412:01:33:317PMPlasmaOk
1512:18:57:740PMPlasmaOk
1612:34:51:177PMPlasmaBadPulse state missed
1712:48:00:087PMPlasmaOk
1801:00:30:517PMPlasmaOk
1901:18:28:440PMPlasmaOk
2001:35:56:143PMPlasmaOk
2101:53:16:613PMPlasmaOk
2202:13:41:660PMPlasmaOk
2302:34:04:990PMPlasmaOk
2402:55:22:990PMPlasmaOk
2503:16:44:483PMPlasmaOk
2603:38:11:103PMPlasmaOk
2704:00:21:780PMPlasmaOk
2804:22:51:833PMPlasmaOk
2904:43:38:063PMPlasmaOk
3005:01:04:350PMPlasmaOk

System Availability
Jul 19 2012 09:03:59:813AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Jun 15 2012 05:02:46:313PM (dekow)Jim IrbyBoronizationdekow,irby
CECEyesThe system is currently operational for Te tilde measurement. Talk to Choongki about the current configuration Jul 3 2012 04:38:00:317PM (nthoward)Anne WhiteCorrelation ECEnthoward,sck83,whitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertoryes Jun 15 2012 05:02:31:550PM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012. New controller installed 5/29/2012Jun 7 2012 10:40:00:957AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH is now available for plasma operation up to ~900 kW net power.Jul 3 2012 02:50:00:693PM (wallaceg)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman-a not functioning. New B-PORT Lyman (BPLY) still being debugged.Jul 12 2012 08:52:28:233AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnoMcPherson under vacuum but is not run on a day-to-day basis. Can be requested if desired. LoWEUS has taken over as the primary Mo monitor.Jul 12 2012 08:53:14:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Jul 10 2012 07:08:06:883PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1120608, the high frequency channels: 112, 140 and the variable, have been disconnected for some troubleshooting. All other channels are connectedJun 14 2012 11:28:59:603AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS is under vacuum and fully available.Jul 3 2012 02:46:59:753PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:32:050PM (jwhughes)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with one 50Hz laser, precise density calibration still required.May 9 2012 03:12:51:363PM (jwhughes)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke

Jul 19 2012 10:31:25:733AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Jun 15 2012 05:02:46:313PM (dekow)Jim IrbyBoronizationdekow,irby
CECEyesThe system is currently operational for Te tilde measurement. Talk to Choongki about the current configuration Jul 3 2012 04:38:00:317PM (nthoward)Anne WhiteCorrelation ECEnthoward,sck83,whitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertoryes Jun 15 2012 05:02:31:550PM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012. New controller installed 5/29/2012Jun 7 2012 10:40:00:957AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH is now available for plasma operation up to ~900 kW net power.Jul 3 2012 02:50:00:693PM (wallaceg)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman-a not functioning. New B-PORT Lyman (BPLY) still being debugged.Jul 12 2012 08:52:28:233AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnoMcPherson under vacuum but is not run on a day-to-day basis. Can be requested if desired. LoWEUS has taken over as the primary Mo monitor.Jul 12 2012 08:53:14:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Jul 10 2012 07:08:06:883PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1120608, the high frequency channels: 112, 140 and the variable, have been disconnected for some troubleshooting. All other channels are connectedJun 14 2012 11:28:59:603AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS is under vacuum and fully available.Jul 3 2012 02:46:59:753PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:09:220AM (jrwalk)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:28:323AM (jrwalk)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke