| Operators | |
| Session leader(s): | Gerry Tinios |
| Physics operator(s): | Unknown |
| Engineering operator(s): | Unknown |
| Engineering Operator Run Comment |
| MP 042; Power Supply Characterization, Tinios et al |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments | |||
| Apr 25 1994 09:57:03:420AM | Gerry Tinios | Power supply characterisation (MP #42)
First shots are ony data aquisition tests (no power supplies). Then, power supply tests and finally MP #42. | |
| Apr 25 1994 11:22:49:980AM | Gerry Tinios | PLC coil current limits:
OH1 -- 15kA OH2U -- -15kA OH2L -- 10kA EF1U -- 5kA EF1L -- -5kA EF2U -- -5kA EF2L -- -5kA EF3 -- 15kA EF4 -- 2kA EFC -- -1.5kA | |
| Apr 25 1994 10:02:43:150AM | 940425001 | Gerry Tinios | Hybrid/data aquisition tests. No power supplies.
|
| Apr 25 1994 10:14:12:080AM | 940425002 | Gerry Tinios | Hybrid/data aquisition tests. No power supplies.
|
| Apr 25 1994 10:23:56:230AM | 940425003 | Gerry Tinios | Hybrid/data aquisition tests. No power supplies.
|
| Apr 25 1994 10:36:07:020AM | 940425004 | Gerry Tinios | Hybrid/data aquisition tests. No power supplies.
|
| Apr 25 1994 11:06:07:890AM | 940425005 | Gerry Tinios | Hybrid/data aquisition tests. No power supplies.
|
| Apr 25 1994 11:19:43:290AM | 940425006 | Gerry Tinios | Hybrid/data aquisition tests. No power supplies.
|
| Apr 25 1994 11:50:41:380AM | 940425007 | Gerry Tinios | Hybrid test.
|
| Apr 25 1994 12:56:20:750PM | 940425008 | Gerry Tinios | First power supply test. EF1 U and L. No TF
|
| Apr 25 1994 01:20:47:530PM | 940425009 | Gerry Tinios | EF3 test. EF1's commutated.
EF3 did not work. BP25_BC seems to be broken. |
| Apr 25 1994 01:32:57:780PM | 940425010 | Gerry Tinios | OH2's, EF1's(commutating) and EF3. They all worked.
|
| Apr 25 1994 02:22:44:120PM | 940425011 | Gerry Tinios | OH1, OH2's (commutating), EF1's (commutating), EF3.
|
| Apr 25 1994 03:25:09:890PM | 940425012 | Gerry Tinios | Everything except EF4 and TF is on. EFC is hybrid controlled.
Everything else is PLC controlled. Ground fault! |
| Apr 25 1994 03:46:56:880PM | 940425013 | Gerry Tinios | All four quadrant supplies running with negative currents.
OH1 and 2's showed faults. Chopper ran for a full second. |
| Apr 25 1994 04:00:22:990PM | 940425014 | Gerry Tinios | OH2's and EFC(for 2 seconds).
|
| Apr 25 1994 04:02:37:470PM | 940425015 | Gerry Tinios | OH1 and EFC.
|
| Apr 25 1994 04:13:35:650PM | 940425016 | Gerry Tinios | Everything is on including the TF.
|
| Physics Operator Comments |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 09:54:48:600AM | Test | Ok | CAMAC & Hybrid OK |
| 2 | 10:08:19:520AM | Test | Ok | OK |
| 3 | 10:22:06:620AM | Test | Ok | OK |
| 4 | 10:34:40:300AM | Test | Ok | Worked |
| 5 | 10:40:51:290AM | Test | Ok | OK |
| 6 | 11:05:51:100AM | Test | Ok | OK |
| 7 | 11:48:39:260AM | Test | Ok | coldstart worked |
| 8 | 12:42:55:640PM | Test | Ok | efi u+l only |
| 9 | 01:08:40:630PM | Test | Ok | ps tests |
| 10 | 01:27:14:590PM | Test | Ok | EF1 Commutation OK; OH2 closed circuit OK; EF3 OK |
| 11 | 02:12:39:290PM | Test | Ok | ps tests |
| 12 | 02:28:09:870PM | Test | Ok | power supply tests |
| 13 | 03:31:11:060PM | Test | Ok | power tests |
| 14 | 03:50:26:610PM | Test | Ok | power tests |
| 15 | 03:56:19:250PM | Test | Ok | power tests |
| 16 | 04:06:27:520PM | Test | Ok | power tests |