Alcator C-Mod Run 960916 Information

Back to runs

Miniproposals
Miniproposal:
Date Filed:
Title:
First Author:
Session Leader: Unknown (shots 1-1)

Operators
Session leader(s): Unknown
Physics operator(s):Steve Wolfe
Engineering operator(s): Unknown

Engineering Operator Run Comment
oh tests

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries

Session Leader Comments

Physics Operator Comments
Sep 16 1996 12:06:46:720PMSteve WolfeSetting up to do a series of power tests on the OH coaxes. We will be
following a protocol laid out in a memo by Wolfe (11-sep-1996) designed
to reduce risks associated with putting current through the questionable
connection.

The immediate object is to get to a minimally faulted condition, i.e. a
resistance of 1-2uOhm, and perform some additional tests in that state,
prior to opening the machine.

Sep 16 1996 03:17:43:270PMSteve WolfeThe DC reading (100A) before any tests is reading 0.9uOhm on Oh2U.

The DC reading appears to be stable at 1.0+uOhm, so we will only do TF test

Sep 16 1996 03:35:48:170PM960916001Steve WolfeTF only test. Noise looks worse than usual, pickup level is pretty
close to nominal.

Engineering Operator Comments
ShotTimeTypeStatusComment
103:19:07:730PMTestOkTF ONLY