Alcator C-Mod Run 930622 Information

Back to runs

Miniproposals
Miniproposal:
Date Filed:
Title:
First Author:
Session Leader:Martin Greenwald (shots 1-11)

Operators
Session leader(s):Martin Greenwald
Physics operator(s):Robert Granetz
Engineering operator(s):Steve Fairfax

Engineering Operator Run Comment
Plasma run delayed by morning power upset

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:07:947PM
Author: To Be Determined
Summary of run 930618

Physics Operator: Granetz
Asst. Operator: Greenwald
Eng. Operator: Fairfax

The purposes of this run:
-------------------------
There were up to four things that we were hoping to address in this run:

a) Push the density higher. For this, we desired a long flattop plasma that
was vertically stable. We chose as the starting point shot #930618003
from last week. This shot lasted 0.35 s, and had moderate, symmetric
elongation, with Ip=0.3 MA.

b) Argon puffing, as requested by our x-ray spectroscopists in order to
measure Ti.

c) Start exercising the EFC chopper supply.

d) If time permits (which it didn't), try to get a breakdown without
commutating OH1.

Wall Conditioning/Vacuum:
-------------------------
ECDC was run for about 1.5 hours prior to the run, ending at around 10:00.
The base pressure before our first serious attempt at getting a plasma
was 4e-7 torr. No nitrogen "burps" occurred today.

Detailed Summary:
-----------------
This run was plagued by problems, many of which were directly related to
the previous maintenance day. Even though we only had plasmas on the last
three shots of the day, we did manage to address some of the run goals.
The EFC chopper supply was successfully tested into a dummy coil, first under
PLC control and then hybrid control. After the run, the EFC supply will be
connected to the coils in the machine, in preparation for more operation
later this week. Shot 009 was a nice plasma shot, similar to shot 930618003
from last week, which was used to program the PCS. For the next (and
final) two shots, the pulse gas programming was increased substantially,
resulting in very noticeable marfes, and early disruptions. Interestingly
enough, no increase in plasma density was measured between shot 009 and
shots 010 and 011. Also on the last two shots, argon was puffed in, and
x-ray lines were observed in the plasma on shot 011.

Problems:
---------
1) Cryogenic cooling was not started until early on the morning of the run,
and subsequently the machine was not at operating temperature until 11:00.
Cooling should have started the night before.

2) There was a power failure early in the morning which inexplicably caused
the UPS to fail. All power supplies and engineering camac had to be
reset and the UPS had to be tested for reliability.

3) During the first plasma attempt (after several test shots of the EFC
supply) the gas pre-fill system failed to work and had to be debugged,
which was somewhat time consuming. Since this was done during the INIT
state, the cooling was off, and after fixing the problem, the machine
had to re-cool, causing another delay.

4) The TF supply repeatedly crowbarred around t=0, tripping the breakers
for all of the PF supplies as well. This turned out to be due to
someone shutting off one of the TF cabinet halves while performing
work during the maintenance day yesterday.

5) The pulse gas signal was not coming out of the hybrid computer. This
turned out to be due to a loose cable, caused by an inadvertent bump
while working on the hybrid during the maintenance day yesterday.

6) EF3 was not firing. This was due to turning off the power to its
trigger interface board while work was done during the maintenance
day yesterday.

7) OH2L had a single phasing problem due to an SCR gate pulse which was
not getting through. It is not known whether this problem was due to
any activities during the maintenance day yesterday.

8) The TF bus current shunt severely overheated today, causing
solder to melt and dribble down. The 3 TF crowbars may have
contributed to this. The overheating was discovered almost by
accident after the run had ended. If the soldered joint had actually
failed, a 300 MJ explosion would have ensued, which would have put
me above Ian on the destructive machine operator list. The fix for
this will probably delay tomorrow's run significantly.

Score-card:
-----------
3 good shots
4 fizzles (all due to problems with power supplies)
0 no-breakdowns
4 tests (EFC and hybrid test shots)
--
11 total shots

Recommendations for future runs:
--------------------------------

1) Don't have Monday maintenance days.

2) Don't be session leader on Tuesdays.

Physics Operator Summaries

Session Leader Comments
Jun 22 1993 12:01:08:620PM930622001Robert GranetzTest of EFC's only

Jun 22 1993 12:01:13:690PM930622002Robert GranetzTest of EFC's only

Jun 22 1993 12:01:31:300PM930622003Robert GranetzTest of EFC's only.

Jun 22 1993 12:02:29:050PM930622004Robert GranetzFirst attempt at plasma shot.

Jun 22 1993 01:14:17:080PM930622004Robert GranetzThere has been an hour's delay due to a problem with the TF and PF
breakers.

Jun 22 1993 01:25:17:160PM930622004Martin GreenwaldInitial Engineering Setup

Supply Start Close Open CrowBar Invert mOhms
EF1L -1.6 -1.55 0 .07 .35 120
EF1U -1.6 -1.55 0 .07 .35 120
OH1 -1.45 -1.4 0 .07 .35 65.2
OH2L -1.6 -1.55 0 .12 .35 12.9
OH2U -1.6 -1.55 0 .12 .35 12.9
EF2L -1.0 .35 46
EF2U -1.0 .35 46
EF3 -.05 .35
EF4 -1.6 .35
EFC .4 .6
TF -1.65 .35

Jun 22 1993 01:27:37:310PM930622004Robert GranetzAborted first attempt. No gas prefill. Try again (without changing
shot #)

Jun 22 1993 02:02:37:980PM930622004Robert GranetzAnother delay caused by further problems with the gas pre-fill system, and
then the subsequent wait for coil temperatures to recool (since the pre-fill
problem was debugged while in INIT).

Jun 22 1993 02:16:30:060PM930622004Martin GreenwaldIntention: Repeat shot 003 from 06/18

Result: Fizzle, OH2 Lower single phasing, no EF3

Jun 22 1993 02:45:32:570PM930622005Martin GreenwaldIntention: Try again

Result: Same problems - OH2 single phases etc.

Jun 22 1993 03:40:05:370PM930622006Martin GreenwaldIntention: Try again

Result: Fizzle - OH2 problems solved, but TF still crowbars, all supplies shut down

Jun 22 1993 04:02:51:250PM930622007Martin GreenwaldIntention: Test pulsed gas no power supplies
- m out not equal to v out on previous shots

Result: Loose cable fixed - good pulsed gas shot

Jun 22 1993 04:20:57:470PM930622008Martin GreenwaldIntention: Try for plasma again

Result: Fizzle, no EF3

Jun 22 1993 04:28:12:740PM930622009Martin GreenwaldIntention: Try for plasma again

Result: Good plasma, 310 kA

Jun 22 1993 04:47:51:330PM930622010Martin GreenwaldIntention: More gas after 80 msec

Result: Disrupted at 224 msec, but density about the same

Jun 22 1993 05:12:03:610PM930622011Martin GreenwaldIntention: Small change in RCur program, move in by .5 cm, lower fill to 4e-4
Argon increased a bit
Result: Ip = .3 MA, Disrupted at .185 sec

Physics Operator Comments

Engineering Operator Comments
ShotTimeTypeStatusComment
111:06:42:840AMTestOkTest of EFC chopper with no TMX DC
211:20:39:770AMTestOkTest of EFC chooper with TMX supplies; 1 kA for .2 sec; OK
311:41:37:920AMTestOkTest with hybrid feedback OK
401:17:51:800PMPlasmaBadTF power supply crowbar at -0.136 seconds;
502:43:41:030PMPlasmaBadTF and OH2L problems
603:34:19:630PMPlasmaOkPlasma fizzled; TF crowbar, but found that TF 8 converter was switched o
703:51:48:360PMTestOktesting hybrid control of pulse gas after finding no pulse gas shots 1-6
804:12:56:390PMPlasmaBadEF3 did not pulse; interface board disabled
904:23:22:100PMPlasmaOkGood plasma! Over 300 msec long. First truly good shot all day.
1004:40:49:030PMPlasmaOkgood plasma; disrupted at 225 mSec
1105:03:34:910PMPlasmaOkGood plasma