| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | John Rice |
| Physics operator(s): | John Goetz |
| Engineering operator(s): | Vinny Bertolino |
| Engineering Operator Run Comment |
| 2D neutral density |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Entered: Jul 7 2004 03:49:11:990PM |
| Author: To Be Determined |
From: LEADER::RICE Date: 18-JAN-1995 17:23:41 Description: Physics Operator Summary for 950118 Run Summary for 950118 The curse of MP049A continues...The first 3 hours of the run were spent trying to recover from previous friday run. There followed a period of the cycle plasma-fizzle-fizzle-plasma, which was finally broken with plasmas on the last 4 shots, although the density feedback got lost on one of those. Concerning the program for MP049A, there were 7 shots, which allowed for confirmation of the previously observed up-down neutral density asymmetry. These were not enough shots to provide for a quantitative vertical neutral density profile, but on the positive side, the total number of useable shots increased by a factor of 3.5. The RF was increased to a level of 3.5 MW with ion temperatures over 4 keV. Scorecard: 1 Dud 2 Tests 11 Plasmas 18 Fizzles |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:36:52:880PM |
| Author: To Be Determined |
| Physics operator summary for 950118 EO: Bertilino PO: Goetz SL: Rice Run 950118 was in support of Mini-Proposal #049A - 2D Neutral Density Profile Measurements by Charge Exchange Recombination Spectroscopy. The goal of this mini-proposal is to measure the 2D neutral hydrogen density profile. Program for this run: - Setup a lower SN discharge with parameters: Ip=0.8MA; Nel_04=0.6e20; - Puff argon and measure high n transitions in He-like Ar - Setup a D-shaped limited discharge and repeat Only the first two steps of the program were accomplished, and then just barely. Seven shots were deemed useable by the SL (see the Session Leader's summary for the physics results). Some things discovered today: 1) The values of the commutation resistors are very important for a robust startup. The OH1 resistor was not returned to its correct value after Run 950113. It took until shot 950118028 to determine that it was indeed a mismatched commutation resistor that was the cause of the copious fizzles. The flux plots indicated that the fields had too much curvature and the Bz ramp rate was too fast for the given current rise. It was suspected that something left over from Run 950113 was affecting the OH2 supplies, but it was the OH1 voltage that was causing the curvature of the fields. 2) A startup scenario with the OH1 commutation resistor 10% below the correct value was achieved, but this scenario was not robust. The fizzles today were too cold to register on the GPC and there generally was no current rise. Data from the z-meter array indicate that the plasmas were starting up inside and moving in further. This led to increased carbon influx, no current rise, and fizzles. Thus the pattern of fizzles/plasmas. 3) The first few shots today were wasted due to operator error. I thought I had been working on setting up modifications to shot 950112031, but instead I was working on the model left over from 950113. Thus, the startup scenario was wrong, and segment 1 was loaded from 950112031. After working on the startup (due to point 1) and finally getting a plasma, it was discovered that segment 2 was wrong, and the correct segment was loaded. 4) The RF group can inject greater than 3.5MW of power into the plasma, creating ions and electrons approaching 5keV. Engineering and diagnostics today: The OH1 commutation resistor was not returned to its nominal value after Run 950113. This effectively cost this run 26 shots and 7.5 hours. The interferometer lost a fringe and resulted in a very low density discharge. Scorecard: 33 shots = 12 plasmas + 18 fizzles + 1 dud + 2 p.s. tests only 7 plasmas were useable for the S.L. Shot summary for Run 950111 Reload of 950120031 Changes to shot 950120031: NL_04 draw to 0.6e20 ZCUR=-.02 PG1=(90V x .04sec) @ .3sec Shot change result ____ _____ ______ 1 OH test shot 2 OH test shot 3 dud - OH2's out of balance due to segment 1 from 950113 4 load segment 1 from 950112031 fizzle - null looks o.k. no signals on the GPC 5 P_0=1.3e-5 fizzle - null looks o.k. 6 P_0=1.7e-5 fizzle - too much Bz ramp 7 V_OH1=90V@.005; 106V@.01; 106@.015 fizzle - Bz ramp o.k. but Bz is too high 8 IC_EF4=-1100A (was -1075A) fizzle null somewhat better - Bz=8mT still no current formation 9 IC_EF4=-1115A; P_0=1.4e-5 fizzle - null better moves in - no current formed 10 IC_EF4=-1125A; P_0=1.2e-5 fizzle - null looks worse - some evidence of a Br problem 11 offset on BR_0=7e-3 (was 6.5e-3) plasma - disr. @ .354sec radiative collapse 12 move PG2 to 0.4sec plasma - disr. @ .35 EF2's on the rail segment 2 appears to be 950113 13 load segment 2 from 950112031 plasma - disr. @ 1.04 radiation rising through shot 14 hold NL_04 until .95 sec fizzle - no current rise 15 slide PG3 +.002sec fizzle - slight current rise 16 P_0=1.5e-5 fizzle - barely a flash 17 P_0=1.2e-5; slide PG3 +.002sec plasma - disr. during rampdown 18 no changes fizzle - weak Halpha 19 P_0=1.7e-5 plasma - disr @ 1.3 Halpha still weak 20 no changes plasma - disr. @ 1.06 moves out and down 21 slow down NL_04 ramp-down fizzle - no current rise 22 no changes fizzle - a little current rise 23 no changes plasma - disr. @ 1.31 very disruptive throughout 24 slide PG3 -.002sec; NL_04 break @ 1.1 fizzle - no current rise 25 no changes plasma - disr. @ 1.13 moves out at 1.0sec 26 slide PG3 -.001sec fizzle - no current rise 27 no changes fizzle - a little current rise 28 no changes fizzle - no current rise 29 change OH1 commutation resistor fizzle - no current rise to 44.7mOhms Bz too negative 30 IC_EF4=-1085A plasma - 'normal startup' disrupts @ 1.33 31 no changes plasma - disrupts @ .51 density loses fringe @ .155 comb. of RF and pellet killed it 32 EF3 invert time = 1.5sec plasma - disrupts @ 1.1 quick fin 33 NL_04 ramps @0.99sec; Li pellet @1.0 plasma - disrupts @ 1.25 |
| Session Leader Comments | |||
| Jan 22 1995 03:26:44:090PM | Jim Terry | The H_alpha signal from the camera viewing from the right side
of H port was abnormally low for this run, presumably because the view was being obscured by ice (frost) on the camera and/or window. This is signal \SPECTROSCOPY::TOP.Z_METER:INCAA16:INPUT_05 (uncalibrated) or \SPECTROSCOPY::top.uvis:HA_2_BRIGHT (calibrated). The other camera on H port \SPECTROSCOPY::TOP.Z_METER:INCAA16:INPUT_02 (uncalibrated) or \SPECTROSCOPY::top.uvis:HA_1_BRIGHT (calibrated) may have been affected as well. | |
| Physics Operator Comments | |||
| Jan 18 1995 08:34:43:960AM | John Goetz | Run 950118 - MiniProposal #049A
2D Neutral Density Profile Measurements by Charge Exchange Recombination Spectroscopy Run Plan: Run lower SN divertor discharges and puff argon Run D-shaped limited discharges and puff argon Start from 950112031: changes: NL_04=0.5e20 ZCUR=-.02 PG1=(90V x .04sec) @ 0.3sec | |
| Jan 18 1995 08:35:43:830AM | 950118001 | John Goetz | Shot 950118001:
OH test shot For 002: another test shot |
| Jan 18 1995 08:45:03:840AM | 950118002 | John Goetz | Shot 950118002:
OH test shot For 003: begin run |
| Jan 18 1995 09:05:43:740AM | 950118003 | John Goetz | Shot 950118003:
dud programming for segment 1 is from Run 950113 - OH2's are way out of balance For 004: load segment 1 from 950112031 |
| Jan 18 1995 09:22:10:210AM | 950118004 | John Goetz | Shot 950118004:
fizzle null looks o.k. - breakdown at .005 no signals on the GPC - a wimpy fizzle For 005: P_0=1.3e-5 |
| Jan 18 1995 09:37:16:970AM | 950118005 | John Goetz | Shot 950118005:
fizzle null looks o.k. - breakdown at .005 no signals on the GPC - a wimpy fizzle For 006: P_0=1.7e-5 |
| Jan 18 1995 09:57:50:530AM | 950118006 | John Goetz | Shot 950118006:
fizzle Bz ramp rate is too high early in the shot (compared to 950112031) For 007: Change OH1 voltage early to slow Bz ramp rate 90V@.005; 106V@.01; 106V@.015 |
| Jan 18 1995 10:10:27:370AM | 950118007 | John Goetz | Shot 950118007:
fizzle Bz ramp rate o.k. but Bz is too high For 008: IC_EF4=-1100A (was -1075A) |
| Jan 18 1995 10:34:15:380AM | 950118008 | John Goetz | Shot 950118008:
fizzle null a bit better - Bz now 8mT For 009: IC_EF4=-1115A P_0=1.4e-5 |
| Jan 18 1995 10:50:42:180AM | 950118009 | John Goetz | Shot 950118009:
fizzle null better - this one bounces but no current formation - z-meter says it moves inward For 010: IC_EF4=-1125A P_0=1.2e-5 |
| Jan 18 1995 11:04:18:480AM | 950118010 | John Goetz | Shot 950118010:
fizzle null worse - no current formation - z-meter says it moves inward some evidence of a radial field problem For 011: offset on BR_0 = 7.0e-3 |
| Jan 18 1995 11:20:56:950AM | 950118011 | John Goetz | Shot 950118011:
plasma - disruption @ .354sec - radiative collapse probably due to too much argon For 012: move PG2 to 0.4sec |
| Jan 18 1995 11:48:41:600AM | 950118012 | John Goetz | Shot 950118012:
plasma - disruption @ .35sec - EF2's on the rail it appears that segment 2 is also from 950113 and has slot divertor programming For 013: load segment 2 from 950112031 |
| Jan 18 1995 12:01:40:730PM | 950118013 | John Goetz | Shot 950118013:
plasma - disruption @ 1.04sec - radiation was rising density was falling For 014: hold NL_04 until 0.95sec |
| Jan 18 1995 12:13:29:860PM | 950118014 | John Goetz | Shot 950118014:
fizzle - bounces at .013sec - no current rise For 015: slide PG3 +.002sec |
| Jan 18 1995 12:29:55:400PM | 950118015 | John Goetz | Shot 950118015:
fizzle - bounces at .015sec - slight current rise For 016: P_0=1.5e-5 |
| Jan 18 1995 12:46:20:330PM | 950118016 | John Goetz | Shot 950118016:
fizzle - barely a flash For 017: P_0=1.2e-5 slide PG3 +.002sec |
| Jan 18 1995 01:01:14:160PM | 950118017 | John Goetz | Shot 950118017:
plasma - disruptive during rampdown - final disr. @ 1.31 For 018: no changes |
| Jan 18 1995 01:16:07:510PM | 950118018 | John Goetz | Shot 950118018:
fizzle - no current rise - very weak Halpha signal For 019: P_0=1.7e-5 |
| Jan 18 1995 01:32:25:660PM | 950118019 | John Goetz | Shot 950118019:
plasma - disr. @ 1.3 Halpha signal remains weak, but this one goes For 020: no changes |
| Jan 18 1995 01:50:23:650PM | 950118020 | John Goetz | Shot 950118020:
plasma - disr. @ 1.06 plasma moves down and out beginning at 1.0sec For 021: slow down the NL_04 ramp-down |
| Jan 18 1995 02:11:28:980PM | 950118021 | John Goetz | Shot 950118021:
fizzle - no current rise For 022: no changes |
| Jan 18 1995 02:12:13:210PM | 950118022 | John Goetz | Shot 950118022:
fizzle - a little current rise - bounces at .018sec For 023: no changes |
| Jan 18 1995 02:27:13:620PM | 950118023 | John Goetz | Shot 950118023:
plasma - disruptive during rampdown - final disr. @ 1.31 For 024: NL_04 break point at 1.1sec slide PG3 -.002sec |
| Jan 18 1995 02:36:13:060PM | 950118024 | John Goetz | Shot 950118024:
fizzle - no current rise - bounces at .014sec For 025: no changes |
| Jan 18 1995 02:53:59:420PM | 950118025 | John Goetz | Shot 950118025:
plasma - disr. @ 1.13 plasma jumps out at the current ramp down For 026: slide PG3 -.001sec |
| Jan 18 1995 03:15:21:490PM | 950118026 | John Goetz | Shot 950118026:
plasma - no current rise For 027: no changes |
| Jan 18 1995 04:03:07:320PM | 950118027 | John Goetz | Shot 950118027:
plasma - bounce at .014 - no current rise For 028: no changes |
| Jan 18 1995 04:04:42:190PM | 950118028 | John Goetz | Shot 950118028:
fizzle - bounce at .014 - no current rise For 029: OH1 commutation resistor now 44.7mOhms |
| Jan 18 1995 04:05:28:010PM | 950118029 | John Goetz | Shot 950118029:
fizzle - bounce at .016 - no current rise Bz too negative according to scatterplot For 030: IC_EF4=-1085A |
| Jan 18 1995 04:21:38:200PM | 950118030 | John Goetz | Shot 950118030:
plasma - disrupts @ 1.33 RF input power ~ 3.4MW For 031: no changes |
| Jan 18 1995 04:32:11:120PM | 950118031 | John Goetz | Shot 950118031:
plasma - disrupts @ 0.51 density feedback goes nuts @ .155sec due to no density signals dead by combination of RF, Li pellet, and no density For 032: EF3 invert time = 1.5sec |
| Jan 18 1995 04:46:47:440PM | 950118032 | John Goetz | Shot 950118032:
plasma - disrupts @ 1.1 - looks like a quick fin For 033: NL_04 ramp starts @ .99sec Li pellet @ 1.0 |
| Jan 18 1995 05:13:05:090PM | 950118033 | John Goetz | Shot 950118033:
plasma - disrupts @ 1.25 still moving out during rampdown |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 08:26:19:080AM | Test | Ok | coax test |
| 2 | 08:36:58:910AM | Test | Ok | coax test |
| 3 | 08:48:20:980AM | Plasma | Ok | no faults |
| 4 | 09:10:59:100AM | Plasma | Ok | no faults |
| 5 | 09:25:12:060AM | Plasma | Ok | no faults |
| 6 | 09:39:57:210AM | Plasma | Ok | no faults |
| 7 | 09:58:14:110AM | Plasma | Ok | no faults |
| 8 | 10:16:04:210AM | Plasma | Ok | no faults |
| 9 | 10:36:18:290AM | Plasma | Ok | no faults |
| 10 | 10:52:52:770AM | Plasma | Ok | no faults |
| 11 | 11:07:28:010AM | Plasma | Ok | no faults |
| 12 | 11:24:13:450AM | Plasma | Ok | no faults |
| 13 | 11:47:34:780AM | Plasma | Ok | no faults |
| 14 | 12:06:31:680PM | Plasma | Ok | no faults |
| 15 | 12:18:21:670PM | Plasma | Ok | no faults |
| 16 | 12:30:27:400PM | Plasma | Ok | no faults |
| 17 | 12:45:40:300PM | Plasma | Ok | no faults |
| 18 | 01:02:01:330PM | Plasma | Ok | no faults |
| 19 | 01:17:45:440PM | Plasma | Ok | no faults |
| 20 | 01:33:41:880PM | Plasma | Ok | no faults |
| 21 | 01:52:06:070PM | Plasma | Ok | no faults |
| 22 | 02:03:15:600PM | Plasma | Ok | no faults |
| 23 | 02:15:23:550PM | Plasma | Ok | no faults |
| 24 | 02:29:19:480PM | Plasma | Ok | no faults |
| 25 | 02:43:49:390PM | Plasma | Ok | no faults |
| 26 | 03:05:09:740PM | Plasma | Ok | no faults |
| 27 | 03:18:59:590PM | Plasma | Ok | no faults |
| 28 | 03:29:03:870PM | Plasma | Ok | no faults |
| 29 | 03:53:02:850PM | Plasma | Ok | no faults |
| 30 | 04:07:47:860PM | Plasma | Ok | no faults |
| 31 | 04:21:50:950PM | Plasma | Ok | no faults |
| 32 | 04:37:13:990PM | Plasma | Ok | no faults |
| 33 | 04:53:52:550PM | Plasma | Ok | no faults |