| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Ian Hutchinson |
| Physics operator(s): | Joseph Snipes |
| Engineering operator(s): | Frank Silva |
| Engineering Operator Run Comment |
| gauge cal/blip/snipe/silva |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments | |||
| Sep 4 1996 09:18:01:480AM | Earl Marmar | MP 161 JET Similarity
SL: Hutchinson PO: Marmar EO: Silva/ Engineering setup ------------------- Boronize overnight followed by ECDC (~1 hour in Helium followed by ~1 hour in Deuterium) Power systems setup as for 960830030 Gas setup = standard A-side 20psi D2 B-top 5psi D2 B-side Lower 4psi Ar Enable all for first shot (hybrid) Run plan -------- Start from PCS as on 960830043, a 1 MA 5.3 T shot. After operation is established, work on plasma shape to match the JET equilibrium of interest and raise the current to 1.2 MA. Assuming RF power is sufficient and desired shape is achieved, proceed with the miniproposal for non-dimensional comparison with JET. Hybrid coldstart. File not found errors. Tom Fredian says it is due to running the coldstart procedure at the same time as Josh's new CAMAC test procedure was being run. After Tom fiddled, I reran the hybrid coldstart; all matrices responded. Delay in run start due to 13.8 breaker trip, causing alternator to slow. | |
| Sep 4 1996 10:18:38:950AM | 960903002 | Earl Marmar | load 960830043; B_R offset to 6 mT from 5.5; twiddle segment 1 PG3 voltage;
reduce nl_04 programming during RF; plasma; disrupt on rmpdown at .5 MA |
| Sep 4 1996 10:28:05:810AM | 960903003 | Earl Marmar | reduce rcur by 2 mm; reduce clearin by 4 mm; RXL out 1 cm; Zcur up 1 cm;
fizzle |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 01:45:25:590PM | Test | Ok | Gas Calibration |
| 2 | 02:05:30:400PM | Test | Ok | gas pulse test |
| 3 | 02:14:53:550PM | Test | Ok | gauge cal |
| 4 | 02:33:44:930PM | Test | Ok | gas gauge calibration |
| 5 | 02:50:59:810PM | Test | Ok | pulse gas gfauge cal |
| 6 | 03:04:52:400PM | Test | Ok | |
| 7 | 03:18:16:330PM | Test | Ok | gauge cal |
| 8 | 03:30:15:930PM | Test | Ok | gas gauge cal |
| 9 | 03:41:20:070PM | Test | Ok | gas gauge cal. |
| 10 | 03:51:09:250PM | Test | Ok | gas gauge cal. |
| 11 | 04:04:54:340PM | Test | Ok | |
| 12 | 04:12:19:830PM | Test | Ok | |