| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Unknown |
| Physics operator(s): | Earl Marmar |
| Engineering operator(s): | Vinny Bertolino,Frank Silva,Dave Terry |
| Engineering Operator Run Comment |
| startup/Marmar/Terry&Bertolino |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:36:57:520PM |
| Author: To Be Determined |
| Physop run summary 970603 PO Marmar EO Silva/Bertolino Because of the need for more tuning on FMIT#4, we decided to have a short run (until ~ noon) in order to evaluate machine conditions and test out various diagnostic changes effected since 970528, and then spend the afternoon on the RF. There were 3 fizzles; the run ended at noon. 1. Tuesday test -- CAMAC errors 2. Tuesday test -- CAMAC errors 3. CAMAC test 4. CAMAC test 5. CAMAC test 6. Tuesday test -- resistances OK loaded 970528038, pre-fill puff to 17 ms from 18 7. fizzle 8. B_R offset to 6.5 mT from 5.5; fizzle 9. B_R offset to 7.0 mT; 50 kA fizzle; possibly some hards ended the run to work on RF and CAMAC |
| Session Leader Comments |
| Physics Operator Comments |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 10:36:38:950AM | Test | Ok | Tuesday OH Test |
| 2 | 10:51:21:970AM | Test | Ok | |
| 3 | 11:05:38:100AM | Test | Ok | |
| 4 | 11:11:36:360AM | Test | Ok | |
| 5 | 11:19:55:530AM | Test | Ok | |
| 6 | 11:27:03:030AM | Test | Ok | |
| 7 | 11:35:46:250AM | Plasma | Ok | |
| 8 | 11:44:47:760AM | Plasma | Ok | |
| 9 | 11:56:52:350AM | Plasma | Ok | |
| 10 | 12:05:38:440PM | Plasma | Ok | |
| 11 | 12:28:26:140PM | Test | Ok | |
| 12 | 01:10:54:740PM | Test | Ok | |
| 13 | 01:31:00:970PM | Test | Ok | |
| 14 | 01:36:09:010PM | Test | Ok | |
| 15 | 01:41:50:740PM | Test | Ok | |
| 16 | 02:45:04:480PM | Test | Ok | |
| 17 | 03:23:18:820PM | Test | Ok | |
| 18 | 03:53:25:800PM | Test | Ok | |