Alcator C-Mod Run 1120726 Information

Back to runs

Miniproposals
Miniproposal:667
Date Filed: 9/6/2011
Title:Commissioning of new SOL probes
First Author:Dan Brunner
Session Leader:Dan Brunner (shots 1-30)

Operators
Session leader(s):Dan Brunner
Physics operator(s):Syunichi Shiraiwa
Engineering operator(s):Andy Pfeiffer,Sam Pierson,Roza Tesfaye

Engineering Operator Run Comment
MP 667: Commissioning of new SOL probes SL D.Brunner PO S.Shiraiwa

Session Leader Plans
Entered: Jul 25 2012 01:30:04:897PM
Author: Dan Brunner
MP 667: Commissioning of new SOL probes

The purpose of this run day is to acquire ion temperature profiles in the SOL with the Ion Sensitive Probe (ISP) over a range of densities. Will also puff He after the probes scan (1.2 s) to get CXRS B5+ ion temperature profiles for comparison.

Start from shot 1120627010 from previous MP667 run (5.4 T, 0.8 MA, 0.4x10^20 m^-2). Target probes. When data is good, notch up nl04 by 0.2x10^20 m^-2. Don't spend too much time at the low density, need to get more high density data. If time left at the end of the run either fill in gaps in the density or try a density scan at 0.5 MA.

For CXRS: fill NINJA plenum with 10 psi Helium DISABLED.

Physics Operators Plans
Entered: Jul 26 2012 01:17:56:327PM
Author: Syunichi Shiraiwa
0726 PO plan

MP 667: Commissioning of new SOL probes
SL D.Brunner
PO S.Shiraiwa
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1120627010

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi He DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus/LoWEUS
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): no
ICRF(yes/no): no
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Jul 29 2012 01:06:30:040PM
Author: Dan Brunner
Post Run: Very good day for the ISP, despite the power supply troubles of yesterday. The voltage was droping out on current spikes. After nearly a whole day of debugging during shots, Brian came up with the simple solution of capacitors on the output.

Run started out at 5.4 t, 0.8 MA with a simple density scan from sheath-limited to detached deivertor. Initial temperature profiles look good, Ti ~= 3Ã?Te, as shown previously and expected by simple transport arguments. The power supply on the Guard drooped at higher density, thus voltage on the Collector wasn't maintained. The data every, except near the LCFS, at high density is still good. Initial inspection of the data reveals that Ti appears to lower in the SOL as the density is raised (expected due to higher collisionality), but doesn't equilibrate with Te.

Next put the current down to 0.58 MA with a simple density scan. The lower current allowed to scan the edge density regiemes without exceeding current limits on the supplies. Data looks good, only getting to current limits at highest density. Ti is lower at this current. It appears that some scans were deep enough to see Ti~=Te.

Also got good data for comparison by CXRS. Let CECE piggy pack with some argon for HIREX and slight tweeks to the toroidal field.

Next up: analyze data, explore relative levels of heat transport by ions and electrons in the SOL.

Physics Operator Summaries
Entered: Jul 26 2012 05:21:55:533PM
Author: Syunichi Shiraiwa
Today, we tested a new ion probes using OH target plasmas
The machine worked well except for one interuption due
to power supply camac. We got 26 normal plasmas out
of 28 attempt (one fizzel and one runaway shut down)

The initial setting had a fizzle detector timing at 1.8s
We delaied it to 2.1s after a few shot.

PCS software became slower later today, but did not
became unacceptalbly slow.



Session Leader Comments
Jul 26 2012 09:04:51:337AM1120726001Dan BrunnerSetup: Reload shot 1120627010, reduce density to 0.4×1020 m-2. No probes scanning, waiting on target.

Result: Perfect target.

Next Shot: Repeat with probes.
Jul 26 2012 09:17:39:183AM1120726002Dan BrunnerSetup: Repeat, with probes scanning and NINJA puffing.

Result: Good scans, everything operating properly.

Next Shot: Repeat, push in deeper.
Jul 26 2012 09:46:54:480AM1120726003Dan BrunnerSetup: Repeat.

Result: Good scans, everything operating properly.

Next Shot: Repeat, push in deeper, adjust Bt slightly for CECE.
Jul 26 2012 10:12:32:127AM1120726005Dan BrunnerSetup: Increase density to 0.6×1020 m-2.

Result: Good scans.

Next Shot: Repeat.
Jul 26 2012 10:32:59:647AM1120726006Dan BrunnerSetup: Repeat.

Result: Good scans.

Next Shot: Repeat.
Jul 26 2012 10:48:44:780AM1120726007Dan BrunnerSetup: Repeat.

Result: Beautiful data.

Next Shot: Increase density to 0.8×1020 m-2.
Jul 26 2012 11:03:29:537AM1120726008Dan BrunnerSetup: Increase density to 0.8×1020 m-2.

Result: Data looks good.

Next Shot: Repeat.
Jul 26 2012 11:21:07:460AM1120726009Dan BrunnerSetup: Repeat.

Result: Data looks good.

Next Shot: Increase density to 0.9×1020 m-2.
Jul 26 2012 11:38:25:600AM1120726010Dan BrunnerSetup: Increase density to 0.9×1020 m-2.

Result: Data looks ok, droop at peak insertion.

Next Shot: Repeat.
Jul 26 2012 11:54:43:117AM1120726011Dan BrunnerSetup: Repeat.

Result: Data looks ok, droop at peak insertion.

Next Shot: Increase density to 1.0×1020 m-2.
Jul 26 2012 12:10:25:350PM1120726012Dan BrunnerSetup: Increase density to 1.0×1020 m-2.

Result: Data looks ok, droop at peak insertion.

Next Shot: Repeat.
Jul 26 2012 12:27:39:950PM1120726013Dan BrunnerSetup: Repeat.

Result: Data looks ok, droop at peak insertion.

Next Shot: Increase density to 1.15×1020 m-2.
Jul 26 2012 12:44:52:440PM1120726014Dan BrunnerSetup: Increase density to 1.10×1020 m-2.

Result: Data looks ok, droop at peak insertion.

Next Shot: Increase density to 1.15×1020 m-2.
Jul 26 2012 12:59:49:320PM1120726015Dan BrunnerSetup: Increase density to 1.15Ã?1020 m-2.

Result: Data looks ok, droop at peak insertion.

Next Shot: Increase density to 1.20Ã?1020 m-2.
Jul 26 2012 01:15:27:143PM1120726016Dan BrunnerSetup: Increase density to 1.15×1020 m-2.

Result: Data looks ok, droop at peak insertion.

Next Shot: Decrease Ip to 0.55 MA, decrease density to 0.40×1020 m-2.
Jul 26 2012 01:32:28:283PM1120726017Dan BrunnerSetup: Decrease Ip to 0.55 MA, decrease density to 0.40×1020 m-2.

Result: Fizzle.

Next Shot: Try again.
Jul 26 2012 01:58:13:350PM1120726018Dan BrunnerSetup: Try again.

Result: Good target.

Next Shot: Repeat, try scanning.
Jul 26 2012 02:07:05:833PM1120726019Dan BrunnerSetup: Repeat, with probes.

Result: Good ASP ISP data, FSP was disabled.

Next Shot: Repeat.
Jul 26 2012 02:26:02:310PM1120726020Dan BrunnerSetup: Repeat.

Result: Good data.

Next Shot: Repeat, FSP in deeper.
Jul 26 2012 02:44:16:740PM1120726021Dan BrunnerSetup: Repeat.

Result: Good data.

Next Shot: Increase density to 0.4×1020 m-2.
Jul 26 2012 03:09:53:220PM1120726022Dan BrunnerDelay for critical power supply.
Jul 26 2012 03:36:39:873PM1120726022Dan BrunnerSetup: Repeat.

Result: Gas test.

Next Shot: Try plasma.
Jul 26 2012 03:38:03:700PM1120726023Dan BrunnerSetup: Plasma.

Result: Good data.

Next Shot: Increase density to 0.5×1020 m-2. Because of delays, will be changing density every shot. May come back and repeat some at the end if there is time.
Jul 26 2012 03:47:14:857PM1120726024Dan BrunnerSetup: Increase density to 0.5×1020 m-2.

Result: Run away shut down.

Next Shot: Try again.
Jul 26 2012 04:05:49:967PM1120726025Dan BrunnerSetup: Try again.

Result: Good data.

Next Shot: Increase density to 0.6×1020 m-2.
Jul 26 2012 04:18:07:310PM1120726026Dan BrunnerSetup: Increase density to 0.6×1020 m-2.

Result: Good data.

Next Shot: Increase density to 0.7×1020 m-2.
Jul 26 2012 04:33:31:043PM1120726027Dan BrunnerSetup: Increase density to 0.7×1020 m-2.

Result: Good data.

Next Shot: Try again for 0.7×1020 m-2.
Jul 26 2012 04:50:56:723PM1120726028Dan BrunnerSetup: Try again.

Result: Good data.

Next Shot: Increase density to 0.8×1020 m-2.

Physics Operator Comments
Jul 26 2012 09:07:38:883AM1120726001Syunichi Shiraiwaloaded 1120627010.
Full length plasma. Density during start-up fluctuating...

Next:
adjusted density PID little
Jul 26 2012 09:30:17:777AM1120726002Syunichi Shiraiwaa plasma. density is about 0.4

Next:
delayed fizzle detector to 2.1s
repeat

wating for checking EF1
Jul 26 2012 09:14:30:853AM1120726003Syunichi ShiraiwaAsked to change Fizzle detector timing to 2.1s
Jul 26 2012 09:49:17:077AM1120726003Syunichi Shiraiwaa plasma

Next:
reduced TF current by 150A for CECE
Jul 26 2012 09:58:11:960AM1120726004Syunichi ShiraiwaGot a plasma

Next: increase the density to 0.6e20
Jul 26 2012 10:01:22:137AM1120726004Syunichi ShiraiwaGot a plasma

Next: increase the density to 0.6e20
reduce I_Bt by 150A
Jul 26 2012 10:12:31:223AM1120726005Syunichi ShiraiwaDensity is little lower than 6e19
Bt is 5.43T...

Next:
Set I_BT to 148kA
Jul 26 2012 10:36:35:600AM1120726006Syunichi ShiraiwaBt 5.36T

Next:
Set I_BT to 151kA
Jul 26 2012 10:52:20:017AM1120726007Syunichi Shiraiwa5.46T

Next:
Set I_BT = 150kA
Jul 26 2012 11:08:05:490AM1120726008Syunichi Shiraiwa5.44T

Next: Set I_BT to 153kA
Jul 26 2012 11:24:36:253AM1120726009Syunichi ShiraiwaI_Bt was 150kA.

Next:
Set I_bt to 153kA
Set ne04 to 9.5e9 (9 was reqeusted)
Jul 26 2012 11:39:34:850AM1120726010Syunichi ShiraiwaBt = 5.55T
ne 9e19

Next:
I_bt = 150kA
same density
Jul 26 2012 11:55:14:960AM1120726011Syunichi Shiraiwane still shows increase after 1s....

Next: set ne04 request to 1e20
Jul 26 2012 12:09:39:813PM1120726012Syunichi ShiraiwaDensity still shows some increase

Next: adjust ne program to compensate the increase..
Jul 26 2012 12:33:03:020PM1120726013Syunichi ShiraiwaDensity is 0.9-1.0 before 1s.

Next: increase density
Jul 26 2012 12:45:16:073PM1120726014Syunichi Shiraiwane04 is about 1.1e20

Next:
increase density by 0.05e20
Jul 26 2012 12:58:53:973PM1120726015Syunichi Shiraiwane increase by 0.05-0.06 between 0.6 to 1.3s.
Isn't it good enough?

Next:
Jul 26 2012 01:00:28:153PM1120726015Syunichi Shiraiwane increase by 0.05-0.06 between 0.6 to 1.3s.
Isn't it good enough?

Next:
increase ne by another 0.05
Jul 26 2012 01:13:37:140PM1120726016Syunichi Shiraiwane ~ 1.15-1.2e20
Jul 26 2012 01:14:08:197PM1120726016Syunichi Shiraiwane ~ 1.15-1.2e20

Next: 550kA, ne04=0.4
Jul 26 2012 01:32:34:617PM1120726017Syunichi ShiraiwaFizzle
Jul 26 2012 01:51:43:507PM1120726018Syunichi ShiraiwaGot a plasma
density is high 0.6e20

Next: try to reduce the density
Jul 26 2012 02:15:46:320PM1120726019Syunichi Shiraiwadensity 0.4e20

Next:
set I_BT=152kA
Adjust pre-puff to avoid density overshoot.
Jul 26 2012 02:28:49:513PM1120726020Syunichi ShiraiwaDensity still do overshoot, but it becomes smaller

Next: repeat.(with little adjustment of ne04 request)
Jul 26 2012 03:03:53:293PM1120726021Syunichi Shiraiwane = 0.25-0.3e20

Next:
ne 0.4e20

(waiting for PS camac check)
Jul 26 2012 03:20:02:953PM1120726022Syunichi ShiraiwaGas test for He3
Jul 26 2012 03:37:09:297PM1120726023Syunichi Shiraiwane04 - 0.4

Next:
ne04 - 0.5
load seg 1 of 1120726022 to seg3
Jul 26 2012 03:59:33:980PM1120726024Syunichi Shiraiwarunaway shutdown?

(waiting for the data)

Next:
increase pre-puff as before.
Jul 26 2012 04:08:27:193PM1120726025Syunichi Shiraiwane ~ 0.5

Next:
increase the density to 0.6e20
increase the pre-puff
Jul 26 2012 04:20:04:603PM1120726026Syunichi Shiraiwane04 ~ 0.55-0.6

Next: increase the density to 0.7
Jul 26 2012 04:32:58:280PM1120726027Syunichi Shiraiwane04 ~ 0.6 at 1s. Need to be increased to 0.7

Next: increase ne04 request
Jul 26 2012 04:52:56:250PM1120726028Syunichi Shiraiwane04 ~ 0.7

Next : aim at ne04 ~ 0.8 at 1s
Jul 26 2012 05:03:44:917PM1120726029Syunichi Shiraiwane04 ~ 0.8

Next: gas test for he3

disable of the valves including ninja except
for He3

use seg3 alone
Jul 26 2012 05:13:37:707PM1120726030Syunichi ShiraiwaHe3 Gas test.

RGA shows increase of 3 (and tiny increase of 28).
All other mass are flat.

Increase of pressure is 0.01 mtorr

Engineering Operator Comments
ShotTimeTypeStatusComment
108:56:53:797AMPlasmaOk
209:09:22:870AMPlasmaOk
309:33:29:193AMPlasmaOk
409:49:29:320AMPlasmaOk
510:04:37:253AMPlasmaOk
610:22:51:553AMPlasmaOk
710:41:37:673AMPlasmaOk
810:57:18:503AMPlasmaOk
911:13:37:203AMPlasmaOk
1011:30:34:130AMPlasmaOk
1111:47:07:953AMPlasmaOk
1212:04:38:530PMPlasmaOk
1312:21:03:773PMPlasmaOk
1412:36:44:577PMPlasmaOk
1512:52:10:313PMPlasmaOk
1601:07:25:797PMPlasmaOk
1701:28:46:600PMPlasmaOk
1801:45:23:753PMPlasmaOk
1902:00:57:483PMPlasmaOk
2002:19:55:730PMPlasmaOk
2102:36:32:083PMPlasmaOk
2203:20:05:740PMTestOkGas test shot
2303:30:38:937PMPlasmaOk
2403:44:06:800PMPlasmaOk
2504:00:23:580PMPlasmaOk
2604:12:52:237PMPlasmaOk
2704:27:14:907PMPlasmaOk
2804:42:36:787PMPlasmaOk
2904:57:50:270PMPlasmaOk
3005:05:36:757PMPlasmaOkGas test shot

System Availability
Jul 26 2012 08:56:42:590AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Jun 15 2012 05:02:46:313PM (dekow)Jim IrbyBoronizationdekow,irby
CECEyesThe system is currently operational for Te tilde measurement. Talk to Choongki about the current configuration Jul 3 2012 04:38:00:317PM (nthoward)Anne WhiteCorrelation ECEnthoward,sck83,whitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertoryes Jun 15 2012 05:02:31:550PM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012. New controller installed 5/29/2012Jun 7 2012 10:40:00:957AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH is now available for plasma operation up to ~900 kW net power.Jul 3 2012 02:50:00:693PM (wallaceg)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman-a not functioning. New B-PORT Lyman (BPLY) still being debugged.Jul 12 2012 08:52:28:233AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnoMcPherson under vacuum but is not run on a day-to-day basis. Can be requested if desired. LoWEUS has taken over as the primary Mo monitor.Jul 12 2012 08:53:14:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Jul 10 2012 07:08:06:883PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1120608, the high frequency channels: 112, 140 and the variable, have been disconnected for some troubleshooting. All other channels are connectedJun 14 2012 11:28:59:603AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS is under vacuum and fully available.Jul 3 2012 02:46:59:753PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:09:220AM (jrwalk)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:28:323AM (jrwalk)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke