Alcator C-Mod Run 1120821 Information

Back to runs

Miniproposals
Miniproposal:605
Date Filed: 6/10/2010
Title:LH2 lower hybrid launcher checkout and conditioning
First Author:Greg Wallace
Session Leader:Greg Wallace (shots 1-16)
Miniproposal:662
Date Filed: 8/9/2011
Title:HiReX Sr startup MP
First Author:Yuri Podpaly
Session Leader:Matt Reinke (shots 17-32)

Operators
Session leader(s):Greg Wallace,Matt Reinke
Physics operator(s):Ian Hutchinson
Engineering operator(s):Bill Cochran,Bill Parkin,Gary Dekow

Engineering Operator Run Comment
MP605: LH2 lower hybrid launcher checkout and conditioning

Session Leader Plans
Entered: Aug 20 2012 05:15:53:423PM
Author: Greg Wallace
Session leader plan for 1120821
PO: I. Hutchinson
SL: G. Wallace
MP605: LH2 lower hybrid launcher checkout and conditioning

Start from shot 1120820030.

1) Reduce Ip to 800 kA and nebar to 7e19 during flattop. Re-establish LH operation from 1120820. (120 kW/klystron, 90 deg CCD phasing, 0.8-1.0 s). Adjust plasma shape and CPS trip levels as necessary.

2) Increase LH power and pulse length.
Entered: Aug 21 2012 11:40:15:003AM
Author: Matt Reinke
MP 662 - HIREXSR Startup

We've change HIREXSR to view H-like Ar across the entire plasma cross-section and H-like Ca in the core. This requires some run-time to re-align and focus the instrument using repeatable plasma shots. For the standard configuration Ohmic plasma have been used, but his layout is geared toward high Te so an ICRF-heated L-mode will be used.

GOALS: run-repeated L-mode plasmas and do focusing and masking tests. If time remains, demonstate the instrument in a high (Te ~ 6 keV) I-mode plasma.

1) Load 1120820025 and raise Ip to 1.1 MA, keep nl04 ~ 0.7. Add 3 MW of ICRF power from 0.7-1.35. Adjust strike points if necessary and add Ne to ensure good divertor compatibility. Demonstrate repeatability (3-4 shots)

2) Do a 5-point focus scan (x3 mod 34,000 < 60,0000), (x1 mod 0 < 36,000)

3) Place system at minimum of Ti and do masking tests
a) left, right, medium small(x3)
b) left, right, up, down (x1)

4) Develop higher Ip locked mode (try for 1.1 MA, lower to 1.0 if can't get it)

5) I-mode test plasmas to demonstrate new HIREXSR capabilities and develop divertor strategy for rev. B.

Physics Operators Plans

Session Leader Summaries
Entered: Aug 21 2012 04:22:18:780PM
Author: Greg Wallace
SL Summary for 1120821(am)
MP 605 LH2 Lower Hybrid Launcher Checkout and Conditioning

SL: G. Wallace
PO: I. Hutchinson

The purpose of today's run was to verify proper modification of the LH2 lower hybrid launcher for operation in reverse field direction. The phase shims used in the jungle gym for forward field phasing were removed and replaced with new shims specifically cut for operation in reverse field. There exists no full calibration of the launcher with the reverse field shims installed, so it was important to verify that the calculations used to determine the phase shim lengths are correct. A fully non-inductive discharge would allow for a simple measure of the efficiency figure of merit, n*I*R/P, to prove definitively that the phasing is correct.

Shots 1-16 were dedicated to bringing up the LH power and extending pulse length. The early discharges were at very high density despite little or no puffing outside of segment 1. As this density continued to drop, the amount of current drive increased steadily. The density rose significantly during the earlier LH pulses, which may be due to increased outgassing from low numbered waveguide columns. (In normal field direction the waves travel across the launcher towards higher numbered columns, while in reverse field the waves travel the opposite direction. The electric fields at the low number columns will increase in reverse field, which may increase outgassing at first.)

Significant current drive was achieved at 5.4 T and 800 kA with net powers between 600 and 800 kA. The loop voltage transiently crossed 0 several times, but did not remain there as the density climbed during the LH pulse. After switching to 600 kA we sustained a loop voltage of only 0.15 V (0.8 V Ohmic) for the duration of the LH pulse. An upper bound on the current drive efficiency is ~2.5e19 AW^-1m^-2, which agrees with the efficiency found in normal field configuration.

tl;dr:
The switch over to reverse field operation is a success and the LH system is ready for physics operation.
Entered: Aug 21 2012 05:26:43:963PM
Author: Matt Reinke
We were able to effectively use the 1/2 run day to focus both the H-like Ar and H-like Ca systems and do x2 vignetting tests of H-like Ar. Will process that data and make changes before Friday if necessary. I'm not worried about the H-like Ca since the emission is more core localized.

We lost ~40 minutes to TORVAC power problems which prevented us from getting to the locked mode development. First I-mode physics run that needs HIREXSR may need to lose ~3 shots to make sure the locked mode is working.

Much work is needed to covert THACO over to using this new alignment and get good shot-to-shot feedback for session leaders for the coming weeks.

Also, we did some target discharge development and have a good starting point for I-modes. The heat flux is up on the 2nd tile on the inner divertor and spread over the outer divertor and has low/medium Ne seeding. If we hadn't lost time to the TORVAC problems we would have increased power and seeding.

Physics Operator Summaries
Entered: Aug 21 2012 05:13:01:780PM
Author: Ian Hutchinson
Summary
-------

Most of the two purposes of the run were achieved. A problem
with power to the vacuum gauges lost about an hour at the end.

Physop Observations
__________________

Startup was generally satisfactory but fizzles were obtained after a
1.1MA disruption. The current ramp was adjusted to obtain fairly early
diversions (~.15s vs .25s in the original version of this shot).
Various segment switch matching adjustments were made to reduce
perturbations. Shot 31 would be a good place to start for loading and
developing additional shots. ICEF4 might need to be lowered by maybe
20A. Then Ip, nl04, or rcur tweaks on that are probably preferable to
choosing an earlier shot and trying to redo the segment switch
matching. A locked mode shot (segment 3) was attempted in shot 32 but
disupted from radiative death apparently because of Ar overdose,
150ms. Probably 50ms (PG5) is nearer the right amount.

The density eventually became well controlled at a low level during the
LH experiments. How much of this was early diversion versus simply
purging the walls is unclear.


Scorecard
---------
  Shot,Duration(s),Ipmax(MA),Result  Shot,Duration(s),Ipmax,Result
  |    1   No Ip                   |   02   1.950   0.810   Plasma  |
  |   03   1.950   0.813   Plasma  |   04   1.961   0.822   Plasma  |
  |   05   1.966   0.827   Plasma  |   06   1.969   0.827   Plasma  |
  |   07   1.971   0.840   Plasma  |   08   1.970   0.841   Plasma  |
  |   09   1.971   0.840   Plasma  |   10   0.000   0.048   Fizzle  |
  |   11   1.970   0.838   Plasma  |   12   1.969   0.839   Plasma  |
  |   13   1.971   0.700   Plasma  |   14   1.969   0.700   Plasma  |
  |   15   1.970   0.685   Plasma  |   16   1.972   0.698   Plasma  |
  |   17   1.723   1.123   Plasma  |   18   1.809   1.113   Plasma  |
  |   19   1.036   1.209   Plasma  |   20   0.000   0.049   Fizzle  |
  |   21   0.000   0.046   Fizzle  |   22   1.878   1.113   Plasma  |
  |   23   1.812   1.112   Plasma  |   24   1.813   1.110   Plasma  |
  |   25   1.819   1.112   Plasma  |   26   1.806   1.111   Plasma  |
  |   27   1.811   1.111   Plasma  |   28   1.800   1.111   Plasma  |
  |   29   1.800   1.111   Plasma  |   30   1.818   1.111   Plasma  |
  |   31   1.796   1.111   Plasma  |   32   0.475   0.826   Plasma  |
 
Date 1120821:  32 shots.  28 plasmas.   3 fizzles.   0 duds.   1 System Error.
Total plasma duration: 50.73 s (exceeding  100 kA)



Session Leader Comments
Aug 21 2012 09:20:59:537AM1120821001Greg WallaceLH at 120 kW/klystron, 90 deg CCD phasing. Fired at t=0, not t=0.8-1.0. Density much higher than requested. Next shot will have correct timing of LH pulse.
Aug 21 2012 09:38:07:967AM1120821003Greg WallaceOne fault during LH pulse at 120 kW/klystron, 90 deg CCD phasing, ~500 kW net. Looks like it might be breakdown on the plasma side (spike on refco on many columns at same time). Next shot will increase pulse length to 0.7-1.2 s at same power level of 120 kW/klystron, 90 deg CCD phasing. Also keep trying to decrease density.
Aug 21 2012 09:48:21:477AM1120821004Greg WallaceClean LH pulse at 120 kW/klystron, 90 deg CCD phasing, ~500 kW net. Density still quite high, nebar ~ 1.25e20. Next shot will increase LH power to 150 kW/klystron and try to decrease density again.
Aug 21 2012 10:03:42:270AM1120821005Greg WallaceMany LH faults due to high reflections. Line averaged density finally came down which also reduced LH probe density.

Next shot will decrease outer gap by 4 mm to improve LH coupling. Also move launcher in from 1279 to 1278.
Aug 21 2012 10:23:06:033AM1120821006Greg WallaceOne LH fault at 150 kW/klystron, 90 deg CCD, ~625 kW net. Looks like it could be breakdown in col 3. Nothing obvious on the LH camera. Launcher seems to have crept in to 1277. Will move back slightly to 1278. Next shot will repeat at this power level.
Aug 21 2012 10:32:03:363AM1120821007Greg WallaceOne fault in LH pulse at 150 kW/klystron, 90 deg CCD phasing, ~625 kW net power. Fault occurs at 0.97 s, can be seen on frame 29 of LH camera. Looks like breakdown on plasma side C-row. Will stay at this power level to see if it clears.
Aug 21 2012 10:47:15:723AM1120821008Greg WallaceClean LH pulse at 150 kW/klystron, 90 deg CCD phasing, ~625 kW net. Strong current drive early in LH pulse, but density rises during pulse from 4e19 to 8e19. About 50% loop voltage reduction by the end of the pulse. Next shot will go up to 170 kW/klystron and hope density doesn't rise so much.
Aug 21 2012 11:13:28:570AM1120821009Greg WallaceOne fault near end of the LH pulse at 170 kW/klystron, 90 deg CCD phasing, ~725 kW net power. Nothing obvious on LH camera but clearly plasma side breakdown looking at the reflected power signals. Next shot will repeat with this power to see if it clears up. Clear signs of current drive in this discharge.
Aug 21 2012 11:17:04:010AM1120821010Greg WallaceFizzle.
Aug 21 2012 11:33:04:397AM1120821011Greg WallaceMany faults. Density too low at edge (nebar < 4e19!!!) for coupling. Next shot will increase line averaged density which should improve coupling.
Aug 21 2012 11:49:31:007AM1120821012Greg WallaceTwo faults, looks like an arc on col 2? Will stay at this power level for now. Next shot will decrease to 600 kA.
Aug 21 2012 12:03:11:137PM1120821013Greg WallaceMany faults due to breakdown on the plasma side at 170 kW/klystron, 90 deg CCD phasing, 800 kW net power. Next shot will reduce to 150 kW/klystron to see if things improve.
Aug 21 2012 12:16:47:650PM1120821014Greg WallaceMore faulting at 150 kW/klystron, 90 deg CCD phasing. Seems to not really like the 600 kA discharge. Could be "broader" SOL profiles at the lower current? Next shot will increase outer gap by 3mm (reduce heat flux on launcher) and move timing to 0.8-1.3 s (avoid crossover in early part of LH pulse).
Aug 21 2012 12:29:39:787PM1120821015Greg WallaceSeveral faults at 150 kW/klystron, 90 deg CCD. Still breaking down on the plasma side. Better than shot 14---bigger gap seemed to help. Next shot will increase outer gap by another 3mm.
Aug 21 2012 12:40:01:420PM1120821016Greg WallaceMuch better with the larger outer gap. Only two faults. Still looks like breakdown on plasma side, maybe col 2 or 3? 150 kW/klystron, 90 deg CCD phasing, ~725 kW net. Sustained Vloop near 0.15 V. Last shot of the day for MP 605.
Aug 21 2012 01:06:31:070PM1120821017Matt ReinkeTransitioning over the MP 662 - HIREXSR Calibration.

First goal is to setup a repeatable ICRF-heated L-mode plasma for use in diagnostic configuration changes.

LSN, Ip=1.1, nl04~0.7, ICRF at 3 MW from 0.7-1.35 seconds. Adding Ne puffing for heat flux managment, increasing Ar.

RESULT: decent target plasma, but got two big Mo injections and ICRF-induced density rise.

NEXT: adjust the strike points, move inner strike higher to avoid heat flux on the corner, move Ne puffing earlier
Aug 21 2012 01:21:31:303PM1120821018Matt Reinkerepeat of target with tweaked shaping and gasing

RESULT: got rid of injections, moved inner footprint up a tile but outboard footprint is riding high. Lots of outgassing from ICRF

NEXT: RXL change, repeat, trying to get the density control
Aug 21 2012 01:35:00:870PM1120821019Matt Reinkeconverging on good target shot for calibration

RESULT: killer Mo injection after 1.0 seconds

NEXT: reduce ICRF to 2.5 MW and increase Ne to 45%
Aug 21 2012 01:39:19:357PM1120821020Matt ReinkeRESULT: post-disruption fizzle

NEXT: repeat


Aug 21 2012 02:15:44:927PM1120821022Matt ReinkeRESULT: Excellent target shot. Perhaps the disruption helped to outgas the walls? Getting better nl04 control. This makes a good 1st shot in the focusing scan.

NEXT: 2nd point in focus scan (see HIREX entries)
Aug 21 2012 02:42:45:503PM1120821023Matt Reinke2nd focal point

RESULT: good plasam, density a little higher

NEXT: adjust HIREXSR for 3rd focal point
Aug 21 2012 02:41:58:863PM1120821024Matt Reinke3rd focus data point

RESULT: HIREXSR did not trigger, ran test shots afterwards and it worked OK

NEXT: Repeat 3rd focal point
Aug 21 2012 02:53:02:970PM1120821025Matt Reinketrying for 3rd data point again

RESULT: got the 3rd focal point

NEXT: repeat at 4th focal point
Aug 21 2012 03:04:53:923PM1120821026Matt Reinkerepeat target at 4th focal point

RESULT: good Ar 4th point, but bad LBO. Mark fixing the shot

NEXT: the x4 points are good enough to get the Ar focus, so we'll set Ar to best focus and get the 4th focal point for LBO
Aug 21 2012 03:29:12:960PM1120821027Matt ReinkeH-like Ar at best focus

RESULT: excellent repeat

NEXT: start H-like Ar masking test, try for 4th H-like Ca focal point
Aug 21 2012 03:40:34:940PM1120821028Matt Reinkefirst H-like Ar mask point, 4th H-like Ca focal point

RESULT: excellent shot

NEXT: get A-SIDE mask of H-like Ar and repeat of 3rd H-like Ca focus
Aug 21 2012 03:50:58:337PM1120821029Matt ReinkeRESULT: good repeat

NEXT: might be a few minutes, something wrong with TORVAC
Aug 21 2012 04:42:16:960PM1120821030Matt ReinkeRESULT: managed to repeat L-mode target after long wait

NEXT: Flipped H-like mask, last H-like Ca focal point
Aug 21 2012 04:59:28:327PM1120821031Matt Reinkelast L-mode target shot

RESULT: good repeat of target, but the H-like Ca got bumped so didn't get the focal point

NEXT: attempt at locked mode
Aug 21 2012 05:12:17:057PM1120821032Matt Reinkelocked mode target with seeding out of H-BOT.

RESULT: way too much Ar, throughput similar for forward field shot, good to know for future use. Looking at 1120210004 (forward), a 150 ms from H-BOT was used while on 1110317006 (rev.) H-BOT was at 50 ms.

NEXT: end of run

Physics Operator Comments
Aug 21 2012 09:00:18:853AMIan HutchinsonSet H-bottom PG5 Ar puff to 40ms.
Set Ip to 0.8MA.
nl04 is already at .6e20. Decrease proportional gain to 3 from 5.
Load.
I'm told that its nebar of .6 they want. Set nl04 to .35e20.
Load.
Aug 21 2012 09:24:42:480AM1120821001Ian HutchinsonNo power shot because of hang
Aug 21 2012 09:28:28:610AM1120821002Ian HutchinsonPlasma to rampdown. nl04 way too high because of big segment 1 puff.

Cut off seg1 puff at 30ms.
Load.
Aug 21 2012 09:48:11:140AM1120821003Ian HutchinsonPlasma to rampdown. Still too much density though no puff throughout shot.

Shorten pre-puff to end at 15ms.
Load.
Aug 21 2012 09:55:15:107AM1120821004Ian HutchinsonPlasma. Density still high and trickling up.

Try for earlier diversion. Move clearin ramp, rcur ramp, to end at .2s.
ICEF4 to +1300A from +1290A.
Load.
Aug 21 2012 10:21:51:410AM1120821005Ian HutchinsonPlasma. Lower density

Move the clearin/rcur ramp to end earlier.
Match zcur at segment switch.
Move rcur out 2mm to .663m
Load.
Aug 21 2012 10:26:55:560AM1120821006Ian HutchinsonPlasma.

Raise zxl during 0.1-0.25s
Set fill puff to 25ms from 23ms.
Load.
Aug 21 2012 10:47:22:187AM1120821007Ian HutchinsonPlasma.

zxl raised from -.01 to -.005 during flat top.
also raised to +.03 at .1s and gain step moved to .14s.
Load.
Aug 21 2012 10:59:11:883AM1120821008Ian HutchinsonPlasma. Density gets down to nl04=.28 and gas puff comes on.

EF1Vs negative ramp begun at .16s instead of step at .2s.
Load.
Aug 21 2012 11:15:09:290AM1120821009Ian HutchinsonPlasma.

EF1V adjustments did not do what I wanted.
The only other big jump at .2s is EF4V. Maybe that's it.
Program EF1Vs positive from .15s.
Make EF4V ramp down starting .2s.
Load.
Draw nl04 at .3e20
Aug 21 2012 11:31:07:080AM1120821010Ian HutchinsonFizzle. Bounce and vertical problem.

ICEF4 to +1310A.
Aug 21 2012 11:49:03:097AM1120821011Ian HutchinsonPlasma. Density too low.

nl04 to .38e20
Discover it's the EF1 crowbar at .2s.
Move crowbar to .17s. Remove EF1V ramp.
Load.
Aug 21 2012 12:02:49:660PM1120821012Ian HutchinsonPlasma.

ICEF4 to +1320A.
Ip to 0.6MA
EF1 crowbar to .15s
Load.
Aug 21 2012 12:15:56:280PM1120821013Ian HutchinsonPlasma. Repetitive LH trips.

EF1 crowbar to .125s.
Load.
Aug 21 2012 12:25:25:890PM1120821014Ian HutchinsonPlasma. Similar trips. Good early diversion.

Rcur moved in 1.5mm to .6615m.
Rxl moved out during .1-.25s.
Aug 21 2012 12:39:22:337PM1120821015Ian HutchinsonPlasma.

EF1 crowbar to .12s.
Rcur to .66m (1.5mm more).
Load.
Aug 21 2012 12:53:49:167PM1120821016Ian HutchinsonPlasma.

Ip to 1.1MA.
nl04 to .7e20
PG5 H-bottom puff to 60ms.
PG1 Puff (Ne) 40V from .5 to .7s.
Load.
Aug 21 2012 01:14:04:250PM1120821017Ian HutchinsonPlasma. Disrupts at .6MA in ramp down.

Reduce the clearin ramp rate a factor of 3 in rampdown.

zxl to +.01 from -.005m. rxl lowered 3mm.
PG1 earlier .45 to .65
Load.
Aug 21 2012 01:25:31:510PM1120821018Ian HutchinsonPlasma. Ramps down further but encounters vertical instability.

Greatly reduce the rcur inwards motion in rampdown.
Move rxl in 5mm.
Raise zcur to 0 from -.009.
Ramp Rcur out more quickly at .17s. More slowly at .1
Load.

Aug 21 2012 01:37:43:720PM1120821019Ian HutchinsonPlasma disrupts at 1.03s. A brick. Arc seen on the cameras.

Halve clearin at .1 to -.015 from -.03 because the elongation is being
transiently forced down at segment switch.
Ne puff to 45V.
Aug 21 2012 01:54:52:733PM1120821020Ian HutchinsonFizzle.

Clearin to -.002 at .16s.
ICEF4 to +1330A.
Load.
Aug 21 2012 02:04:46:863PM1120821021Ian HutchinsonFizzle.

ICEF4 to +1340A
Load.
Aug 21 2012 02:17:17:563PM1120821022Ian HutchinsonPlasma to rampdown.

Lower Ip demand at .1s from 600 to 500kA closer to what we actually get.
Aug 21 2012 02:41:15:213PM1120821023Ian HutchinsonPlasma to rampdown.
Substantially reduced the OH2 thrash at segment switch

Remove later rcur inward motion in ramp-down.
Clearin to -.015 at .1s
OH1V more gradually to zero after 1.8s.

Aug 21 2012 02:42:59:217PM1120821024Ian HutchinsonPlasma.

Lower rcur gain to 6 at seg switch.
Aug 21 2012 03:17:26:057PM1120821026Ian HutchinsonPlasma.

Rcur in segment 1 to .657 at .1s. This is further out than the corresponding
point in segment 2 (.65) but the offset is much different -3500 in seg 1.
Aug 21 2012 03:35:08:690PM1120821027Ian HutchinsonPlasma. This shot shows the voltage step on OH1/2 at .1s was due to Rcur
mismatch across the segment switch caused by the offset in segment 1.
This now kludged as fixed by the mismatch in Rcur demand.

Tweaked the .1-.2s period for improved vertical stability.
Load.
Aug 21 2012 04:17:57:840PM1120821028Ian HutchinsonPlasma. No really stability improvement.
Aug 21 2012 04:35:34:233PM1120821029Ian HutchinsonPlasma. Followed by a vacuum problem.

Copy seg 2 to seg 3.
Seg 3 changes: Ip to .8MA. nl05 to .5 then negative at 0.7s.
Zero wire 9 b21proj. Set Acoil current (in all Vs) to 4000 .5-1.6s.
Aug 21 2012 04:55:03:237PM1120821030Ian HutchinsonPlasma.

Tweak clearin at .16s. Load.

Aug 21 2012 05:02:47:607PM1120821031Ian HutchinsonPlasma.

Locked mode shot.
Turn off seg 2. Turn on seg 3.
Disable valves: B-side lower
PG5 puff 100 from .3 to .45s. Loads of Argon.
Aug 21 2012 05:06:03:547PM1120821032Ian HutchinsonPlasma. Disrupts at .47s. Seems to be a radiative death. Probably due to Argon
excess.

Engineering Operator Comments
ShotTimeTypeStatusComment
209:13:51:663AMPlasmaOk
309:26:23:777AMPlasmaOk
409:39:52:087AMPlasmaOk
509:53:08:470AMPlasmaOk
610:10:50:887AMPlasmaOk
710:24:40:070AMPlasmaOk
810:39:16:273AMPlasmaOk
910:52:55:153AMPlasmaOk
1011:12:35:743AMPlasmaOk
1111:25:34:433AMPlasmaOk
1211:40:27:497AMPlasmaOk
1311:54:42:497AMPlasmaOk
1412:08:00:487PMPlasmaOk
1512:21:32:390PMPlasmaOk
1612:34:49:217PMPlasmaOk
1712:51:22:983PMPlasmaOk
1801:07:11:837PMPlasmaOk
1901:23:13:137PMPlasmaOk
2001:36:45:980PMPlasmaOk
2101:49:47:533PMPlasmaOk
2202:02:13:563PMPlasmaOk
2302:15:19:393PMPlasmaOk
2402:28:48:250PMPlasmaOk
2502:41:53:123PMPlasmaOk
2602:55:35:923PMPlasmaOk
2703:13:16:767PMPlasmaOk
2803:28:43:983PMPlasmaOk
2903:41:16:837PMPlasmaOk
3004:32:04:440PMPlasmaOk
3104:44:46:697PMPlasmaOk
3204:59:26:770PMPlasmaOk

System Availability
Aug 21 2012 08:57:30:530AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Jun 15 2012 05:02:46:313PM (dekow)Jim IrbyBoronizationdekow,irby
CECEyesThe system is currently operational for Te tilde measurement. Talk to Choongki about the current configuration Jul 3 2012 04:38:00:317PM (nthoward)Anne WhiteCorrelation ECEnthoward,sck83,whitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertoryes Jun 15 2012 05:02:31:550PM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012. New controller installed 5/29/2012Jun 7 2012 10:40:00:957AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH is now available for plasma operation up to ~900 kW net power.Jul 3 2012 02:50:00:693PM (wallaceg)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman-a not functioning. New B-PORT Lyman (BPLY) still being debugged.Jul 12 2012 08:52:28:233AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnoMcPherson under vacuum but is not run on a day-to-day basis. Can be requested if desired. LoWEUS has taken over as the primary Mo monitor.Jul 12 2012 08:53:14:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Jul 10 2012 07:08:06:883PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1120608, the high frequency channels: 112, 140 and the variable, have been disconnected for some troubleshooting. All other channels are connectedJun 14 2012 11:28:59:603AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS is under vacuum and fully available.Jul 3 2012 02:46:59:753PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:09:220AM (jrwalk)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:28:323AM (jrwalk)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke