| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Yuichi Takase |
| Physics operator(s): | Robert Granetz |
| Engineering operator(s): | Vinny Bertolino,Steve Fairfax |
| Engineering Operator Run Comment |
| continued plasma shots |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments | |||
| Jun 10 1993 07:56:52:350AM | Robert Granetz | Session leader: Granetz
Assistant: Takase Engineers: Bertolino/Fairfax Start with shot 930609023 from yesterday. This one had a good sawtoothing plasma for the first 0.110 s, then a minor disruption followed by MHD oscillations. This initial disruption might have been due to the plasma moving slightly upwards, or to the end of positive rate of current rise. Commutation resistors: OH1 0.0656 ohms OH2U 0.0129 OH2L 0.0131 EF1U 0.1204 EF1L 0.1195 Ballast resistors: EF2U 0.0454 ohms EF2L 0.0460 Crowbar times were delayed to t=0.070 s starting with shot #016 yesterday. | |
| Jun 10 1993 08:01:02:710AM | Robert Granetz | At about 07:00 the IGT read 4e-7 torr.
| |
| Jun 10 1993 09:48:13:550AM | 930610001 | Robert Granetz | Fizzle. No current channel formed. Try it again.
|
| Jun 10 1993 09:54:03:080AM | 930610001 | Robert Granetz | Momentary power failure occurred between shots #001 and #002. Probably
will result in significant delay to restart power supplies, camac, lasers, etc. |
| Jun 10 1993 10:39:50:960AM | 930610001 | Robert Granetz | The fill pressure was at 6e-5 torr for this shot. The field null looked
very good, so for the next shot, lower fill pressure to 5e-5 torr. |
| Jun 10 1993 10:41:56:660AM | 930610001 | Robert Granetz | The power glitch caused about a 1 hour delay, mostly because the alternator
had to come back to speed. It also shut down the interferometer laser, and this can't be reset without access to the cell. We don't anticipate a chance to do this until after the run is over. |
| Jun 10 1993 11:18:49:830AM | 930610002 | Yuichi Takase | Shot 002 I_p to 60kA, then died.
Fill pressure 5.e-5. Field null looks OK. Several problems from the power glitch: Piezo valve stayed open (TORVAC lost communication with the remote rack). Air pressure was low (40psi). TF bus Rog. not working right (integrator not reset). TF shunt looks OK. XTOMO data look crazy. Will stop cooling, vent the cell, and fix whatever needs to be fixed. |
| Physics Operator Comments |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:29:13:110AM | Plasma | Ok | small flash -- will repeat shot |
| 2 | 10:41:19:030AM | Plasma | Ok | 60ka plasma, torvac control problems |