Alcator C-Mod Run 970603 Information

Back to runs

Miniproposals
Miniproposal:
Date Filed:
Title:
First Author:
Session Leader: Unknown (shots 1-18)

Operators
Session leader(s): Unknown
Physics operator(s):Earl Marmar
Engineering operator(s):Vinny Bertolino,Frank Silva,Dave Terry

Engineering Operator Run Comment
startup/Marmar/Terry&Bertolino

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries
Entered: Jul 7 2004 04:36:57:520PM
Author: To Be Determined
Physop run summary 970603

PO Marmar
EO Silva/Bertolino

Because of the need for more tuning on FMIT#4, we decided to have a short run
(until ~ noon) in order to evaluate machine conditions and test out various
diagnostic changes effected since 970528, and then spend the afternoon on the RF.

There were 3 fizzles; the run ended at noon.

1. Tuesday test -- CAMAC errors
2. Tuesday test -- CAMAC errors
3. CAMAC test
4. CAMAC test
5. CAMAC test
6. Tuesday test -- resistances OK

loaded 970528038, pre-fill puff to 17 ms from 18
7. fizzle
8. B_R offset to 6.5 mT from 5.5; fizzle
9. B_R offset to 7.0 mT; 50 kA fizzle; possibly some hards

ended the run to work on RF and CAMAC

Session Leader Comments

Physics Operator Comments

Engineering Operator Comments
ShotTimeTypeStatusComment
110:36:38:950AMTestOkTuesday OH Test
210:51:21:970AMTestOk
311:05:38:100AMTestOk
411:11:36:360AMTestOk
511:19:55:530AMTestOk
611:27:03:030AMTestOk
711:35:46:250AMPlasmaOk
811:44:47:760AMPlasmaOk
911:56:52:350AMPlasmaOk
1012:05:38:440PMPlasmaOk
1112:28:26:140PMTestOk
1201:10:54:740PMTestOk
1301:31:00:970PMTestOk
1401:36:09:010PMTestOk
1501:41:50:740PMTestOk
1602:45:04:480PMTestOk
1703:23:18:820PMTestOk
1803:53:25:800PMTestOk