Alcator C-Mod Run 1120820 Information

Back to runs

Miniproposals
Miniproposal:298a
Date Filed: 5/20/2002
Title:C-Mod Plasma Startup
First Author:Jim Irby
Session Leader:Steve Wolfe (shots 20-30)

Operators
Session leader(s):Steve Wolfe
Physics operator(s):Syunichi Shiraiwa
Engineering operator(s):Bill Cochran,Bill Parkin,Roza Tesfaye

Engineering Operator Run Comment
Reverse Field Power Tests and MP298a? Plasma startup

Session Leader Plans
Entered: Aug 20 2012 08:44:45:560AM
Author: Steve Wolfe
Session Leader plan for Monday, 20-Aug-2012 (afternoon plasma tests)
Engineering setup as on 1110215014, but reduce TF limit to 165kA

MP298a? Plasma startup
The goal of this mini-run is to establish plasma operation in 
reversed field. We will also try to provide a few target plasmas 
for verification of the new HIREX_SR alignment, in preparation for their
half-day run which may happen on Tuesday. Other systems may piggyback. 
The shot is based on a 2011 I-mode which is the reference shot for John
Walk's run scheduled for this Friday, but with the field reduced to 5.3T,
just to minimize magnet cool-down times. 

Gas setup:
----------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
Fill B-side lower with 2 psi neon Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill H-bottom with 1 psi argon hybrid enabled (PG5)
fill NINJA with 10 psi D2 DISABLED 

Load shot from 1110215014 (1MA, nl04=7e19, 5.8T, I-mode shot)
Reduce PG4 in seg1 from 65msec to 20msec (it was a cryopump startup)
Reduce TF_CUR in seg2 from 159733 to 150000. 
Enable argon puff from H-bottom (PG5)
Tune up reverse field startup. Note seg 1 settings from 1110215014
  RCUR=  -3500
  BR_0=  0.000
  IC_EF4=+1290
May also want to tweak PG4 and PG3 in seg1



Physics Operators Plans
Entered: Aug 20 2012 11:11:26:937AM
Author: Syunichi Shiraiwa
-----------------
Engineering Setup
-----------------

Power systems as on:1110215014 (with any change necessary
for reversed field operation)

Acoil: -Dtop +Dbot +Jtop -Jbot (reversed) Hybrid Enabled

Gas setup:

Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 2 psi Ne Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill NINJA with 10 psi D2 DISABLED
fill H-bottom with 1 psi argon hybrid enabled (PG5)

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus/LoWEUS
Leave z-bolo shutter as is (should be open)

Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): no
ICRF(yes/no): no
LH(yes/no): no
Cryopump (yes/no): no
DNB (yes/no): no

Vessel temperature: 35/35/35

-----------------
PO prep. for the 1st shot
-----------------

load 1110215014 (reverse field shot)

recalculate predictor
hit call and apply, when algorithm is FLUXIHH, filament, VACUUM in
seg 2, where coeffs for fluxloops/pickup coils are not zero
reduce PG4 in seg1 from 65msec to 20msec (it was a cryopump startup)
reduce TF_CUR in seg2 from 159733 to 150000.

saved as 1120820003 in /home/shiraiwa/pcs
Entered: Aug 20 2012 02:10:39:203PM
Author: Syunichi Shiraiwa
loaded shot file "1120820003" from /home/shiraiwa/pcs
Entered: Aug 20 2012 02:18:26:187PM
Author: Syunichi Shiraiwa
First attempt to make a plasma
H bottom disabled

Entered: Aug 20 2012 02:20:54:960PM
Author: Syunichi Shiraiwa
First attempt to make a plasma
H bottom disabled

Session Leader Summaries
Entered: Aug 20 2012 05:12:35:003PM
Author: Steve Wolfe
Session leader summary for Monday, 8/20/2012
MP#298a C-Mod startup (in reverse field)
SL: wolfe
PO: Shiraiwa
EO: Tesfaye, Cochran, Parkin

This was a successful restart in reverse field. 
Power tests were completed by 14:15, and we began 
plasma operation with shot#20. All plasmas ran successfully,
no fizzles, no flattop disruptions.
We tweaked the startup a little, not that it mattered much;
we had intermittent bounces, but they didn't hurt anything.
The startup should be good to go. 

HIREX_SR had triggering problems, and did not get the data
they needed to prepare for a run tomorrow. 

The DNB fired into plasma from shot#25 on. MSE reports that the
signal with 5A of DNB current is insufficient. However, Ken Liao
was able to clearly see the beam enhancement on his He signal. 

LH fired into plasma from shot#26 on, getting up to almost 600kA. 
Some hints of non-thermals (xrays, ECE) were observed, although the
density was too high for much of an effect to be expected. 

There may be an issue with the pressure reading on the H-bot plenum. 
It was used for argon puffing today, and argon was coming into the plasma
despite the fact that the plenum pressure was reading -0.5psi on 
shots 24-25. Increasing to a reading of 1.2psi for shot#26 caused 
a noticable increase in the 2pi diode signal, over 500kW. 


Physics Operator Summaries
Entered: Aug 20 2012 05:06:41:680PM
Author: Syunichi Shiraiwa
This is the first run day for reversed field and current.
The machine works well today. Power supply test
finished smoothly and we started plasma operation
little earlier than an control room expectation (after
shot 20).

11 successfull discharges are made (out of 11 attempt).
No computer problme, no power supply problme, and no
fizzle today.

In the last three discharge, we tried to reduce the
density to 0.5, but ne04 did not decrease as requested.


(Note for tomorrow)
pcs program for the last shot has active segment 1
and 2. Seg 3 and seg 4 are zeroed.



Session Leader Comments
Aug 20 2012 04:35:05:937PM1120820020Steve Wolfe
Shot#20:try for plasma
THis shot is based on 1110215014, but with TF=150kA
Program is Ip=1MA, NL04=7e19, LSN
Disable H-bot (argon) for this shot, since Matt and Chi aren't ready yet

Result: plasma full length
Nl04 program was going negative after 1sec, so no gas late
despite falling nl04. 
BTor is 5.39T at 150kA (programmed)
Br_0 is up at +.002, startup a little bouncy. 

Next: Br_0 offset to -.001, raise pg4, 
Extend nl04 program to EOF
Ip program to reach 1MA at .3sec instead of .5sec



Aug 20 2012 04:35:57:283PM1120820021Steve Wolfe
Shot#21: Tweaking:
Br_0 offset to -.001, raise pg4, 
Extend nl04 program to EOF
Ip program to reach 1MA at .3sec instead of .5sec

plasma full length
Still bouncy, 15msec, better current rise though.

Next: try RCUR offset of -3000 in seg1 
(had been set to 0, original shot had -3500, but we've been
using +3000 in normal field). 

Aug 20 2012 04:37:03:057PM1120820023Steve Wolfe
Shot#23:   LBO will inject CaF2 at 1sec, try rcur offset=-3500
plasma full length, got the CaF2 injection
Bounce is smaller, Rposition is smoother

Next: repeat, but enable argon, 50msec from H-bot (at .5psi)


Aug 20 2012 04:37:28:873PM1120820024Steve Wolfe
Shot#24: repeat, but enable argon, 50msec from H-bot (at .5psi)
HIREX_SR is still having trigger problems, but will trigger manually
to see if they're getting anything. 

plasma full length, 
Bounce is back in startup

Next: DNB will fire into C-Mod, Enable He from Bside-Lower for Ken Liao
Tweak EF3_volt at .005 to .012sec in seg1

Aug 20 2012 04:38:00:267PM1120820025Steve Wolfe
Shot#25:  DNB will fire into C-Mod, Enable He from Bside-Lower for Ken Liao
Tweak EF3_volt at .005 to .012sec in seg1

plasma full length. 
No bounce, Got He and argon puffs.

Next: repeat, LH is moving the launcher forward 

Aug 20 2012 04:38:29:463PM1120820026Steve Wolfe
Shot#26: LH will fire .8 to .9 sec
Increasing He puff to 100msec. 
H-bot was reading -0.5psi, although Matt says there is argon in the plasma.
The gas_input scope is seeing .18T-liter, which I think is still high by
a factor of 10. 
Run it up to 1psi reading and see what happens

Disrupted in rampdown, 1.75sec
Bounce is back. I think we got more argon this time, increase on the 
2pi diode. 
He puff shows up as a density increase at 0.8sec, got 1.4T-l this time

Next: reduce helium puff, leave argon for now

Aug 20 2012 04:38:55:420PM1120820027Steve Wolfe
Shot#27:  reduce helium puff, leave argon for now
Decrease outer gap for LH. CaF2 will not be injected. 

Disrupts at 1.78sec, 
No bounce this time, density is flatter, less He, 0.3T-l this time. 
LH still around 220kW. 

Next: LH will increase power and pulse length

Aug 20 2012 04:39:24:320PM1120820028Steve Wolfe
Shot#28:  LH will increase power and pulse length
Reduce density to 6e19 (per MSE request)

plasma full length
Some enhancement of hard-xrays and ECE during LH
LH is close to 400kW. Density comes up a little during LH.

Next: decrease PG3 in seg1 to try to reduce ininital density

Aug 20 2012 04:54:37:953PM1120820029Steve Wolfe
Shot#29:  decrease PG3 in seg1 to try to reduce ininital density
plasma full length, some injections,
LH gets to 600kW, but faults. 
Density seems similar. 

Next: repeat


Aug 20 2012 05:00:11:893PM1120820030Steve Wolfe
Shot#30: repeat

plasma full length
Bounce is back. 
LH has small effect on ECE, had some faulting at 550kW

End of Run


Physics Operator Comments
Aug 20 2012 11:41:46:607AM1120820001Syunichi ShiraiwaRS operation.

Power supply test
Aug 20 2012 11:59:59:257AM1120820002Syunichi ShiraiwaData system test
Aug 20 2012 03:57:14:397PM1120820020Syunichi ShiraiwaFirst attempt to get a plasma

Next:
set ne requeest to be constant ne = 0.7 until
set Ip program to 1MA at 0.3s
increased prepuff to 22ms (from 20ms)
set Br_0 offset to -0.001
Aug 20 2012 03:56:12:520PM1120820021Syunichi ShiraiwaGot a plasma,
Ip ramp-up became smooth.
Density is not still smooth yet

Next:
set RCUR offset to -3000. in seg 1
adjusted density PID parameter (set d=6, p=5)
Aug 20 2012 03:55:27:833PM1120820022Syunichi ShiraiwaIp ramp-up faster than 21.
density trace became flatter

Next:
set RCUR offset in seg 1 to -3500
Aug 20 2012 03:55:09:757PM1120820023Syunichi ShiraiwaStart up looks better

Next:
repeat the same seg 1 to see if it reproduces
enable H-bot (Ar). set the puff to 50 ms.
Aug 20 2012 03:33:52:840PM1120820024Syunichi ShiraiwaBounced during the start-up as shot 22

Next:
enalbe b-side lower and set puff to 30ms
adjuset EF3 voltage in seg 1
Aug 20 2012 03:51:49:617PM1120820025Syunichi ShiraiwaNo bounce during start-up

Next:
increase He to 100ms (from 0.8s)
LH will be on..
Aug 20 2012 04:06:23:133PM1120820026Syunichi ShiraiwaBounced again
Got LH from 0.8 to 0.9s

Next:
Reduce He to 30ms
Increase Rcur by 2mm (for LH coupling)

Aug 20 2012 04:20:40:910PM1120820027Syunichi ShiraiwaDisrupted during the ramp-down
LH shows lower reflection.

Next:
reduce ne to 0.6e20
increase RCUR by 2mm
Aug 20 2012 04:47:30:340PM1120820028Syunichi ShiraiwaSmooth start-up (no bounce)
LH couples better (25% reflection) and indications of non-thermal
Density did not decrease as requested

Next:
reduce pg3 in seg1 to reduce ne during the ramp-up

Engineering Operator Comments
ShotTimeTypeStatusComment
211:52:57:033AMTestOkData System Test
311:59:13:940AMTestOkEFC Test
412:26:13:720PMTestOkEF2U PLC Test
512:32:14:333PMTestOkEF2L PLC test
612:38:26:413PMTestOkA_Coil Test
712:44:25:017PMTestBadNo EF3 Voltage Limit Reset to 3kV next shot
812:50:44:590PMTestOkEF3 PLC Test
912:57:21:287PMTestOkEF4 Forward Bridge PLC Test
1001:03:12:583PMTestOkEF1U Forward Bridge PLC Test
1101:09:37:957PMTestOkEF1L Forward Bridge PLC Test
1201:16:14:073PMTestOk OH1 Forward Bridge PLC Test
1301:22:09:843PMTestOkOH2U Forward Bridge PLC Test
1401:28:47:680PMTestOkOH2L Forward Bridge PLC Test
1501:35:01:997PMTestOkEF1U & EF1L Commutation Test
1601:41:07:870PMTestOkOH Commutation Test
1701:47:34:777PMTestOkTF 50kA PLC Test
1802:01:34:143PMTestOkTF 100kA PLC Test
1902:13:54:627PMTestOkTF 150kA PLC Test
2002:26:28:813PMPlasmaOkPlasma
2102:40:56:913PMPlasmaOkPlasma
2202:56:13:080PMPlasmaOkPlasma
2303:08:47:370PMPlasmaOk
2403:23:13:330PMPlasmaOk
2503:35:57:353PMPlasmaOk
2603:55:05:313PMPlasmaOk
2704:09:21:363PMPlasmaOk
2804:24:37:703PMPlasmaOk
2904:39:50:220PMPlasmaOk
3004:56:14:957PMPlasmaOk

System Availability
Aug 20 2012 11:52:33:470AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Jun 15 2012 05:02:46:313PM (dekow)Jim IrbyBoronizationdekow,irby
CECEyesThe system is currently operational for Te tilde measurement. Talk to Choongki about the current configuration Jul 3 2012 04:38:00:317PM (nthoward)Anne WhiteCorrelation ECEnthoward,sck83,whitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertoryes Jun 15 2012 05:02:31:550PM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012. New controller installed 5/29/2012Jun 7 2012 10:40:00:957AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH is now available for plasma operation up to ~900 kW net power.Jul 3 2012 02:50:00:693PM (wallaceg)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman-a not functioning. New B-PORT Lyman (BPLY) still being debugged.Jul 12 2012 08:52:28:233AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnoMcPherson under vacuum but is not run on a day-to-day basis. Can be requested if desired. LoWEUS has taken over as the primary Mo monitor.Jul 12 2012 08:53:14:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Jul 10 2012 07:08:06:883PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1120608, the high frequency channels: 112, 140 and the variable, have been disconnected for some troubleshooting. All other channels are connectedJun 14 2012 11:28:59:603AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS is under vacuum and fully available.Jul 3 2012 02:46:59:753PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:09:220AM (jrwalk)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:28:323AM (jrwalk)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke