Alcator C-Mod Run 951201 Information

Back to runs

Miniproposals
Miniproposal:
Date Filed:
Title:
First Author:
Session Leader:Steve Golovato (shots 22-32)
Miniproposal:062
Date Filed: 6/16/1994
Title:PCX Beast commissioning
First Author:Rejean Boivin
Session Leader:Rejean Boivin (shots 1-22)

Operators
Session leader(s):Rejean Boivin,Steve Golovato
Physics operator(s):Earl Marmar
Engineering operator(s):Joe Daigle,Vinny Bertolino

Engineering Operator Run Comment
RF Conditioning/Pellets

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:14:397PM
Author: To Be Determined

Run summary for 951201

SL R. Boivin/ S, Golovato
PO E. Marmar
Eng. V. Bertolino

Finish cross-calibrating the Beast (PCX) and continue
RF conditioning. First part of the day was plagued by fizzle and
multiple CAMAC errors. We eventually removed the EDGE crate and the errors
were much reduced.

Commisioning was tentatively completed at shot 22.

Reverted to RF/pellets.

We got ten more shots, but never got rf and a pellet at the same time.
Both rf systems are essentially ready for high power experiments. E-port
has run up to 1.8MW while D-port is limited to 1.2MW. D-port is plagued
by crowbars which occur at rf interrupts. It may be a tube arc or a
transmission line arc between the tube and the first directional coupler.
This will be looked at on monday. The plasma position feedback system
was checked out for the run on next tuesday. It still responds somewhat
to rf interrupts, but we know how to fix this problem and it will ready
for tuesday. The last three shots were lost to a hybrid problem which
was apparently diagnosed and fixed on saturday. Word to the wise, don't
cycle hybrid power during the run unless absolutely necessary.

For information on engineering problems and shot statistics, see the physics
operator summary. For shot-to-shot comments, see the logbook under the
session_leader topic.

Physics Operator Summaries
Entered: Jul 7 2004 04:36:55:473PM
Author: To Be Determined
Physop summary 951201

PO: Marmar
SL: Boivin/Golovato
EO: Bertolino/Daigle

Two goals for today: a) Finish PCX/TCX commissioning
b) High Power RF with D_2 Pellets (PEP?)

In spite of a number of problems, goal a) was substantially completed. High power RF H-modes (~3MW) were obtained but there were
no big pellets on those shots.

There were many CAMAC store problems through the day.
The hybrid appears to have broken in some way after shot 29, which was the last successful plasma shot.

ECDC in D_2 before the run.

Start from 951130022, but lower nl_04 to 6e19. TF on hybrid control.

1. Fizzle (40 kA)
2. EF4 20A less negative; plasma; slight glitch in TF current at ~.27 seconds
3. PLasma; Elm free H-mode starting at .5s; apparently our first Elm free ohmic H-mode at 5 Tesla.
4. Repeat; no H-mode.
5. Lower preprogrammed voltage on PG3; increase RCUR by 5 mm; lower nl_04 to 5e19; fizzle; numerous CAMAC store errors
6. EF4 10A more neg. fizzle
7. EF4 10A more neg. plasma
8. nl_04 to 6e19; fizzle
9. Add 2 msec to prefill puff; plasma
10. Decrease RCUR by 3 mm; fiddle with PG3 voltage preprogram; plasma
11. reload 9; fiddle with PG3 volt preprog.; add pulsed gas after breakdown in segment 1; plasma
12. repeat; fizzle
13. increase prefill puff 2 msec; fizzle; CAMAC store errors
14. reduce prefill puff 2 msec; fizzle
15. add 5 msec to prefill puff; plasma
16. PLC control on TF; plasma; TF glitch gone
17. fizzle
18. raise B_R offset 0.5 mT; plasma
19. repeat; plasma
20. repeat; plasma
21. repeat; plasma
22. repeat; plasma

end of Boivin portion of the run

23. Pellets + RF + argon; nl_04 to 1e20; plasma, no pellets; H-modes
24. Repeat; no pellets; H-modes
25. Increase argon 2 msec; plasma; pellet at 1 sec
26. Plasma; wimpy first pellet
27. PLasma
28. Plasma; lower RF power; teeny pellets
29. TF invert to 1.0 second; plasma; little pellet; H-modes

In attempt to fix glitches on Hybrid outputs, in between shots the hybrid was powered off/on then coldstart;

30. no EF4, OH1; hybrid outputs to the supplies are wrong
31. reload 29; no EF4, OH1
32. after attempts to find a problem with the hybrid, reload 27; no EF4, OH1

Summary:

32 attempts, 21 plasmas, 8 fizzles; 3 hybrid duds

Session Leader Comments
Dec 1 1995 01:35:59:050PM951201002Rejean BoivinPlasma, interesting H modes.
Gap is approx. 2 cm. Ohmic H mode at 5.5 T, elm-free?

Dec 1 1995 01:31:20:630PM951201003Rejean BoivinPlasma, interesting H modes.

Dec 1 1995 02:16:31:390PM951201022Rejean BoivinLast shot for PCX commisioning scan. We will switch
to RF/pellets.

Dec 1 1995 02:48:55:010PM951201022Steve Golovatoshot 951201022 -

plasma. no pellet. d-port tripped out at h-mode.
e-port had one interupt at during h-mode. prf=2mw.

Dec 1 1995 02:49:02:340PM951201023Steve Golovatoshot 951201023 -

plasma. no pellet. d-port tripped out at h-mode.
e-port had one interupt at during h-mode. prf=2mw.

Dec 1 1995 02:54:26:740PM951201024Steve Golovatoshot 951201024 -

plasma. no pellet. h-mode, no trips. 2.45mw.

Dec 1 1995 03:02:00:790PM951201024Steve Golovatoshot 951201024 -

40kv on e-port at 1.63mw, 3 ohms loading (dc2).

Dec 1 1995 03:06:53:950PM951201025Steve Golovatoshot 951201025 -

plasma. 2.56mw. d-port crowbarring at turnoff.
d-port .85mw at 32kv, 4.35ohms.

Dec 1 1995 03:33:10:650PM951201026Steve Golovatoshot 951201026 -

plasma. still no substantial pellet before rf.

Dec 1 1995 03:40:29:770PM951201027Steve Golovatoshot 951201027 -

plasma. 2.7mw, no trips, no crowbar.

Dec 1 1995 03:52:18:910PM951201028Steve Golovatoshot 951201028 -

plasma. d-port tripped early, no h-mode.
still not getting a good pellet.

Dec 1 1995 04:09:14:540PM951201029Steve Golovatoshot 951201029 -

ramping bt at 1 sec to get ece calibration,
no pellet at 1sec for this shot.

plasma, pellet still wimpy. 2.85mw. no trips.

Dec 1 1995 05:10:21:880PM951201030Steve Golovatoshot 951201030 -

dud. apparently a ahybrid problem. they cycled power on the
hybrid and a coldstart before this shot to try to fix some
glitches that are occurring on some outputs. this somehow screwed
things up.

Dec 1 1995 05:11:10:820PM951201031Steve Golovatoshot 951201031 -

dud again. reloaded shot 29 and rechecked hybrid to no avail.

Dec 1 1995 05:11:45:580PM951201032Steve Golovatoshot 951201032 -

dud again. did some more wiggling of wires to no avail..

Physics Operator Comments

Engineering Operator Comments
ShotTimeTypeStatusComment
108:38:40:330AMPlasmaOk
208:58:39:700AMPlasmaOk
309:15:44:330AMPlasmaOk
409:31:03:430AMPlasmaOk
509:55:13:670AMPlasmaOk
610:04:58:410AMPlasmaOk
710:19:26:420AMPlasmaOk
810:31:49:940AMPlasmaOk
910:39:57:080AMPlasmaOk
1011:05:49:930AMPlasmaOk
1111:21:50:130AMPlasmaOk
1211:44:08:300AMPlasmaOk
1312:01:15:700PMPlasmaOk
1412:15:53:220PMPlasmaOk
1512:34:40:160PMPlasmaOk
1612:49:38:510PMPlasmaOk
1701:01:09:590PMPlasmaOk
1801:12:30:190PMPlasmaOk
1901:24:31:710PMPlasmaOk
2001:47:24:270PMPlasmaOk
2101:57:17:850PMPlasmaOk
2202:07:59:580PMPlasmaOk
2302:32:32:040PMPlasmaOk
2402:48:17:590PMPlasmaOk
2503:00:29:520PMPlasmaOk
2603:20:18:350PMPlasmaOk
2703:31:30:600PMPlasmaOk
2803:44:00:710PMPlasmaOk
2904:03:10:560PMPlasmaOk
3004:13:53:010PMPlasmaOk
3104:37:12:250PMPlasmaOk
3205:07:25:440PMPlasmaOk