Alcator C-Mod Run 1120912 Information

Back to runs

Miniproposals
Miniproposal:705
Date Filed: 6/6/2012
Title:Current profile measurements in plasmas with strong Lower Hybrid current drive
First Author:Bob Mumgaard
Session Leader:Bob Mumgaard (shots 1-28)

Operators
Session leader(s):Bob Mumgaard
Physics operator(s):Jim Irby
Engineering operator(s):Andy Pfeiffer,Gary Dekow,Ed Fitzgerald

Engineering Operator Run Comment
MP 694 in the morning. SL: Liao MP 705 in the afternoon. SL: Mumgaard PO

Session Leader Plans
Entered: Sep 11 2012 09:49:04:933AM
Author: Ken Liao
MP 694 Transport of helium impurity in L-mode, H-mode, and I-mode

Required systems: DNB, Thomson, ICRF, cryopump, reflectometer

*RUN BEGINS AT 8:00AM*

This is a continuation of MP 694 from run 1120822. During that run, we weren't able to obtain steady I-mode due to uncontrollable density rise during ICRF and a lengthy boronization recovery, so we are trying again without boronization, using a configuration for steady I-modes with nebar ~1.2*10^20 taken from Hubbard's run 1120829. Also, we'll take some ohmic shots for comparison to the previous data.

ECDC in D

Fill H-bottom with 10 psi He4 Hybrid ENABLED (PG5)

Shot plan:
Run is at 5.8T

1. Load shot 1120907026, nl04 0.8. But use constant 2.4MW ICRF power from 0.6s - 1.4s.
Puff 30ms He4 at 0.9s.
DNB timing: 60/20, starting at 0.500 seconds, 14 beam pulses, at 46.5 keV, highest safe current.

Once we get a good I-mode shot, repeat 4 times for statistics, using different beam start times.

2. Switch back to I-mode, change ICRF power.
a. ICRF to 3.5MW power from 0.6s - 1.4s.
b. ICRF to 3.0MW power from 0.6s - 1.4s.
c. ICRF to 2.0MW power from 0.6s - 1.4s.
d. ICRF to 1.0MW power from 0.6s - 1.4s. (expect out of I-mode)

3. Switch to ohmic shots. Same plasma shape. nl04 0.8. Take 4 shots with beam.

Entered: Sep 11 2012 04:46:52:307PM
Author: Bob Mumgaard
Today we will continue (and finish if things go agreeably) running MP705 which was run for the second half of 1120606 (shots 11-24) and the first half of 1120612 (shots 1-15) previously, completing parts a and c. We will be running over the second half of the runday which will go from 8am until 6pm. We will take over at noon.

MP 705: Current profile measurements in plasmas with Strong LHCD
SL: Mumgaard
PO: Irby

This will be for part b of the MP, a shot-to-shot scan in the LH launched phase at constant power, current and density, attempting to get two good shots at each of 4 phases. The later part of the run will then attempt to do a phase scan within a LH pulse with a long LH pulse to show the dynamic phase change results in the same current profile as the static phase. These shots will then be compared to models to determine if the current profile is consistent. We will finish the run with a MSE calibration plasma sweep. (PO note: This will take some programing to change)

==============REQUIRED SUBSYSTEMS=================
LH (will not run without)
DNB (will not run without)
no Cryopump, no ICRF
Overnight ECDC in D.
No boronization

============Required Diagnostics==================
Pitch angle profiles: MSE-DNB with ISC enabled, no BPC, (Mumgaard/Scott)
Te and ne profiles: ECE, GPC setup to look at non-thermals, Thomson, TCI (Hubbard, Hubbard, Walk/Hughes, Irby)
Impurity density profiles: X-tomo (Granetz/Faust)

============Desired Diagnostics==================
Faraday rotation : Polarimeter ( Xu/Bergerson )
Ti profiles: Hirex Sr ( V not required, locked-mode not in plan) (Gao/Reinke)
Edge density near LH: Reflectometer: C-middle horn (Lau)
LH related diagnostics: Hard X-ray camera, Lyman-alpha array (Faust, Faust)

============Gas setup==================
Working gas species: D2
B-side lower: 1.0 psi Ar (enabled) NOTE THE CHANGE FROM RECENT OPERATION
H-Bottom: 10.0 psi He (enabled) Ken Liao will do the timing
Ninja: 10.0 psi D2 (C-port plenum for puffing in front of LH launcher)


================ Shot Plan ===============================================
Check MSE data and Beam data between shots, repeat if necessary.

Prior to taking over the run we would like to fire LH 40ms after the last beam pulse to condition and check coupling at phases (90, 75, 105, 65 and 60).


(1) Shot-to-shot LH phase scan at constant forward LH power and density. 2 good shots at each phase
Starting target shot: 1120821016 (5.4T)
Changes:
Lengthen IP and BT flattops to 1.65s
Argon Puff out of B-lower instead of Hbottom
Be prepared to adjust the outer gap for LH coupling
Try to flatten current if possible

LH setup:
Aim for 700kW net power in each condition
On at 0.9s-1.6s
Phase:
- 65 (2 shots) match forward power from this shot going forward
- 90 (2 shots)
- 105 (2 shots)
- 75 (2 shots)
- if 65 went well attempt 60 (2 shots), low priority

Beam setup:
75ms on - 25ms off
Start at 0.310s
14 pulses

Total of 8 good shots if all goes well.

Decision points:
First 2 phases by 2:30pm
All 4 phases by 4:150pm, giving 1.5 hrs (6 long pulses left)
If it looks like we are not going to hit these milestones consider punting part (2), repeating some shots and moving to (3)



(2) A phase scan within a shot. 2 good shots, one stepping up, one down.
Starting target shot: End of part (1)
Changes:
Lengthen IP and BT flattops to 1.85s, engineers take note
Outer gap scan to agree with good gaps in each of the phases above.

First we scan down in phase, 1 good shot
LH setup:
On at 0.9s-1.8s
Phase: (Use settings from part (1) for klystron power to match forward power if possible)
- 105: 0.9-1.2s
- 90: 1.2 - 1.4s
- 75: 1.4 - 1.6s
- 65 (or 60 if successful in part (1)): 1.6 - 1.8s

Next we scan up in phase, 1 good shot
LH setup:
On at 0.9s-1.8s
Phase:
- 65: 0.9-1.2s
- 75: 1.2 - 1.4s
- 90: 1.4 - 1.6s
- 105: 1.6 - 1.8s

Beam setup:
75ms on - 25ms off
Start at 0.310s
15 pulses

If time permits, repeat one of the above for statistics.

(3) A MSE plasma sweep calibration shot
Ref shot: 1120612001
Changes: Convert to Rev B.

No LH
Same DNB



Physics Operators Plans
Entered: Sep 12 2012 08:27:33:733AM
Author: Jim Irby
-----------------
Engineering Setup
-----------------

MP 694 in the morning. SL: Liao
MP 705 in the afternoon. SL: Mumgaard

Run begins at 08:00 and ends at 18:00

Power systems as on: 1120907026

Acoil: -Dtop +Dbot +Jtop -Jbot (reversed field) Hybrid Enabled

Gas setup:

Morning
-------
Fill B-Top with 6 psi D2 Hybrid enabled (PG4)
fill B-side lower with 2 psi Neon Hybrid DISABLED (PG1)
leave B-side upper as is Hybrid DISABLED (PG2)
fill B-main (C-side) with 40 psi D2 Hybrid enabled (PG3)
fill H-bottom with 10 psi He4 Hybrid ENABLED (PG5)
fill NINJA with 10 psi D2 DISABLED

Enable gate-valves and shutters: ECE, VUV, HiREX Sr, Xeus/LoWEUS
Leave z-bolo shutter as is (should be open)

Afternoon
---------

Purge and then fill B-side lower with 1 psi Argon (PG1)



Torvac gatevalve toggle (yes/no): no

Boronization(yes/no): no
Overnight ECDC (yes/no): YES
ICRF(yes/no): YES
LH(yes/no): YES (in afternoon)
Cryopump (yes/no): YES
DNB (yes/no): YES

Vessel temperature: 35/35/35

------------------------------
ECDC Parameters (if requested)
------------------------------
gas and pressure: D2 at 2e-4 Torr
sweep: 44/45/103 cm
scan: 20/120 s

Session Leader Summaries
Entered: Sep 14 2012 06:16:59:813PM
Author: Bob Mumgaard
Today we did a scan in LH phase at near constant plasma conditions and net LH power. Were were able to successfully couple phasings of 75, 90, 105, 115 but not 65. We also did a LH phase scan within a long pulse at constant LH net power and plasma conditions. MSE performed well throughout the run and with the ISC actuating every shot and the error bars on the MSE data small (<0.1deg in the MSE frame.) The beam performed very well across the day, only dropping 2 pulses (the first pulse in the train in two different shots) this represents 402/404 DNB pulses, a 99.5% success rate! This data will allow us to compare to models of LH current drive.

Note that for most of the day we extended the IP and BT flattop to 1.65s and for the later part of the run we extended to 1.85s which caused some issues with the power supplied but Steve Wolfe, Jim Irby and Steve Scott figured out the problems with the setup. See their notes for details.

So overall we got most of what we were after, except at low phasing which was inaccessible and we couldn't couple to. (though we think we should have been able to) also, the reflection coefficients were pretty high for most of the day.

The good shots in scan:

phase: shots at 600kW net power
75: 16,17
90: 11,12, 22(560kW, density matched to 105/115 case)
105: 20,21
115: 24, 23(560kW)
variable: 28

Not matched but interesting:
10: 90 at 550kW

Ohmic: 4,5,6,15,26
MHD at 3-5kHz: 14,18

Trashed:
LH faults: 7,8,9,25,27
no-power: 1
Disrupts: 2,3,13
Fizzle: 19

Overall a very good day considering how many systems needed to work successfully. This completes part b of the MP705 and should close that MP.

Shot notes:
1: Cycle test
2: early disrupt
3: early disrupt
4: no LH coupling at 65deg
5: no LH coupling at 65deg
6: no LH coupling at 65deg, decide to go to 90deg
7: LH faults at 90deg
8: LH faults at 90deg
9: Less LH faults at 90deg
10: LH at 550kW at 90deg
11: LH at 600kW at 90deg, one of the scan
12: LH at 600kW at 90deg, other 90 part of the scan
13: Early disruption due to locked mode. Try again
14: Locks with MHD
15: LH didn't go, ohmic
16: LH at 600kW at 75deg
17: LH at 600kW at 75deg
18: Locked, but stayed going and got MHD throughout pulse, with LH making it worse. Cool shot.
19: Fizzle
20: LH at 560kW at 105deg, density a bit higher than 11,12,16,17
21: LH at 560kW at 105deg, ditto on density
22: Went back to match density and power to 20/21 at 90deg, accomplished it
23: LH at 550kW at 115deg.
24: LH at 600KW at 115deg
Switched to variable phase scan
25: LH faults in second to last step. Power supplies take a notch out of current
26: LH didn't go due to operator error, Ohmic
27: LH went but arced out a bit. Decide to up density a bit
28: LH at multiple phases at constant net power! Great shot.

Physics Operator Summaries
Entered: Sep 13 2012 09:47:37:483AM
Author: Jim Irby
This run was supposed to be an extended run from 08:00 to 18:00, but
trouble with the alternator turning gear hardware delayed operation for
approxmately 2 hours. It was decided that there would not be enough
time to do both 1/2 day mini-proposals. MP705 was picked to run for the
whole day.

The machine ran extemely well today. We had only one fizzle, shot 19,
which was the result of the primary seal leak at C-Hor opening up enough
to bring the machine vacuum nearly to 1e-5 Torr from the helium purge gas.
This seal was purged in helium rather than argon so that we could
verify that it was the major source of a leak we have been dealing with over the last few weeks.

We had several distruptions that were the result of locked modes
appearing early in the discharge. Increases in the target density fixed
the problem, but we were operating all day very close to locked mode
conditions, as we tried to maintain a low enough density for good LH
current drive. The density tended to rise with LH power w/o any gas
puffing at all from the main fueling valve making it particularly hard
to keep the density low enough to maintain good LH conditions.

The Lower Hybrid system performed extremely well. It provided many
fault-free lower hybrid pulses at the 600 kW level after adjustments in
density and the outer gap.

The DNB also performed extremely well. Pulses at about 6.5 A and 46.5 kV were maintained most of the day. A cell entry to adjust the gas level was required with the beam current dropped to around 6.2 A.

We extended the flat-top to 1.65 s for shot 02, the first plasma attempt
of the day. To extend the flat-top beyond 1.5 s requires extending the
programming and gain settings of over twenty wires and
pre-programmed supply voltages. I checked and changed seventeen of them,
but missed the OH1, OH2u, and OH2l voltages. Luckily, they required no
changes for a flat-top of only 1.65 s. However, on shot 25, I attempted
to extend the flat-top to 1.85 s, but we obtained only a 1.75 s
flat-top. Steve Scott noticed that the OH supplies had been missed, and
on shot 26, we had a full length discharge.

Session Leader Comments
Sep 12 2012 09:33:50:080AMKen LiaoDue to alternator problem which created a 2 hour delay in the run start, we are postponing Liao's part of the run day to next week. We will start directly at Mumgaard's run.
Sep 12 2012 10:08:18:087AM1120912001Bob MumgaardCycle test

Sep 12 2012 07:23:37:667PM1120912002Bob MumgaardAim:
First plasma. Bringing LH power up. On at 0.9s-1.6s.

Result:
No fueling, ate the gas and croaked really early


Sep 12 2012 10:54:09:563AM1120912003Bob MumgaardAim:
First plasma. Bringing LH power up. On at 0.9s-1.6s.

Result:
Didn't get the density up, shot terminates



Sep 12 2012 07:24:27:647PM1120912004Bob MumgaardAim:
First plasma. Bringing LH power up. On at 0.9s-1.6s. LH at 65deg

Result:
Good beam, plasma.
LH didn't couple.
Reduce outer gap (1.4cm now) by 5mm.
Increase density to 0.37.


Sep 12 2012 11:13:05:463AM1120912005Bob MumgaardAim:
Couple LH.

Result:
Better density, (0.37-0.4), got the outer gap decrease.
Good beam, ISC went.
No LH coupled though..

Remediation:
Decrease outer gap. No other changes.



Sep 12 2012 11:32:29:280AM1120912006Bob MumgaardAim:
Couple LH.

Result:
Got the gap. No LH.

Remediation:
.. Talking to LH crew. Going to 90deg phasing and moving down from there. Its 11:30, lets get something in the bag.



Sep 12 2012 07:24:46:767PM1120912007Bob MumgaardAim:
Couple LH at 90deg

Result:
Coupled LH until 1.16s then faults out. Vloop goes to -0.5 and we get some non-thermals. PLHnet around 450kW. LH ups nel04 0.05.

Remediation:
..I want better coupling.. Talking to LH crew. They adjust trip levels and push up power a bit.



Sep 12 2012 07:25:13:910PM1120912008Bob MumgaardAim:
Couple LH at 90deg, better.

Result:
Coupled LH until 1.22s then faults out, still doesn't start well. High reflection coeffs. Vloop goes to -0.4 and we get some non-thermals. PLHnet around 450kW. LH ups nel04 0.05.

Remediation:
More power and trip level adjustments.



Sep 12 2012 12:18:07:950PM1120912009Bob MumgaardAim:
Couple LH, better.

Result:
Three 30ms long chunks of LH, still doesn't start well. Higher net power.

Remediation:
1mm less outer gap. Try again...



Sep 12 2012 07:25:45:247PM1120912010Bob MumgaardAim:
Couple LH at 90 even better.

Result:G
Good solid LH pulse.

Next step:
Try to flatten the density. More LH power, 80ms Ar



Sep 12 2012 07:22:39:843PM1120912011Bob MumgaardAim:
More power. Better density control

Result:G
Good solid LH pulse.

Next step:
Try to flatten the density. Other than that repeat.


This is the first shot of the 90deg phase set and the phase scan.



Sep 12 2012 07:22:06:307PM1120912012Bob MumgaardAim:
Get the second 90deg phase shot.

Result:G
Good solid LH pulse.

Next step:
Change the phase to 75deg. All else the same.


This is the second shot of the 90deg phase.


Sep 12 2012 01:23:57:800PM1120912013Bob MumgaardAim:
Change the phase to 75deg

Result:
Locks early and disrupts

Next step:
Try again, avoid the early lock.



Sep 12 2012 01:45:00:443PM1120912014Bob MumgaardAim:
Change the phase to 75deg

Result:
LH faults out at 1. Comes back at 1.4 with more non-thermals and less loop voltage. Inspection of fluctuations shows the early LH has the 3-4kHz mode.

Next step:
Lowered power on the LH.



Sep 12 2012 02:13:43:697PM1120912015Bob MumgaardAim:
Get a good shot at 75 deg

Result:
Python problem kills LH. Ohmic shot

Remmediation:
LH computers communicate next time. No changes.


Sep 12 2012 02:15:23:410PM1120912016Bob MumgaardAim:
Get a good shot at 75 deg

Result:
Great LH, density a bit high compared to 12 but not puffing

Next step:
Repeat

This is our first comparison at 75deg.


Sep 12 2012 07:20:51:007PM1120912017Bob MumgaardAim:
Get the second good shot at 75

Result:
Identical to 12 but with a different phase

Next step:
Phasing to 105

Done with our 2 75 deg phasing. These will be shots 16 and 17.


Sep 12 2012 02:50:27:427PM1120912018Bob MumgaardAim:
First shot at 105deg

Result:
Looks pretty good. Locks early. Net LH power a bit low. Get the 3-4kHz mode

Next step:
Some more density early to avoid the locked mode. More klystron power to up the forward power.


Sep 12 2012 02:49:10:643PM1120912019Bob MumgaardAim:
First good shot at 105deg

Result:
F.. I... ZZLE

Next step:
Try again.

Sep 12 2012 03:30:53:373PM1120912020Bob MumgaardAim:
First good shot at 105deg

Result:
Good LH. Density a bit high.

Next step:
Try to tweak the density down a bit.

Sep 12 2012 07:18:41:950PM1120912021Bob MumgaardAim:
Second good shot at 105deg

Result:
Good LH. Density a bit high again

Next step:
Decided that 20 and 21 are nominally the same but a bit different from 11,12,16,17 in net power and density we will repeat shot 17 at this density. This will give an apples to apples comparison.
No PO changes. LH to 170kW/K and 90deg phasing.

Shots 20 and 21 will constitute our 105 deg shots.
Sep 12 2012 03:45:33:050PM1120912022Bob MumgaardAim:
Repeat shot 20 at 90deg.

Result:
Looks just like 21, 22. This will be a good touch base between 105deg and the previous 90deg data.

Next step:
Move to higher phase. 115 deg, increase the forward power to couple 600kW.
Sep 12 2012 07:19:44:170PM1120912023Bob MumgaardAim:
Get 115deg phasing shot with same net power as 105deg

Result:
Looks good enough

Next step:
Now we will try this phase scan within a shot. We start by moving down in phasing. This will require some changes:

PO: Ip, Bt flattop to 1.85s
EO: PS to allow this
DNB: 2 more pulses on beam
LH: Power from 0.9 to 1.8s. Phase steps as follows:
115deg : 0.9-1.2, 200kW/K
105: 1.2-1.4, 180kW/K
90: 1.4-1.6, 170 kW/K
75: 1.6-1.8, 160kW/K

Sep 12 2012 05:02:30:923PM1120912024Bob MumgaardAim:
A phase scan in LH power with long pulse.

Result:
Overall I am suprised this turned out this well. DNB looks good.
LH arced out during the 115deg phase segment, Greg thinks this will cure itself.
Density drops during LH.
Ip roll overs at 1.7s.
LH net power and phase not calculated.

Next step:
Steve, Steve, Jim are looking for why things fell apart around 1.7s

PO: Flatten density if possible.
LH: Phase and power switch at 1.6s is wrong. Fix.
Sep 12 2012 05:02:15:360PM1120912025Bob MumgaardAim:
A phase scan in LH power with long pulse.

Result:
Overall I am suprised this turned out this well. DNB looks good.
LH arced out during the 115deg phase segment, Greg thinks this will cure itself.
Density drops during LH.
Ip roll overs at 1.7s.
LH net power and phase not calculated.

Next step:
Steve, Steve, Jim are looking for why things fell apart around 1.7s

PO: Flatten density if possible.
LH: Phase and power switch at 1.6s is wrong. Fix.
Sep 12 2012 05:53:07:020PM1120912026Bob MumgaardAim:
A phase scan in LH power with long pulse.

Result:
LH faulted out, never went.

Next step:
Repeat but with LH.
Sep 12 2012 05:54:15:037PM1120912027Bob MumgaardAim:
A phase scan in LH power with long pulse.

Result:
LH faulted out during the later half of 90deg phase when the density bottomed out.

Next step:
Up the density a bit and repeat.
Sep 12 2012 07:10:35:027PM1120912028Bob MumgaardAim:
A clean phase scan in LH power with long pulse.

Result:
Great. Just great. Got all 4 phases coupled into it with constant new power. Loop voltage and non-thermals respond to each change in phase. Density creeps up and then pumps out causing non-thermals and loop voltage to change. DNB goes well. Temp increases. Not sure what we'll see in the physics, hopefully the current profile is moving around somewhat.

Next step:
Done with run. Thanks to everybody who stayed late.

Physics Operator Comments
Sep 12 2012 06:36:21:087AMJim IrbyTurning gear motor coupling to alternator required replacement of motor and shaft key this morning. Alternator has not yet begun spin up.
Sep 12 2012 07:41:43:893AMJim Irby****************************************************
******** Estimated run start is 10:00 **************
****************************************************
Sep 12 2012 08:19:23:027AMJim IrbyStored reversed field version of 1120612001 (Bob's Incredible Shrinking Plasma Shot) in /usr/irby/ shot 1002, having done just step 1 below, in seg 3. Step 2 will be done when we get to that part of the run plan. Seg 1 taken from last shot from yesterday (1120911021, non-cryo startup).


Detailed instructions for converting a normal field shot are:

Step 1:
For each segment (it is best to deal with all of them, even the unused
ones, to avoid future accidents), bring up the ALL_P and ALL_V screens
and use the "FLIP" menu item (on the pop-up menu under the right mouse
button) to invert the following waveforms:

ALL_Ps (seg1): IC_OH1,IC_OH2U,IC_EF1U,IC_EF1L,IC_EF2U,IC_EF2L,IC_EF4U,IP
note: all of the traces in the right-hand column
ALL_Vs (seg1): OH1_VOLT,CHOPPER,OH2U_VOLT,OH2L_VOLT,EF1U_VOLT,EF1L_VOLT,
EF2U_VOLT,EF2L_VOLT,EF4_VOLT,EF3_VOLT,TF_CURRENT
note: everything except the pulse gas lines.
ALL_Ps (seg2-4) EF2_by_EF4,IC_EF4U,IP (and any other IC_* that may be there)
ALL_Vs (seg2-4) OH1_VOLT,CHOPPER,OH2U_VOLT,OH2L_VOLT,EF1U_VOLT,EF1L_VOLT,
EF2U_VOLT,EF2L_VOLT,EF4_VOLT,EF3_VOLT,TF_CURRENT
note: everything but the pulse gas lines and ACOIL_CUR

Step 2:
If using the B21_PROJ feedback for locked mode control it is necessary
to recalculate the predictor on this wire. Note that the correct acoil
configuration for reverse field is (-Dtop +Dbot +Jtop -Jbot), the reverse
of the normal field direction. This must be properly entered by the
EngOp on his screen, and should be specified on the Physop run plan.
To recalculate the B21_PROJ predictor, click on the button to bring up the
EDIT_WIRE screen. If the EO has already entered the Acoil configuration on
his control screen then it should be sufficient to click the CALL button
on the middle row, for the algorithm "nonaxi_smw". However, to be sure that
the correct configuration is used, type the following line
ACOIL_CONFIG="-DTOP +DBOT +JTOP -JBOT"
into the Keyword Args field, and then click CALL. After the call completes, the
Alg. Version field should read:
07-Aug-2009,total 2/1 non-axisymmetric field at phi= 18.67 degrees, Acoil=-DTOP+DBOT+JTOP-JBOT
You can then OK the EDIT_WIRE screen, Acknowledge the P_INFO warning, and OK
the Verify Factor screen.


Sep 12 2012 10:23:37:067AM1120912002Jim IrbyWe have decided to start with Bob's LH run

load from 1120821016, 5.4 T, 600 kA, 3.8e19 /m^2, 24 ms prepuff
pg1 (argon) from 0.3 to 0.33 s
pg5 (He4) from 1.0 to 1.03 s
Otd

extended flat-top to 1.65 s --- changed timing of programming and gains in seg 2
Otd

plasma for 0.227 s
main gas was not enabled!


Sep 12 2012 10:43:55:660AM1120912003Jim Irbychanges --------------------------------

no changes

results --------------------------------

disrupted even earlier --- will try increasing early density
Sep 12 2012 10:56:50:210AM1120912004Jim Irbychanges --------------------------------

nl04 request to 0.6e20/m^2 before 0.3 s then back down to 0.38e20/m^2
Otd

results --------------------------------

plasma into rampdown --- need to increase rcur for LH
Sep 12 2012 11:08:51:010AM1120912005Jim Irbychanges --------------------------------

rcur from 0.6600 to 0.6625 m
nl04 request from 0.38e20 to 0.43e20 /m^2
Otd

results --------------------------------

plasma into rampdown --- got gap change, density higher
Sep 12 2012 11:30:41:143AM1120912006Jim Irbychanges --------------------------------

rcur from 0.66250 to 0.6645 m
argon puff from 30 to 60 ms starting at 0.3 s
Otd

LBO being added at 1.75 s

results --------------------------------

plasma into rampdown --- still have coupling issue with LH
Sep 12 2012 11:39:09:330AM1120912007Jim Irbychanges --------------------------------

no dpcs changes --- LH phasing to 90 deg

results --------------------------------

plasma into rampdown --- LH much better
Sep 12 2012 11:58:58:247AM1120912008Jim Irbychanges --------------------------------

Helium 4 puff from 0.030 to 0.020 s starting at 1.0 s
Otd

results --------------------------------

plasma into rampdown
Sep 12 2012 12:08:17:127PM1120912009Jim Irbychanges --------------------------------

no dpcs changes --- higher LH power requested

results --------------------------------

plasma into rampdown
Sep 12 2012 12:30:07:240PM1120912010Jim Irbychanges --------------------------------

RCUR from 0.66450 to 0.66550
reduced nl04 request before LH to try to keep density flatter during LH
Otd

results --------------------------------

plasma into rampdown --- great LH pulse


Sep 12 2012 12:44:12:250PM1120912011Jim Irbychanges --------------------------------

argon puff from 60 to 80 ms
reduced nl04 request again
rcur ramp from 0.9 to 1.65 s by +0.001 m

Otd


results --------------------------------

plasma into rampdown
Sep 12 2012 01:05:31:333PM1120912012Jim Irbychanges --------------------------------

dropped nl04 request yet again
He4 puff to 30 ms from 20 ms
Otd

results --------------------------------

plasma into rampdown
Sep 12 2012 01:28:49:790PM1120912013Jim Irbychanges --------------------------------

no dpcs changes, but LH to 75 deg

results --------------------------------

disruption at 0.48 s --- density drop begins at 0.42 s --- locked mode
Sep 12 2012 01:43:59:853PM1120912014Jim Irbychanges --------------------------------

nl04 request increased at 0.5 s --- try to keep density higher
Otd

results --------------------------------

plasma into rampdown

Sep 12 2012 01:58:07:327PM1120912015Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma into rampdown
Sep 12 2012 02:04:40:483PM1120912016Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma into rampdown

Steve Wolfe/Scott discovered locked modes limiting performance on shots 14 and 15. It's gone on shot 16.
Sep 12 2012 02:18:28:450PM1120912017Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma into rampdown
Sep 12 2012 02:41:31:727PM1120912018Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma into rampdown --- but locked mode at 0.48 s
Sep 12 2012 03:00:04:217PM1120912019Jim Irbychanges --------------------------------

nl04 request increased to reduce early locked mode

results --------------------------------

fizzle ---- helium leak from C-Hor secondary seal large enough to cause the fizzle, leak began on shot 11
Sep 12 2012 03:16:58:150PM1120912020Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma into rampdown --- but density rise during LH
Sep 12 2012 03:23:44:213PM1120912021Jim Irbychanges --------------------------------

nl04 request dropped from 6 to 5 e19/m^2 at 0.5 s
Otd

results --------------------------------

plasma into rampdown --- density down at LH start, but then pops up (no gas input)

Sep 12 2012 03:47:35:737PM1120912022Jim Irbychanges --------------------------------

no dpcs changes -- only LH power and phase

results --------------------------------

plasma into rampdown




Sep 12 2012 03:52:11:740PM1120912023Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma into rampdown
Sep 12 2012 04:39:54:637PM1120912024Jim Irbychanges --------------------------------

TF start time from -1.0 to -1.1 s to check polarimeter zero
Otd

results --------------------------------

plasma into rampdown
Sep 12 2012 05:09:40:233PM1120912025Jim Irbychanges --------------------------------

extended flat-top to 1.85 s
Otd


results --------------------------------

plasma into rampdown, but seems to start rampdown at 1.7 or so instead 1.85 s
Sep 12 2012 05:26:27:547PM1120912026Jim Irbychanges --------------------------------

rcur made flat at 0.6655 m (remove slight ramp)

Steve Scott discovered that the Oh supplies pre-programming was stopping at 1.75 s. So the problem in the previous discharge was explained. Gold star for Steve!

results --------------------------------

plasma flat-top for 1.85 s then disruption during ramp-down


Sep 12 2012 05:54:34:980PM1120912027Jim Irbychanges --------------------------------

no dpcs changes

results --------------------------------

plasma into rampdown
Sep 12 2012 05:51:27:513PM1120912028Jim Irbychanges --------------------------------

nl04 flattened out beyond 1.0 s
Otd


results --------------------------------

Engineering Operator Comments
ShotTimeTypeStatusComment
109:50:12:283AMTestOkCycle test no audio
210:14:58:547AMPlasmaOk
310:28:36:350AMPlasmaOk
410:45:32:680AMPlasmaOk
511:01:04:673AMPlasmaOk
611:21:13:780AMPlasmaOk
711:33:44:897AMPlasmaOk
811:49:44:653AMPlasmaOk
912:04:18:463PMPlasmaOk
1012:23:05:073PMPlasmaOk
1112:37:03:627PMPlasmaOk
1212:52:31:680PMPlasmaOk
1301:09:48:343PMPlasmaOk
1401:27:49:867PMPlasmaOk
1501:44:52:957PMPlasmaOk
1601:59:06:337PMPlasmaOk
1702:13:18:523PMPlasmaOk
1802:31:13:340PMPlasmaOk
1902:45:28:867PMPlasmaOk
2003:03:32:327PMPlasmaOk
2103:18:35:300PMPlasmaOk
2203:35:58:803PMPlasmaOk
2303:50:11:690PMPlasmaOk
2404:14:27:163PMPlasmaOk
2504:41:15:293PMPlasmaOk
2605:22:19:663PMPlasmaOk
2705:39:09:320PMPlasmaOk
2805:54:02:263PMPlasmaOk

System Availability
Sep 12 2012 09:49:53:457AM
SystemAvailableCommentAvailability
Changed
OwnerDescriptionWho Can
Change
Active MHDnosecured - tagged outJun 2 2008 11:03:58:433AM (sears)Joe SnipesActive MHD Antennagolfit
BESyesBES system is onlineNov 22 2011 02:21:12:050PM (bespam)Bill RowanBeam Emission Spectroscopybespam,liao,rowan
BolometersyesMidplane diodes functioning properly. Midplane bolometers working and calibrated. DIV bolometers installed but not yet toaster calibratedApr 20 2012 09:57:29:520AM (mlreinke)Matt ReinkeBolometershutch,mlreinke
Boronizationyes Jun 15 2012 05:02:46:313PM (dekow)Jim IrbyBoronizationdekow,irby
CECEyesThe system is currently operational for Te tilde measurement. Talk to Choongki about the current configuration Jul 3 2012 04:38:00:317PM (nthoward)Anne WhiteCorrelation ECEnthoward,sck83,whitea
CNPAyesMultiple channel CNPA available, no safety risk for in-vessel accessApr 14 2011 12:01:59:693PM (parker)Ron ParkerCompact Neutral Analyzerparker
Cryopump - Upper Divertoryes Jun 15 2012 05:02:31:550PM (dekow)Brian LaBombardUpper Divertor Cryopumpdekow,irby,labombard
CXRSyescore-CXRS system is onlineNov 22 2011 02:21:22:280PM (bespam)Bill RowanCharge Exchange Spectroscopybespam,blip,liao,rachmcd,rowan
CXRS edgeyesMichael CHurchill has primary responsibility at the momentApr 19 2011 11:44:46:247AM (blip)Bruce LipshultzMeasurement of CXR light in the pedestal region at both the high- and low-field sidesblip,rmchurch
D Alphayes\ha2_bright is available; \SPECTROSCOPY::TOP.VUV.VIS_SIGNALS:MCP_VIS_SIG1 is not availableJul 1 2009 09:45:41:090AM (terry)Jim TerryBalmer Alpha Monitorirby,terry,wolfe
Dalsanosystem is is installed and aligned, but not functional (appears to be a broken cable)Dec 5 2011 02:41:42:867PM (marmar)Earl MarmarVisible Bremsstrahlung Imagingmarmar
Disruption Mitigationyestwo gas jet valves active as of Feb 2012May 15 2012 10:09:23:597AM (granetz)Robert GranetzGas Jetgranetz,whyte
Divertor IRno Mar 6 2007 10:50:41:677AM Glen WurdenDivertor IR Digital Videogwurden,terry
Divertor IR Spectroscopyno Mar 6 2007 10:51:39:897AM Glen WurdenDivertor IR Spectroscopygwurden,terry
DMBolo AXUV diodesyesDiodes are taking usable data. Not all post-processing code is working yet.Feb 1 2012 01:24:23:953PM (golynyk)Geoff OlynykSet of six AXUV diodes in a toroidal array of midplane wall boxes.golynyk,granetz,mlreinke,whyte
DNByes"The beam could break at any moment."May 15 2012 10:09:52:470AM (granetz)Robert GranetzDiagnostic Neutral Beamdterry,granetz,mochung
ECDCyes Apr 26 2012 03:23:19:057PM (dekow)Jim Irby2.45 GHz, 3 kW, discharge cleaning systemdekow,irby,pfeiffer
FRC-ECEyesFRC-ECE is onlineMay 14 2012 11:53:01:693AM (bespam)Perry PhillipsHeterodyne ECE-32 channelsbespam,liao,phillips,rowan,whitea
FTCIyesSystem OperationalMay 14 2012 11:50:45:590AM (irby)Jim IrbyFast two-color interferometerirby
G-Side RatiomaticyesInstalled April 25,2012. New controller installed 5/29/2012Jun 7 2012 10:40:00:957AM (toland)Brian LaBombardG-side ratiomatic ionization gaugelabombard,toland
Glow DischargenoHV cables disconnected and power supplies off. Electrical plugs have been disconnected, capped and red tagged.Mar 5 2012 10:21:53:460AM (dekow)Jim Irby1 kV, 5 A, glow discharge systemdekow,dterry,irby
GPCyesOperationalApr 27 2012 07:41:46:907AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPC2yesOperationalApr 27 2012 07:42:03:317AM (hubbard)Amanda HubbardECE Polychromaterhubbard
GPIyesThe Xpt-view, the midplane-view cameras are operational. The innerwall GPI (coupled to the fast-diodes) is available. Jul 1 2009 09:45:50:933AM (terry)Jim TerryGas Puff Imagingterry,zweben
H/Dyessystem is functional and taking dataDec 5 2011 02:42:29:857PM (marmar)Earl MarmarH/D Ratiomarmar
HEATyes Apr 26 2012 03:23:49:607PM (dekow)Gary Dekow - Machine Heaters -burke,dekow
Hirex JryesHirex-Jr has been installedJun 28 2010 03:36:33:420PM (rice)John RiceHigh Resolution X-Rayince,rice
Hirex SryesInstalled and aligned. Will be available for Ti/Vr profiles after focusing tests and locked modes are taken.Dec 6 2011 08:21:02:453AM (ypodpaly)John RiceHigh Resolution X-Raycgao,ldelgado,rice,ypodpaly
HXRyes32 Channels operational,, no safety risk for in-vessel accessApr 14 2011 12:05:24:810PM (parker)Ron ParkerHard X-Ray Arrayfaust,parker,schmidt
ICRF D-Antennayes May 31 2012 09:20:06:827AM (wukitch)Steve WukitchD-port antennawukitch,ylin
ICRF E-Antennayes May 31 2012 09:19:57:640AM (wukitch)Steve WukitchE-port antennawukitch,ylin
ICRF J-Antennayes May 31 2012 09:19:47:443AM (wukitch)Steve WukitchJ-port antennawukitch,ylin
Impurity SpectroscopyyesBeing upgraded with better optics and new spectrographs. Dan Miller has primary responsibility.Apr 19 2011 11:46:02:193AM (blip)Bruce LipshultzMeasurement of recycling light and impurity source rates at multiple surfaces around the tokamakblip,miller
Laser Blow-OffyesPumped Down, Laser has not yet been tested but otherwise operationalMay 14 2012 04:31:17:037PM (nthoward)Martin GreenwaldImpurity Injection Systemg,nthoward
Lower HybridyesLH is now available for plasma operation up to ~900 kW net power.Jul 3 2012 02:50:00:693PM (wallaceg)Ron ParkerLower Hybriddterry,parker,wallaceg
Lower Hybrid ReflectometernooffApr 15 2011 08:24:27:930AM (dominguez)Arturo DominguezLower Hybrid Reflectometerdominguez,marmar,parker,sgbaek
LoWEUSyesLoWEUS viewing the 10-30 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:34:077AM (mlreinke)Matthew L. Reinke Long Wavelength Extreme Ultraviolet Spectrometermarkchil,mlreinke
LPInoBeam line removedMay 30 2008 02:09:12:833PM (bose)Earl MarmarLithium Pellet Injectorbose,marmar
Ly-alphanoMidplane Lyman-a not functioning. New B-PORT Lyman (BPLY) still being debugged.Jul 12 2012 08:52:28:233AM (mlreinke)Matt ReinkeLyman alpha camerasfaustian,labombard,mlreinke
Magneticsyes Dec 1 2011 11:51:51:970AM (g)Robert GranetzBp coils and flux loops for equilibrium controlgranetz,wolfe
McPhersonnoMcPherson under vacuum but is not run on a day-to-day basis. Can be requested if desired. LoWEUS has taken over as the primary Mo monitor.Jul 12 2012 08:53:14:937AM (mlreinke)Jim TerryVUV Spectrometermarkchil,mlreinke,terry
MichelsonyesVacuum 3-4e-8 T. Starting with Michelson at reduced speed.Apr 27 2012 07:42:41:960AM (hubbard)Amanda HubbardECE Te Profileshubbard,schmidt
MKSyes Dec 2 2011 12:27:47:163PM (toland)Brian LaBombardBaratron pressure gaugeslabombard,toland
MLPyesOperational. Connected to A-port probe systemMay 10 2012 08:40:19:910AM (labombard)Brian LaBombardMirror Langmuir Probe Electronics Systemlabombard
MSEyes2/29/2012 MSE operational. No HV or vacuum safety issuesFeb 29 2012 12:26:13:863PM (sscott)Steve ScottMotional Stark Effectjinseok,sscott
NeutronsyesVoltage is on for He3 detectors on J port. Remaining voltages will be turned on for the first run.Apr 23 2012 09:31:22:063AM (fiore)Catherine FioreNeutron Detectorsfiore
Neuts and HardsyesAll detectors Powered On --- Waiting for neutrons for calibrationNov 22 2011 01:05:24:380PM (irby)Jim IrbyX-Ray/Neutron Detectors at K-Horirby
NINJAyesC-bottom and new F-bottom system ready.Dec 2 2011 12:28:44:843PM (toland)Brian LaBombardNINJA gas pufflabombard,terry,toland
PCIyesOperational.Jul 10 2012 07:08:06:883PM (ntsujii)Miklos PorkolabPhase Contrast Imagingemd,ennever,ntsujii,porkolab
Penning GaugesyesHV power supplies turned ON in INIT, off in RECOOLMay 10 2012 08:41:03:000AM (labombard)Brian LaBombardPenning Ionization Gaugeslabombard
Plasma TVyesWIDE1, WIDE2 (chan 33), DANT, JANT and DIV are operational.Jul 1 2009 09:46:29:543AM (terry)Jim TerryVideo of plasma via several camerasdekow,irby,terry,wolfe
Polarimeteryes3 chords operational but with high noise levelJan 6 2012 04:22:20:903PM (irby)Jim IrbyC-Mod Polarimeterirby
Power - Alternator Air Switchyes Apr 26 2012 03:24:21:607PM (dekow)Gary DekowAlternator to Power Room Power Supply Connectioncochran,dekow,dterry,irby
Power - PEIyes Apr 26 2012 03:24:41:250PM (dekow)Gary DekowPEI Systemcochran,dekow,dterry,irby
Power - TMXyes Apr 26 2012 03:24:57:153PM (dekow)Gary DekowEf2s,. EFCs and A-Coilsbyford,cochran,dekow,dterry,irby
Power Systemsyes Apr 26 2012 03:25:14:497PM (dekow)Jim IrbyC-Mod Magnet Suppliesbyford,cochran,dekow,dterry,irby
Probe Array - ISDyesOperational. Some dead probes.May 10 2012 08:41:58:120AM (labombard)Brian LabombardInner Lower Divertor Probe Arraylabombard
Probe Array - LHyesOperational. 4 out of 6 probes working.May 10 2012 08:41:40:557AM (labombard)Brian LaBombardLower Hybrid Probe Arraylabombard
Probe Array - OSDyesOperational.May 10 2012 08:42:13:733AM (labombard)Brian LaBombardOuter Lower Divertor Probe Array (F and J)labombard
Probe Array - UDIVyesOperational. Some dead probes.May 10 2012 08:42:32:663AM (labombard)Brian LaBombardUpper Divertor Probe Arraylabombard
ReflectometeryesOn 1120608, the high frequency channels: 112, 140 and the variable, have been disconnected for some troubleshooting. All other channels are connectedJun 14 2012 11:28:59:603AM (dominguez)Earl MarmarReflectometerdominguez,marmar
Scanning Probe - ASPyesOperational. A variety of probe heads are ready for use.May 10 2012 08:43:10:937AM (labombard)Brian LaBombardA-Port Scanning Probelabombard
Scanning Probe - FSPyesOperational.May 10 2012 08:43:24:887AM (labombard)Brian LaBombardF-Port Scanning Probelabombard
Scanning Probe - WASPnoNot functioning. Probe tips are melted. Repair not performed during break.May 10 2012 08:44:43:137AM (labombard)Brian LaBombardInner Wall Scanning Probelabombard,nsmick
Shoelace AntennayesOperationalMay 10 2012 08:45:08:320AM (labombard)Brian LaBombardHigh-k active MHD antenna, for QCM, WCM studiesgolfit,labombard
SOL reflectometeryesc-port (top, middle, bottom) and h-port available. Only 1 of 4 locations can be used for each dischargeMay 1 2012 04:54:58:820PM (cornwall)Cornwall LauSOL reflectometercornwall,wukitch,ylin
SparkeryesSparker Power Supply powered up. Connected at K port using red cable 4/23/12 9:25AMApr 23 2012 12:06:10:983PM (parkin)Jim IrbyField Emission Preionization for C-Moddekow,irby,parkin
Surface Science StationyesSSS is under vacuum and fully available.Jul 3 2012 02:46:59:753PM (ochoukov)Bruce LipschultzRadially scanning probe located on K-portblip,ochoukov
TCIyesTCI lasers in operation May 14 2012 11:51:18:700AM (irby)Jim IrbyTwo-Color Interferometerirby,murray
TS - CoreyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:09:220AM (jrwalk)Jerry HughesCore Thomson scatteringjrwalk,jwhughes,yma
TS - EdgeyesOperating with both lasers, density calibration ongoing.Jul 19 2012 10:20:28:323AM (jrwalk)Jerry HughesMillimeter resolution edge Thomson scatteringjrwalk,jwhughes,yma
Vispecno350 and 670 nm, 4 spatial channelsNov 28 2007 09:58:35:493AM (agraf)Alex GrafVisible Spectrometeragraf
XEUSyesXEUS viewing the 1-6 nm region, spectral brightness vs. lambda and time are being stored in tree.Apr 20 2012 10:43:43:107AM (mlreinke)Matt ReinkeX-ray Extended Ultraviolet Spectrometermarkchil,mlreinke
XTOMOyesARRAY1->5 available. Specific channels on various arrays display issues.Apr 20 2012 05:36:28:523PM (faustian)Robert GranetzX-Ray Tomographyfaustian,granetz,mlreinke