| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Steve Golovato |
| Physics operator(s): | Joseph Snipes |
| Engineering operator(s): | Frank Silva,Vinny Bertolino |
| Engineering Operator Run Comment |
| icrf heating |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Entered: Jul 7 2004 03:49:12:040PM |
| Author: To Be Determined |
| run summary - 950124 --------------------- SL: golovato PO: snipes EO: silva/bertolino Goals- (1) continue density scan at high power to higher densities nl04 = 0.6, 0.8, 1.0e20 done, do 1.2, 1.5e20 start with shot 950120019 where nl04=1.e20 (2) vary (increase) outer gap, observe changes in loading, plasma behavior (H-mode threshold). scan density. (3) if time, try H puffing to vary minority fraction. This was not one of the usual successful rf runs we've become accustom to. We only accomplished part of goal (2). We had reconfigured the e-port transmission line over the weekend to reduce voltages in the tuners. This was successful, with the voltages down by a factor of 2 and the loading up be a factor of 4, now twice the d-port loading. Remember that this is NOT the plasma loading but rather the resistance we must transform (match) to 50 Ohms using the tuners. We started with shot 19 from last friday, where nl04=1.e20 and the outer gap was about 7-8 mm. Since d-port was unchanged, it was matched from the start, while we had to tune e-port. The first 6 shots were lost to fizzles, duds, and tests. Once we got going we had trouble with the arc detection circuits for both transmitters, which had been worked on since friday. We were tripping when there weren't arcs because they were miss-set to be too sensitive. By shot 19, we managed to get about 1.2 MW on each antenna. At this point, we decided to increase the outer gap rather than raise the density. The loading was high on both antennas and there seemed to be some strong interactions with the edge plasma, as evidenced by glowing and occasional emissions from the antennas as seen on the tv monitors. From shot 20 on we ran with an outer gap of about 1.6 cm. Joe Snipes struggled to get constant rather than ramping inner and outer gaps, causing some shot-to-shot variations which made tuning somewhat difficult. However he solved the problem by shot 26. In the end we had good tunes and good loading with the larger outer gap, with d-port running reliably at 1.5 MW as usual, but e-port limited to about 1.0 MW, apparently by an arc. We did see some short H-mode transitions, but nothing as spectacular as was seen last friday. The reconfiguring of e-port did seem to solve another important problem, rf noise on hirex and pcx. It may be the lower voltages, that the dc break is now moved to a lower voltage point in the line, or that a loose bolt and some arcing was fixed in the dc break, or all three. The PCX saw enhanced flux compared to similar shots on friday, in particular on shots 24 and 25. It was not clear why but we also observed a change in loading, indicating changes in the edge plasma. The session leader shot-to-shot summary can be found in the logbook under the session_leader topic. Details on technical difficulties can be found in the physics operator summary. The shot summary was: 22 plasmas 7 fizzles 1 dud 1 ps test |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:36:52:927PM |
| Author: To Be Determined |
| High Power ICRF Run Session Leader: Steve Golovato Physics Operator: Joseph Snipes Engineering Operator: Frank Silva Continue near where 950120 left off, copying shot 950120019. Plan is to raise the density and increase the outer gap. Overall, the run did not go very well, but not horribly either. For the first third of the run, we were plagued with breakdown problems. Small changes in EF4 current and OH1 voltage were made and we finally got plasma, which then went away as time went on. So, I gradually reprogrammed the changes back to last Friday's startup and then the plasmas came regularly until the last shot, which also fizzled rather inexplicably. It bounced, but it was not clear why. Perhaps, we needed to wait longer for the gas to pump out. The RF power did not go very well either with constant small problems. Shots 24 and 25 had very short ELM-free H-modes during the RF at power levels of between 2 and 2.5 MW lasting just over 20 msec. Run Summary: Shot,Duration(s),Ipmax(MA) Shot,Duration(s),Ipmax 1 0.000 0.018 2 0.000 0.018 3 0.000 0.029 4 0.000 0.032 5 0.000 0.032 6 0.000 0.029 7 1.393 0.830 8 0.000 0.019 9 1.412 0.828 10 1.431 0.833 11 1.268 0.828 12 0.000 0.026 13 1.218 0.828 14 1.206 0.825 15 1.240 0.828 16 1.224 0.830 17 1.188 0.830 18 1.338 0.833 19 1.377 0.835 20 1.355 0.833 21 1.352 0.835 22 1.325 0.833 23 1.325 0.835 24 1.322 0.838 25 1.395 0.833 26 1.293 0.835 27 1.383 0.835 28 1.384 0.835 29 1.358 0.833 30 1.395 0.838 31 0.000 0.042 Finished summary for 950124 Total of 31 shots. 31 shots. 22 plasmas. 7 fizzles. 2 PF tests Shot 1: PF test shot. OK. Shot 2: Frank's error. Another PF test. Shot 3: Fizzle! Shot 4: Raised prefill to 1.7 x 10^-5 Torr. Fizzle! Shot 5: Dropped OH1 voltage at 15 ms by 50 V to 50 V to attempt to correct the vertical field at breakdown. Fizzle! Shot 6: Dropped OH1 voltage at 10 ms by 50V to 50 V again to attemp to correct the vertical field at breakdown. Fizzle! Shot 7: Lowered EF4 before t=0 from -1085 to -1100 A. Lowered prefill to 1.5 x 10^-5 Torr. Decent plasma! Shot 8: Repeat. Fizzle! Shot 9: Returned OH1 voltage programming to what it was on 950120. Plasma. Shot 10: Tweaked OH1 voltage programming in between 10 - 15 ms. Raised prefill to 1.7 x 10^-5 Torr. Decent plasma. Shot 11: Ar puff enabled at 0.3 sec. Modified RCUR in rampdown to try to eliminate MARFE. Decent plasma! Shot 12: Returned RCUR programming to previous values, since the rampdown got worse on shot 11. Fizzle! Shot 13: Returned EF4 current to -1085 A before breakdown. Good shot! Shot 14: Repeat. Good shot. Shot 15: Repeat. Good shot. Shot 16: Changed rampdown to be more consistent with flattop phase. Good shot. Finally got RF power up. Shot 17: Good shot. Shot 18: Modified rampdown phase to try to keep the density down by not pushing the plasma against the inner wall. Good shot! Shot 19: Tweaked CLEARIN to keep the plasma away from the inner wall during the rampdown. Good shot. Shot 20: Reduced RCUR from 0.67 m to 0.665 m to increase the outer gap. Good shot. Shot 21: Increased RCUR after 1 sec to keep the plasma away from the inner wall during rampdown. Also raised ZXL during rampdown up 6 cm to reduce the elongation. Good shot. Shot 22: Repeat. Good shot. Shot 23: Modified rampdown again to reduce elongation and increase the inner gap. Ramped up the CLEARIN to -6 mm to try to counteract the ramp down of the inner gap during the flattop. Good shot. Shot 24: Modified rampdown again to increase the inner gap by increasing CLEARIN and raising ZXL to 10 cm. Good shot. Short H-mode that tripped the RF power. Shot 25: Modified rampdown to further increase the inner gap by increasing CLEARIN. Also increased the ramp on CLEARIN during the flattop to try to maintain a constant inner gap. Good shot. Short H-mode that tripped the RF power. Shot 26: Moved integral gain on CLEARIN to ramp up from 0.3 to 0.5 sec to eliminate accumulated error that was apparently causing the ramp in the inner gap. Also, flattened requested CLEARIN assuming this will work. Good shot, but the inner gap is ramping again. Shot 27: Reduced ZXL and RXL during rampdown to eliminate jump at 1.12 sec in the inner gap. Good shot. Shot 28: Repeat. Good shot. Shot 29: Repeat. Good shot. Shot 30: Repeat. Good shot. Shot 31: Moved ZCUR down to its flattop value during the rampdown. Fizzle. |
| Session Leader Comments | |||
| Jan 24 1995 09:01:18:870AM | Steve Golovato | run goals -
(1) continue density scan at high power to higher densities nl04 = 0.6, 0.8, 1.0e20 done, do 1.2, 1.5e20 start with shot 950120019 where nl04=1.e20 (2) vary (increase) outer gap, observe changes in loading, plasma behavior (H-mode threshold). scan density. (3) if time, try H puffing to vary minority fraction. | |
| Jan 24 1995 09:01:58:130AM | 950124001 | Steve Golovato | 950124001 - pf test
|
| Jan 24 1995 09:02:43:950AM | 950124002 | Steve Golovato | 950124002 - dud. engineering operator error.
|
| Jan 24 1995 09:03:28:490AM | 950124003 | Steve Golovato | 950124003 - fizzle.
|
| Jan 24 1995 09:08:28:950AM | 950124003 | Steve Golovato | 950124003 - fizzle.
|
| Jan 24 1995 09:30:04:440AM | 950124004 | Steve Golovato | 950124004 - fizzle again.
|
| Jan 24 1995 09:56:26:950AM | 950124005 | Steve Golovato | 950124005 - fizzled.
|
| Jan 24 1995 10:26:59:480AM | 950124007 | Steve Golovato | 950124007 - good plasma. xmitter#2 didn't run. #1 interrupted
except at low power. tune was ok, trip is too sensitive. |
| Jan 24 1995 10:27:35:540AM | 950124008 | Steve Golovato | 950124008- fizzled again.
|
| Jan 24 1995 10:33:18:180AM | 950124008 | Steve Golovato | 950124008- fizzled again.
|
| Jan 24 1995 10:51:03:760AM | 950124009 | Steve Golovato | 950124009- plasma. both ran but #2 trip is also too sensitive, no
useful data for tuning. |
| Jan 24 1995 11:09:13:160AM | 950124010 | Steve Golovato | 950124010- good plasma. both still not tuned but some data
available for tuning. |
| Jan 24 1995 11:37:26:940AM | 950124011 | Steve Golovato | 950124011- good plasma. d-port tuned, e-port close but power still
very low. e-port loading much higher with reconfigured coax, even higher than d-port. this is not plasma loading, it is the load that must be matched to 50 ohms by the tuners. |
| Jan 24 1995 11:38:23:500AM | 950124012 | Steve Golovato | 950124012- fizzle.
|
| Jan 24 1995 12:15:02:650PM | 950124013 | Steve Golovato | 950124013- plasma. tuning better but some problems with arc detection
level. xmitters tripping when they shouldn't. |
| Jan 24 1995 12:16:06:960PM | 950124014 | Steve Golovato | 950124014- plasma. almost there. 400kw on e-port, 150kw on d-port.
. |
| Jan 24 1995 12:35:06:710PM | 950124015 | Steve Golovato | 950124015- plasma. e-port tuned, 550kw. d-port 125kw.
. |
| Jan 24 1995 12:47:59:300PM | 950124016 | Steve Golovato | 950124016- plasma. e-port .8mw, d-port .3mw
. |
| Jan 24 1995 01:11:26:870PM | 950124017 | Steve Golovato | 950124017- plasma. d-port 1.2mw, e-port 0.8mw, not overlapped.
e-port arc detection needs to be desensitized. . |
| Jan 24 1995 01:25:14:800PM | 950124018 | Steve Golovato | 950124018- plasma. d-port 1.1mw, e-port 1.1mw, with some interrupts.
. |
| Jan 24 1995 01:43:00:770PM | 950124019 | Steve Golovato | 950124019- plasma. d-port 1.251mw, e-port mistuned at high power.
. |
| Jan 24 1995 01:45:01:660PM | 950124019 | Steve Golovato | 950124019- plasma. e-port 1.25mw.
. |
| Jan 24 1995 01:59:25:340PM | 950124020 | Steve Golovato | 950124020- increase outer gap by increasing rcur by about 6mm.
this should increase outer gap from .7-.8cm to about 2cm. no e-port power, may have crowbarred last shot. d-port at 1mw. . |
| Jan 24 1995 02:35:22:000PM | 950124021 | Steve Golovato | 950124021 - 1.3mw from d-port, .6mw from e-port.
still tuning to larger outer gap of about 1.7cm. |
| Jan 24 1995 03:03:48:870PM | 950124022 | Steve Golovato | 950124022 - e-port loading now twice d-port. 1.6mw in d-port,
e-port arced at 1.1mw at .72s. |
| Jan 24 1995 03:06:05:610PM | 950124023 | Steve Golovato | 9950124023- plasma. d-port 1.5mw, e-port tripped at 800kw but was
tuned. |
| Jan 24 1995 03:22:38:110PM | 950124024 | Steve Golovato | 9950124024- good shot, got short h-mode, e-port tripped at h-mode
transition. adjusted tuning to mathc better at transition. |
| Jan 24 1995 03:41:54:040PM | 950124025 | Steve Golovato | 9950124025- still losing e-port at h-mode, keep trying to tune to h-mode
loading. |
| Jan 24 1995 03:51:53:850PM | 950124026 | Steve Golovato | 9950124026- #2 crowbarred, probably last shot.
#1 tripped at 1.5mw. little or no rf. |
| Jan 24 1995 03:57:38:840PM | 950124026 | Steve Golovato | 950124026- #2 crowbarred, probably last shot.
#1 tripped at 1.5mw. little or no rf. the gaps have been changing over the last few shots, causing us to tune to a moving target. |
| Jan 24 1995 04:23:33:500PM | 950124027 | Steve Golovato | 950124027- finally full puses on both antennas. need to tune a little.
|
| Jan 24 1995 04:26:18:460PM | 950124028 | Steve Golovato | 950124028- good tunes, but e-port trips at .82 s.
|
| Jan 24 1995 04:50:49:800PM | 950124029 | Steve Golovato | 950124029- brought up e-port power sooner so it tripped sooner.
looks like an arc. |
| Jan 24 1995 04:56:26:770PM | 950124029 | Steve Golovato | 950124029- brought up e-port power sooner so it tripped sooner.
looks like an arc. |
| Jan 24 1995 04:57:46:690PM | 950124030 | Steve Golovato | 950124030- e-port tripped when power ramped slightly at .83 s.
this didn't look like an arc, no jump in reflected power. |
| Jan 24 1995 05:02:56:740PM | 950124031 | Steve Golovato | 950124031- fizzle!!!!
|
| Physics Operator Comments | |||
| Jan 24 1995 08:45:59:320AM | 950124001 | Joseph Snipes | High Power ICRF Run
Session Leader: Steve Golovato Physics Operator: Joseph Snipes Engineering Operator: Frank Silva Continue Friday's RF run starting with shot 950120019. Plan is to raise the density and increase the outer gap. Shot 1 PF test shot. OK. |
| Jan 24 1995 09:00:19:690AM | 950124002 | Joseph Snipes | Shot 2
Try a repeat of shot 950120019. Frank's error. Another PF test. |
| Jan 24 1995 09:34:09:260AM | 950124003 | Joseph Snipes | Shot 3
Fizzle! |
| Jan 24 1995 09:34:41:870AM | 950124004 | Joseph Snipes | Shot 4
Fizzle! |
| Jan 24 1995 09:51:55:340AM | 950124005 | Joseph Snipes | Shot 5
Dropped OH1 voltage at 0.015 sec by 50 V to attempt to correct the vertical field error at breakdown. Fizzle! |
| Jan 24 1995 10:08:04:560AM | 950124006 | Joseph Snipes | Shot 6
Dropped OH1 voltage at 0.01 sec by 50 V as well to attempt to correct the vertical field error at breakdown. Fizzle! |
| Jan 24 1995 10:18:48:210AM | 950124007 | Joseph Snipes | Shot 7
Lowered EF4 current from -1085 to -1100 A before t = 0. Lowered prefill to 1.5 x 10^-5 Torr. Got plasma. Decent shot! |
| Jan 24 1995 10:26:14:830AM | 950124008 | Joseph Snipes | Shot 8
Repeat. Fizzle! |
| Jan 24 1995 10:54:19:460AM | 950124009 | Joseph Snipes | Shot 9
Returned OH1 voltage programming to what it was last Friday. Try again. O.K. plasma, but breakdown still shaky. |
| Jan 24 1995 11:00:45:560AM | 950124010 | Joseph Snipes | Shot 10
Tweaked OH1 voltage programming between 10 and 15 ms to smooth out the rapid change in voltage. Increased prefill to 1.7 x 10^-5 Torr to attempt to avoid the hard x rays. Decent plasma. |
| Jan 24 1995 11:25:58:210AM | 950124011 | Joseph Snipes | Shot 11
Argon gas puff enabled. There will be a 33 ms puff at 90 V starting at 0.3 s. Modified rampdown RCUR to push the plasma inward against the inner wall to try to eliminate the MARFE in the rampdown. Decent plasma, but rampdown was worse. |
| Jan 24 1995 11:41:47:330AM | 950124012 | Joseph Snipes | Shot 12
Returned rampdown RCUR to previous settings. Fizzle! |
| Jan 24 1995 11:59:49:720AM | 950124013 | Joseph Snipes | Shot 13
Returned EF4 programming to what it was last Friday on the theory that the machine is now cleaning up and can return to the previously good values. Good shot! |
| Jan 24 1995 12:45:46:500PM | 950124014 | Joseph Snipes | Shot 14
Repeat. Good shot. |
| Jan 24 1995 12:46:24:210PM | 950124015 | Joseph Snipes | Shot 15
Repeat. Good shot. |
| Jan 24 1995 12:49:20:120PM | 950124016 | Joseph Snipes | Shot 16
Modified rampdown to be consistent with flattop phase. RCUR, ZXL, RXL, and CLEARIN all had a small jump at the segment switch time of 1 sec. Good shot! Finally got nearly 1 MW of ICRF power. |
| Jan 24 1995 01:14:22:580PM | 950124017 | Joseph Snipes | Shot 17
Repeat. Good shot. |
| Jan 24 1995 01:25:12:430PM | 950124018 | Joseph Snipes | Shot 18
Modified current rampdown to try to keep an elongated plasma from going against the inner wall. The idea being to keep the density from going up as the plasma ramps down. Good luck! Good shot! |
| Jan 24 1995 01:46:02:750PM | 950124019 | Joseph Snipes | Shot 19
Tweaked clearin late to try to keep the plasma away from the inner wall during the current rampdown. Good shot! |
| Jan 24 1995 02:02:33:390PM | 950124020 | Joseph Snipes | Shot 20
Reduced RCUR from 0.67 m to 0.665 m to try to increase the outer gap. Good shot. |
| Jan 24 1995 02:31:10:600PM | 950124021 | Joseph Snipes | Shot 21
Increased RCUR after 1 sec to keep the plasma away from the inner wall during rampdown. Also raised ZXL during rampdown up 6 cm to reduce the elongation. Elminated ramp in CLEARIN during the flattop and eliminated most of the ramp in RXL to try to keep the inner gap constant during the flattop. Good shot. |
| Jan 24 1995 02:41:30:370PM | 950124021 | Joseph Snipes | Shot 22
Repeat. Good shot. |
| Jan 24 1995 02:55:46:880PM | 950124023 | Joseph Snipes | Shot 23
Modified rampdown again to reduce elongation and increase the inner gap. Ramping up the CLEARIN to -6 mm to try to counteract the ramp down of the inner gap during the flattop. Good shot. |
| Jan 24 1995 03:12:21:140PM | 950124024 | Joseph Snipes | Shot 24
Modified rampdown again to increase the inner gap by increasing CLEARIN and raising ZXL to 10 cm. Good shot. |
| Jan 24 1995 03:39:17:510PM | 950124025 | Joseph Snipes | Shot 25
Modified rampdown again to increase the inner gap by increasing CLEARIN. Also increased CLEARIN ramp during the flattop to try to keep a constant inner gap to -1 mm. Good shot. |
| Jan 24 1995 03:59:21:340PM | 950124026 | Joseph Snipes | Shot 26
Moved integral gain on CLEARIN to ramp up from 0.3 to 0.5 sec to eliminate accumulated error that was apparently causing the ramp in the inner gap. Also flattened requested CLEARIN assuming this will work. Good shot. However, the old ramp in the inner gap is back. So, the integral gain was not the problem. Let it be. |
| Jan 24 1995 04:25:42:680PM | 950124027 | Joseph Snipes | Shot 27
Reduced ZXL and RXL during rampdown to eliminate jump at 1.12 sec in the inner gap. Good shot. |
| Jan 24 1995 04:26:15:720PM | 950124028 | Joseph Snipes | Shot 28
Repeat. Good shot. |
| Jan 24 1995 04:51:42:150PM | 950124029 | Joseph Snipes | Shot 29
Repeat. Good shot. |
| Jan 24 1995 04:52:40:170PM | 950124030 | Joseph Snipes | Shot 30
Repeat. Good shot. |
| Jan 24 1995 05:16:54:080PM | 950124031 | Joseph Snipes | Shot 31
Moved ZCUR down to its flattop value during the rampdown. Fizzle! |
| Jan 24 1995 05:23:23:820PM | 950124031 | Joseph Snipes | Overall, the run did not go very well, but not horribly either. For the
first third of the run, we were plagued with breakdown problems. Small changes in EF4 current and OH1 voltage were made and we finally got plasma, which then went away as time went on. So, I gradually reprogrammed the changes back to last Friday's startup and then the plasmas came regularly until the last shot, which also fizzled rather inexplicably. It bounced, but it was not clear why. Perhaps, we needed to wait longer for the gas to pump out. The RF power did not go very well either with constant small problems. |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 08:35:53:630AM | Test | Ok | felt metal test |
| 2 | 08:52:32:190AM | Plasma | Ok | power suplies off no plasma fjs operator error |
| 3 | 09:01:38:140AM | Plasma | Ok | |
| 4 | 09:23:06:820AM | Plasma | Ok | good shot no plasma |
| 5 | 09:39:02:210AM | Plasma | Ok | no faults |
| 6 | 09:54:27:010AM | Plasma | Ok | no faults |
| 7 | 10:11:12:680AM | Plasma | Ok | no faults |
| 8 | 10:23:30:060AM | Plasma | Ok | no faults |
| 9 | 10:39:53:080AM | Plasma | Ok | nofaults plasma |
| 10 | 10:57:11:640AM | Plasma | Ok | no faults plasma |
| 11 | 11:14:43:800AM | Plasma | Ok | no faults plasma |
| 12 | 11:31:07:390AM | Test | Ok | no faults |
| 13 | 11:45:07:480AM | Plasma | Ok | no faults plasma |
| 14 | 12:04:52:810PM | Plasma | Ok | no faults p[lasma |
| 15 | 12:24:37:620PM | Plasma | Ok | no faults plasma |
| 16 | 12:42:00:290PM | Plasma | Ok | no faults plasma |
| 17 | 12:58:05:170PM | Plasma | Ok | no faults |
| 18 | 01:17:17:260PM | Plasma | Ok | no faults |
| 19 | 01:36:34:030PM | Plasma | Ok | no faults |
| 20 | 01:51:59:670PM | Plasma | Ok | no faults |
| 21 | 02:18:55:940PM | Plasma | Ok | |
| 22 | 02:32:55:210PM | Plasma | Ok | no faults |
| 23 | 02:52:56:000PM | Plasma | Ok | no faults |
| 24 | 03:10:39:470PM | Plasma | Ok | no faults |
| 25 | 03:28:29:120PM | Plasma | Ok | no faults |
| 26 | 03:44:02:610PM | Plasma | Ok | no faults |
| 27 | 04:01:07:450PM | Plasma | Ok | no faults |
| 28 | 04:16:43:480PM | Plasma | Ok | no faults |
| 29 | 04:31:24:660PM | Plasma | Ok | no faults |
| 30 | 04:46:48:910PM | Plasma | Ok | no faults |
| 31 | 05:01:18:410PM | Plasma | Ok | no faults |