Alcator C-Mod Run 1120727 Information

Back to runs

Miniproposals
Miniproposal:699
Date Filed: 5/7/2012
Title:Explore LHCD efficiency at high denisty with H(He-3) plasma
First Author:Syunichi Shiraiwa
Session Leader:Syunichi Shiraiwa (shots 1-27)

Operators
Session leader(s):Syunichi Shiraiwa
Physics operator(s):Greg Wallace
Engineering operator(s):Bill Parkin,Ed Fitzgerald,Gary Dekow

Engineering Operator Run Comment
MP699: Explore LHCD efficiency at high density with H(He-3) plasma

Session Leader Plans
Entered: Jul 27 2012 11:07:12:933AM
Author: Syunichi Shiraiwa
*DRAFT*

MP699: Explore LHCD efficiency at high density with H(He-3) plasma

SL: S. Shiraiwa
PO: G. Wallace

Goal of this MP is to test to reproduce previous He3 minority
MC heated plasma and apply LHCD to see the benefit of higher
Te target plasma.

A target shot is 950608017. (Ip 800kA, Bt 6.3T, LSN). Reference
shots for control system are 1120710020 (USN), 6 (LSN)

Step 0: ECDC using H2

Step 1: switch over to H2 plasma and reproduce the core electron
heating observed in 950608017. (10 shots including the switch-over)


Start with USN case.

Previous experince indicates the importance of right amount
of He fraction and minimize D2, therefor we will try H
breakdown.

He3 concentration is scanned to compare the mode-conversion
regime and minority heating regime and find a optimum to obtain
highest Te. PCI will be used to monitor the MC layer location

ICRF from 0.65-1.4s
ne_bar = 1.0-1.2e20

LH from 0.8-1.3s 90deg to adjust coupling

2-1 Apply LHCD (5 shots, including one �??non-ICRF" discharge)
LHCD from 0.9-1.4s
75, 90, 120 deg phasing for a reference.
If higher phasing is possible, include 145 deg.
Scanning probe for SOL profile measurement. (making a notch
in RF pulse...?)

2-2 to take ohmic control case.

3. Repeat step 2 with ne_bar = 1.4e20 (5 shots)
4. Repeat step 2 with ne_bar = 0.7e20 (5 shots)
5. If time is available, change Ip to 600kA and/or 1200kA and repeat
step 2. (5 shots)

Gas Request
=====================================
Please see PO plan

AUX system
=====================================

Boronization: no
Impurity injector: no
ICRF: yes (E+J, D if works well with LH)
LH: yes
DNB:
Cryopump: yes

Dagnostics request
=====================================
Thomson (core+edge),
HXR camera,
LH probes,
TCI,
GPC (6.3 Tesla, non-theraml ECE),
HIREXSR (Ti and MCFD),
XTOMO (core+edge),
PCI (He concentration)
GPI (edge power abs.)
X-mode reflectometer (on LH launcher)



Physics Operators Plans
Entered: Jul 27 2012 09:04:15:740AM
Author: Greg Wallace
-----------------
Engineering Setup
-----------------

Run begins at 09:00 and ends at 17:00

Power systems as on: 1120710020 Change TF limit to 182 kA for 6.3 T operation.

Acoil: +Dtop -Dbot -Jtop +Jbot (standard) Hybrid Enabled

Gas setup: (Note non standard gas setup!!!)

Fill B-Top with 6 psi H2 Hybrid enabled (PG4)
Fill B-side lower with 1 psi Ar Hybrid DISABLED (PG1)
Fill B-side upper with 15 psi He3 Hybrid enabled (PG2)
fill B-main (C-side) with 40 psi H2 Hybrid enabled (PG3)
leave NINJA as is DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus/LoWEUS
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): YES. NON-STANDARD H2 ECDC OVERNIGHT!
ICRF(yes/no): yes
LH(yes/no): yes
Cryopump (yes/no): yes
DNB (yes/no): no

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: H2 at 2e-4 Torr (NOTE NON-STANDARD HYDROGEN OVERNIGHT ECDC!)
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Jul 27 2012 03:42:48:790PM
Author: Syunichi Shiraiwa
Clean LH+ICRF(J)

Next: No ICRF
Entered: Jul 27 2012 04:24:30:780PM
Author: Syunichi Shiraiwa
Fizzle
Entered: Jul 27 2012 05:44:25:747PM
Author: Syunichi Shiraiwa
It was a difficult run day today. We had several
technical issues including slowing down of computer system,
power supply break fault, delay due to alternator...

Major difficult was to make a target plasma reliably.
We got 6 fizzle + 9 disruptions before 0.7s. 3 of
them are early runaway shut down.
Part of the difficult may be due to H2 breakdown,
although previous experiments did not have a big
problem.

We got 5 full length plasma and 2 shots sustained
enough (>1s).

Nonetheless, there is interesting finding and
good news from today's experiment.

Shot 7 and 12 shows a good comparison of OH plasma
and ICRF MC heated plasma. With 2MW of ICRF Te0
reaches transiently 5keV, average (3-3.5keV)
compared to 2keV for OH. PCI shows MC layer located
close to center on this shot.

Interestingly, we found a good current drive at
ne ~ 1.1e20, even with OH! (shot 23). Comparison
of shot 20 and 23 suggests that LHCD can produce
similar amount of fast electrons independent from
ICRF. Generating fast electrons in ICRF heated
plasma at this density is probably good news,
although it sounded me contradictory to our
previous experience to a large degree...


Physics Operator Summaries
Entered: Jul 27 2012 05:19:49:900PM
Author: Greg Wallace
Physop Summary for 1120727

Today's run was in hydrogen majority with helium-3 minority. Breakdown in hydrogen as well. Getting a good startup proved problematic with many fizzles and runaway shutdowns. Also many disruptions due to injections (caused by weak absorption of the mode-converted ICRF?) which caused the usual post-disruption fizzle. Some computer problems in the morning slowed down the start of the run.

The PCS was running very very slowly in the morning. Wolfe suggested a workaround to make it run faster by storing files in a tmp directory rather than grabbing data from the tree for each operation. Instructions as follows:
1) Open a new terminal
2) type "export pcs_scratch=/tmp" and hit enter to set up a scratch directory in tmp
3) type "/usr/local/cmod/codes/pcs/pcs" and hit enter to launch pcs from the command line
This fix reduced the time to load a shot from > 2 min to 15 s.

Session Leader Comments
Jul 27 2012 10:05:29:100AM1120727002Syunichi ShiraiwaFizzle.

Large Ha singal without C2 signal.
Also vessel pressure was too high compared to 1120207020.


Jul 27 2012 10:20:32:400AM1120727003Syunichi ShiraiwaGot a plasma

Disrupted at 0.9s

Next:
asked to start ICRF at 0.35s
add Ar puf from 0.3s (75ms)

Jul 27 2012 11:00:01:643AM1120727004Syunichi Shiraiwa(post disruption ?) Fizzle



Jul 27 2012 11:39:03:767AM1120727005Syunichi ShiraiwaDisrupted at 0.55s

Absorption moved outward in this shot.

Next:
Reduce He3 to 150ms
Reduce ICRF power to 2MW
Dealy ICRF start at 0.6s
Jul 27 2012 11:59:06:560AM1120727007Syunichi ShiraiwaGot a full length plasma

LH did not couple. LH density may be too low.
heating looks good, Te0 reaches 5keV transiently.

Next:
reduce outer gap for coupling
increase ICRF J port power to 2MW
add 40ms notch to RF power at 0.9 s and 1.1s
use A-port scanning during notch.
edge H2 puff at 1.2s for CXRS


Jul 27 2012 12:10:38:603PM1120727008Syunichi ShiraiwaDisrupted after RF starts.

Next:
start J power at 1.3MW and increase to 2MW in
time, with the same two notchs
Jul 27 2012 12:46:16:930PM1120727010Syunichi ShiraiwaDisrupted at 0.65s

Next: increase RF from 1MW to 3MW in time
add notch to 0.6s, too

Jul 27 2012 01:13:35:377PM1120727012Syunichi Shiraiwa2nd full length plasma....;D
but no icrf power
Jul 27 2012 01:36:56:323PM1120727013Syunichi ShiraiwaDisruption at 1.25s
Jul 27 2012 01:53:59:047PM1120727013Syunichi Shiraiwahad LH and ICRF together for the first time.

Next:
reduce He3 to 100ms (from 150ms)


Jul 27 2012 01:54:21:507PM1120727014Syunichi ShiraiwaFull length plasma...

Jul 27 2012 02:08:41:130PM1120727014Syunichi ShiraiwaFull length plasma...
Deposition moves inward by 3-5cm, accroding to PCI
non-thermal is about 2keV at 1s.

Next:
200ms He
increase LH to 500kW (from 300kW)
Jul 27 2012 02:13:41:830PM1120727015Syunichi Shiraiwarunaway shut down.
Jul 27 2012 02:24:05:733PM1120727016Syunichi Shiraiwarunaway shut down.
Jul 27 2012 02:37:58:550PM1120727017Syunichi Shiraiwafizzle? dud?
Jul 27 2012 02:51:26:903PM1120727018Syunichi Shiraiwadirupted at 0.3s

Physics Operator Comments
Jul 27 2012 09:51:09:790AM1120727001Greg WallaceChanges: Load seg 1 from yesterday. Import PG3 and PG4 waveforms from seg 1 of 1110207020 (last day with breakdown in H2 and cryo on). Seg 1 on.
Load seg 2 from 1120710020 seg 3 (USN). Change Ip to 800 kA and Bt to 6.3 T. PG2 puff from .2 to .4 s (He3). Seg 2 on.
Load seg 3 from 1120710006 seg 2 (LSN). Change Ip to 800 kA and Bt to 6.3 T. PG2 puff from .2 to .4 s (He3). Seg 3 off.
Load seg 4 from 1120705006 seg 3 (locked mode). Leave as is. Seg 4 off.

Result: Critical failure in init. No power shot. Magnetics and probes errors.

Next shot: Try again for plasma.
Jul 27 2012 10:07:23:603AM1120727002Greg WallaceChanges: Try again for plasma.

Result: Fizzle. Fields look OK. Breakdown at ~5 ms. No CIII light---doesn't burn through?

Next shot: Reduce early PG4 puff from 55 to 50 ms. Took PCS 2m41s to load shot. Try again.
Jul 27 2012 10:23:49:517AM1120727003Greg WallaceChanges: Reduce early PG4 puff from 55 to 50 ms. Took PCS 2m41s to load shot. Try again.

Result: Plasma! Breakdown in H2. Disruption at 0.9 s. Looks like a brick, not from LH. Density very high during ICRF. LH faulting due to poor coupling. No LH camera.

Next shot: Decrease outer gap by 5mm (RCUR from 0.656 to 0.6585) to improve LH coupling.
Jul 27 2012 11:02:13:680AM1120727004Greg WallaceChanges: Decrease outer gap by 5mm (RCUR from 0.656 to 0.6585) to improve LH coupling. Enable Ar puff (0.3-0.375 s).

Result: Fizzle. Late breakdown and higher gas pressure than shot 3. PCS is still loading very slowly.

Next shot: Decrease PG4 pre-puff from 50 to 45 ms.
Jul 27 2012 11:26:42:500AM1120727005Greg WallaceChanges: Decrease PG4 pre-puff from 50 to 45 ms.

Result: Plasma. Less Ip hesitation than shot 3. Disruption at .48 s. PF breaker pulled. Power room access to check fuses.

Next shot: Move He3 puff (PG2) earlier (.1-.3 s instead of .2-.4 s). Reduce PG4 pre-puff from 45 to 40 ms to account for the disruption.
Jul 27 2012 11:43:35:000AM1120727006Greg WallaceChanges: Move He3 puff (PG2) earlier (.1-.3 s instead of .2-.4 s). Reduce PG4 pre-puff from 45 to 40 ms to account for the disruption.

Result: Plasma. Disruption at 0.52 s this time. Earlier He3 puff didn't seem to help much. Still getting injections from GH limiter. Big board not updated with new shot #.

Next shot: Move ICRF pulse to start at 0.6 s and reduce to 2 MW. Reduce He3 puff from 200 to 150 ms.
Jul 27 2012 11:57:10:497AM1120727007Greg WallaceChanges: Move ICRF pulse to start at 0.6 s and reduce to 2 MW. Reduce He3 puff from 200 to 150 ms.

Result: Plasma through rampdown. LH faulting continuously. Looks like very poor coupling again.

Next shot: Increase Ar puff from 75 to 100 ms. Decrease outer gap by 1cm to improve LH coupling (increase RCUR from .6585 to .6635). Increase power from J but not E. Add notches in the E waveform to allow LH Langmuir probe measurements to clear up.
Jul 27 2012 12:09:19:777PM1120727008Greg WallaceChanges: Increase Ar puff from 75 to 100 ms. Decrease outer gap by 1cm to improve LH coupling (increase RCUR from .6585 to .6635). Increase power from J but not E. Add notches in the E waveform to allow LH Langmuir probe measurements to clear up.

Result: Plasma. Disruption at .69 s. Mo, W, Fe cocktail.

Next shot: ICRF power ramp starting at 1MW to determine maximum safe power level.
Jul 27 2012 12:28:47:353PM1120727009Greg WallaceChanges: ICRF power ramp starting at 1MW to determine maximum safe power level.

Result: PF breaker pulled. Disruption at .85 s, but current starts ramping down at .58 s. Power room access to investigate.

Next shot: Decrease proportional gain on nl_04 feedback from 5 to 3 to help stabilize density feedback.
Jul 27 2012 12:43:30:780PM1120727010Greg WallaceChanges: Decrease proportional gain on nl_04 feedback from 5 to 3 to help stabilize density feedback.

Result: Plasma. Early hard x-rays. Mo injection causes disruption.

Next shot: Increase PG4 pre-puff from 40 to 45 ms. ICRF power ramp will be more gradual.
Jul 27 2012 12:54:29:780PM1120727011Greg WallaceChanges: Increase PG4 pre-puff from 40 to 45 ms. ICRF power ramp will be more gradual.

Result: No power shot.

Next shot: Try again.
Jul 27 2012 01:33:17:073PM1120727012Greg WallaceChanges: Increase PG4 pre-puff from 40 to 45 ms. ICRF power ramp will be more gradual.

Result: Plasma through rampdown. No ICRF fired. LH faulted continuously. Reflections not especially high. Power room access to fix ICRF.

Next shot: Increase LH trip levels.
Jul 27 2012 01:50:35:280PM1120727013Greg WallaceChanges: Increase LH trip levels.

Result: Plasma disrupts at 1.25 s.

Next shot: Reduce outer gap by 4 mm to improve LH coupling (increase RCUR from .6635 to .6655). Decrease He3 puff to 100 ms (.1-.2 s).
Jul 27 2012 02:08:47:860PM1120727014Greg WallaceChanges: Reduce outer gap by 4 mm to improve LH coupling (increase RCUR from .6635 to .6655). Decrease He3 puff to 100 ms (.1-.2 s).

Result: LH performed well at 90 deg, not so much at 105.

Next shot: Increase derivative gain on nl_04 from 6 to 8 to improve density control. Increase He3 puff to 200 ms. Increase LH power to 120 kW/klystron, constant 90 deg phasing (~500 kW net).
Jul 27 2012 02:15:59:313PM1120727015Greg WallaceChanges: Increase derivative gain on nl_04 from 6 to 8 to improve density control. Increase He3 puff to 200 ms. Increase LH power to 120 kW/klystron, constant 90 deg phasing (~500 kW net).

Result: Plasma. Runaway shutdown at .11 s, disruption at .17 s.

Next shot: Increase early PG3 puff from 10 to 20 ms (now .01 to .03 s) to reduce runaways.
Jul 27 2012 02:35:24:143PM1120727016Greg WallaceChanges: Increase early PG3 puff from 10 to 20 ms (now .01 to .03 s) to reduce runaways.

Result: Runaway shutdown again. Major fireworks visible on left side of WIDE2. Bounce at .027 s and hards start from there.

Next shot: Change DPCS_XJUMP jumpto time from 1.6 to 1.8 s to improve runaway shutdown. Move PG3 puff earlier and add tail end at 40 V.
Jul 27 2012 02:44:30:457PM1120727017Greg WallaceChanges: Change DPCS_XJUMP jumpto time from 1.6 to 1.8 s to improve runaway shutdown. Move PG3 puff earlier and add tail end at 40 V.

Result: Fizzle. Too much gas?

Next shot: Move end of PG3 seg 1 flattop from -.01 s to -.013 s.
Jul 27 2012 03:05:27:843PM1120727018Greg WallaceChanges: Move end of PG3 seg 1 flattop from -.01 s to -.013 s.

Result: Disruption at 0.3 s. OH resistance warnings on LH1, OH2U, OH2L. Ip starts to roll over at 0.2 s. Breakdown a little late.

Next shot: Try again.
Jul 27 2012 03:25:38:130PM1120727019Greg WallaceChanges: Try again.

Result: Plasma through rampdown. Poor LH coupling during ICRF.

Next shot: Increase LH trip levels. Decrease outer gap by 2 mm more (RCUR from .6655 to .6665).
Jul 27 2012 03:39:12:383PM1120727020Greg WallaceChanges: Increase LH trip levels. Decrease outer gap by 2 mm more (RCUR from .6655 to .6665).

Result: Plasma through rampdown. Clean LH pulse.

Next shot: Turn off ICRF. Increase LH from 140 to 170 kW/klystron. Add ramp from 7e19 to 8e19 on nl_04 between 1.1 and 1.3 s.
Jul 27 2012 03:50:40:750PM1120727021Greg WallaceChanges: Turn off ICRF. Increase LH from 140 to 170 kW/klystron. No DPCS changes.

Result: Disruption at 0.4 s. Startup looks OK, but things go awry at switch to seg 2.

Next shot: Correct Ip and ZCUR jumps at segment switch. Seg 2 now starts at 500 kA and 0.0 m.
Jul 27 2012 04:07:34:490PM1120727022Greg WallaceChanges: Correct Ip and ZCUR jumps at segment switch. Seg 2 now starts at 500 kA and 0.0 m.

Result: Startup OK. Disruption at 0.32 s.

Next shot: Move early RCUR ramp to start at 0.2 s and end at 0.3 s.
Jul 27 2012 04:28:13:680PM1120727023Greg WallaceChanges: Move early RCUR ramp to start at 0.2 s and end at 0.3 s.

Result: Plasma. Clean LH pulse. No ICRF (Ohmic baseline shot).

Next shot: Repeat with ICRF.
Jul 27 2012 04:35:09:933PM1120727024Greg WallaceChanges: Repeat with ICRF.

Result: Fizzle. Late breakdown. Bz0 is is slightly higher as is F-side pressure.

Next shot: Increase nl_04 demand from 7e19 to 7.75e19. Otherwise repeat.
Jul 27 2012 04:43:53:897PM1120727025Greg WallaceChanges: Increase nl_04 demand from 7e19 to 7.75e19. Otherwise repeat.

Result: Fizzle. Pressure still a little high. Current ramp rolls over at 0.15 s. Bz0 still creeping up. Late breakdown again.

Next shot: Make IC_EF4U 15 A more negative. Decrease PG4 pre-puff from 45 to 40 ms. Set nl_04 demand flat at 8e19.
Jul 27 2012 05:06:24:023PM1120727026Greg WallaceChanges: Make IC_EF4U 15 A more negative. Decrease PG4 pre-puff from 45 to 40 ms. Set nl_04 demand flat at 8e19.

Result: Plasma. Disruption at 1.05 s.

Next shot: Increase nl_04 demand from 8e19 to 9e19.
Jul 27 2012 05:05:53:923PM1120727027Greg WallaceChanges: Increase nl_04 demand from 8e19 to 9e19.

Result: Fizzle. Last shot of the day.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:10:13:920AMPlasmaBadNo Powshot. Critical Failure during init
209:51:50:463AMPlasmaOk
310:07:18:350AMPlasmaOk
410:49:00:860AMPlasmaOk
511:06:53:130AMPlasmaOkPFopened after plasma disruption
611:27:00:203AMPlasmaOk
711:41:42:207AMPlasmaOk
811:57:29:963AMPlasmaOk
912:11:46:540PMPlasmaBadEF1L Supply Failed
1012:30:41:080PMPlasmaOk
1201:07:58:027PMPlasmaOk
1301:33:45:413PMPlasmaOk
1401:51:02:217PMPlasmaOk
1502:07:25:727PMPlasmaOk
1602:19:51:553PMPlasmaOk
1702:35:51:320PMPlasmaOk
1802:48:19:667PMPlasmaOk
1903:06:00:727PMPlasmaOk
2003:24:47:150PMPlasmaOk
2103:40:02:707PMPlasmaOk
2203:53:30:587PMPlasmaOk
2304:07:44:153PMPlasmaOk
2404:21:59:257PMPlasmaOk
2504:35:37:827PMPlasmaOk
2604:49:32:200PMPlasmaOk
2705:03:34:160PMPlasmaOk

System Availability
Jul 27 2012 11:42:00:063AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Jun 15 2012 05:02:46:313PM (dekow)Jim IrbyBoronizationdekow,irby
CECEyesThe system is currently operational for Te tilde measurement. Talk to Choongki about the current configuration Jul 3 2012 04:38:00:317PM (nthoward)Anne WhiteCorrelation ECEnthoward,sck83,whitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertoryes Jun 15 2012 05:02:31:550PM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012. New controller installed 5/29/2012Jun 7 2012 10:40:00:957AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH is now available for plasma operation up to ~900 kW net power.Jul 3 2012 02:50:00:693PM (wallaceg)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman-a not functioning. New B-PORT Lyman (BPLY) still being debugged.Jul 12 2012 08:52:28:233AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnoMcPherson under vacuum but is not run on a day-to-day basis. Can be requested if desired. LoWEUS has taken over as the primary Mo monitor.Jul 12 2012 08:53:14:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Jul 10 2012 07:08:06:883PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1120608, the high frequency channels: 112, 140 and the variable, have been disconnected for some troubleshooting. All other channels are connectedJun 14 2012 11:28:59:603AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS is under vacuum and fully available.Jul 3 2012 02:46:59:753PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:09:220AM (jrwalk)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:28:323AM (jrwalk)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke