Jun 10 1993 07:56:52:350AMRobert GranetzSession leader: Granetz
Assistant: Takase
Engineers: Bertolino/Fairfax

Start with shot 930609023 from yesterday. This one had a good sawtoothing
plasma for the first 0.110 s, then a minor disruption followed by MHD
oscillations. This initial disruption might have been due to the plasma
moving slightly upwards, or to the end of positive rate of current rise.

Commutation resistors:

OH1 0.0656 ohms
OH2U 0.0129
OH2L 0.0131
EF1U 0.1204
EF1L 0.1195

Ballast resistors:

EF2U 0.0454 ohms
EF2L 0.0460

Crowbar times were delayed to t=0.070 s starting with shot #016 yesterday.

Jun 10 1993 08:01:02:710AMRobert GranetzAt about 07:00 the IGT read 4e-7 torr.

Jun 10 1993 09:48:13:550AM930610001Robert GranetzFizzle. No current channel formed. Try it again.

Jun 10 1993 09:54:03:080AM930610001Robert GranetzMomentary power failure occurred between shots #001 and #002. Probably
will result in significant delay to restart power supplies, camac, lasers,
etc.

Jun 10 1993 10:39:50:960AM930610001Robert GranetzThe fill pressure was at 6e-5 torr for this shot. The field null looked
very good, so for the next shot, lower fill pressure to 5e-5 torr.

Jun 10 1993 10:41:56:660AM930610001Robert GranetzThe power glitch caused about a 1 hour delay, mostly because the alternator
had to come back to speed. It also shut down the interferometer laser, and
this can't be reset without access to the cell. We don't anticipate a
chance to do this until after the run is over.

Jun 10 1993 11:18:49:830AM930610002Yuichi TakaseShot 002 I_p to 60kA, then died.
Fill pressure 5.e-5.
Field null looks OK.
Several problems from the power glitch:
Piezo valve stayed open (TORVAC lost communication with the remote rack).
Air pressure was low (40psi).
TF bus Rog. not working right (integrator not reset).
TF shunt looks OK.
XTOMO data look crazy.

Will stop cooling, vent the cell, and fix whatever needs to be fixed.

Physics Operator Comments

Engineering Operator Comments
ShotTimeTypeStatusComment
109:29:13:110AMPlasmaOksmall flash -- will repeat shot
210:41:19:030AMPlasmaOk60ka plasma, torvac control problems