| Session leader(s): | Steve Wukitch |
| Physics operator(s): | Earl Marmar |
| Engineering operator(s): | Frank Silva |
| Engineering Operator Run Comment |
| mp148/80mhz rf conditioning/Marmer,Silva |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Entered: Jul 7 2004 03:49:16:913PM |
| Author: To Be Determined |
| Beginning MP148 (80 MHz RF Conditioning and Testing). The discharges will be constant throughout the run (BT = 5.4 T, Ip = 0.8 - 1. MA, nel = 0.5-1.0x10^20). Hopefully, the hydrogen concentration will be low enough to permit efficient minority heating. The top priority is to condition the antennas and maximize the coupled power. The RF will require 5-7 shots at low power to get calibration data for matching program before trying higher power. If time permits, MP142 (Ion tails and low density limit H-mode) will be started. shot comments 001 ef4 test 002 ef4 test 003 ef4 test 004 OH test 005 dud 006 fizzle FMIT #2 had no fizzle detect signal 007 fizzle (weaker than previous) still no fizzle detect on #2 008 plasma FMIT#1 ran, but FMIT#2 faulted 009 plasma switched ps #2 to old setting from '96 campaign; moved st #1 to start calibration; FMIT#2 faulted 010 plasma FMIT#2 still faulting 011 fizzle 012 fizzle 013 plasma lowered multiplication factor to 1 on FMIT#2, both transmitters ran 014 plasma changed ST#1 713->733 015 plasma changed ST#1 733->685; ST#2 2824->3177 016 plasma changed ST#1 685->550; ST#2 3177->3401 |
| Physics Operator Summaries |
| Entered: Jul 7 2004 04:36:57:723PM |
| Author: To Be Determined |
From: WOOD::MARMAR Date: 16-JUN-1997 23:31:12 Subj: physop run summary, 970616 MP148, 80 MHz tuning SL Wukitch PO Marmar EO Silva The morning was devoted to completion of RF tasks. An EF4 test, at about noon, showed a problem, which was solved by removal of the new reactors which had been added. The first plasma attempt came at about 3:00 pm. The first two plasmas showed evidence of some non-thermals early; this was solved after an EF4 preprogram tweak (10 Amp less -ve). The "sparker" was used for the first time. Triggering it at -.01s gave very early breakdown and current rise, resulting in strong fizzles. Triggering it at -.002s led to reproducible breakdown at about 6 ms. There were a total of 7 1MA plasmas, and 4 fizzles out of the 11 attempts with all power supplies. Attempts to lengthen the rampdown were made without obvious improvement. See the logbook for shot by shot tweak comments. |
| Session Leader Comments | |||
| Jun 16 1997 03:02:01:600PM | Steve Wukitch | Beginning MP148 (80 MHz RF Conditioning and Testing). The discharges will be constant throughout the run (BT = 5.4 T, Ip = 0.8 - 1. MA, nel = 0.5-1.0x10^20). Hopefully, the hydrogen concentration will be low enough to permit efficient minority heating. The top priority is to condition the antennas and maximize the coupled power. The RF will require 5-7 shots at low power to get calibration data for matching program before trying higher power. | |
| Jun 16 1997 03:09:47:410PM | 970616001 | Steve Wukitch | EF4 test |
| Jun 16 1997 03:09:59:020PM | 970616002 | Steve Wukitch | EF4 test |
| Jun 16 1997 03:10:06:970PM | 970616003 | Steve Wukitch | EF4 test |
| Jun 16 1997 03:11:16:080PM | 970616004 | Steve Wukitch | OH test |
| Jun 16 1997 03:11:32:900PM | 970616005 | Steve Wukitch | Dud |
| Jun 16 1997 03:12:25:960PM | 970616006 | Steve Wukitch | Fizzle FMIT#2 had no fizzle detect signal |
| Jun 16 1997 03:27:30:330PM | 970616007 | Steve Wukitch | fizzle |
| Jun 16 1997 03:28:19:990PM | 970616008 | Steve Wukitch | plasma FMIT#1 ran, but FMIT#2 faulted |
| Jun 16 1997 03:44:39:290PM | 970616009 | Steve Wukitch | plasma plasma switched ps #2 to old setting from '96 campaign; moved st #1 to start calibration; FMIT#2 faulted |
| Jun 16 1997 04:04:56:970PM | 970616010 | Steve Wukitch | plasma FMIT#2 still faulting |
| Jun 16 1997 04:05:17:390PM | 970616011 | Steve Wukitch | fizzle |
| Jun 16 1997 04:26:58:920PM | 970616012 | Steve Wukitch | fizzle |
| Jun 16 1997 05:09:44:120PM | 970616013 | Steve Wukitch | plasma lowered multiplication factor to 1 on FMIT#2, both transmitters ran |
| Jun 16 1997 05:10:08:170PM | 970616014 | Steve Wukitch | plasma changed ST#1 713->733 |
| Jun 16 1997 05:10:29:220PM | 970616015 | Steve Wukitch | plasma changed ST#1 733->685; ST#2 2824->3177 |
| Jun 16 1997 05:11:30:480PM | 970616016 | Steve Wukitch | plasma changed ST#1 685->550; ST#2 3177->3401 |
| Physics Operator Comments | |||
| Jun 16 1997 12:33:24:160PM | 970616001 | Earl Marmar | EF4 test shot; did not work as expected |
| Jun 16 1997 01:41:00:430PM | 970616002 | Earl Marmar | another EF4 test; no current |
| Jun 16 1997 02:41:12:670PM | 970616003 | Earl Marmar | another EF4 test; engineers report that its ok. |
| Jun 16 1997 02:49:18:690PM | 970616004 | Earl Marmar | "Tuesday" OH test; looks ok |
| Jun 16 1997 02:55:32:840PM | 970616005 | Earl Marmar | Plasma attempt reload from 970606035 B_R offset to 6.5 mT from 5.5 pre-fill puff to 18 ms from 24 "sparker" on; programmed on from -5ms to +10 ms no TF, no IH's, no EF1,EF3,EF4 power supply dud |
| Jun 16 1997 03:07:44:860PM | 970616006 | Earl Marmar | Plasma attempt try again Program TF for -150kA straight across 65 kA fizzle |
| Jun 16 1997 03:14:32:870PM | 970616006 | Earl Marmar | Plasma attempt try again Program TF for -150kA straight across 65 kA fizzle break down at 3 ms; delay sparker turn-on by 5 ms to -5ms (was -10 ms, despite previous logbook entry) |
| Jun 16 1997 03:20:39:570PM | 970616007 | Earl Marmar | fizzle break down at 3 ms; delay sparker turn-on by 5 ms to -5ms (was -10 ms, despite previous logbook entry) fizzle; B_R is too negative |
| Jun 16 1997 03:30:52:230PM | 970616008 | Earl Marmar | B_R offset to 8mT from 6.5 plasma; hards early |
| Jun 16 1997 03:47:01:710PM | 970616009 | Earl Marmar | add a little early P_G3 preprogram, segment 1 plasma more hards disrupt at end of flattop; something fell in? |
| Jun 16 1997 03:55:02:780PM | 970616010 | Earl Marmar | add 10A to EF4 preprog (less negative) delay sparker trigger on to -2 ms (from -5) plasma no hards |
| Jun 16 1997 04:05:50:050PM | 970616011 | Earl Marmar | rampdown tweaks to clearin and zcur fizzle |
| Jun 16 1997 04:19:21:660PM | 970616012 | Earl Marmar | fiddle with early segment 2 gas voltage prog (increase) enable argon puff fizzle |
| Jun 16 1997 04:45:29:330PM | 970616013 | Earl Marmar | prefill puff to 20 ms plasma; slightly later breakdown lost density feedback (interferometer signal problem) pulsed gas came full on at .56 seconds |
| Jun 16 1997 04:45:59:890PM | 970616014 | Earl Marmar | plasma |
| Jun 16 1997 05:01:17:710PM | 970616015 | Earl Marmar | move argon .1s earlier fiddle with rampdown (ZXL, RCUR, Clearin) plasma; disrupts at virtually the same time in rampdown |
| Jun 16 1997 05:01:34:660PM | 970616016 | Earl Marmar | no changes. plasma |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 12:29:55:010PM | Test | Ok | shot 1 ef4 only no go e set to low |
| 2 | 01:29:25:020PM | Test | Ok | ef4 test reverse no go IOC |
| 3 | 02:36:00:640PM | Test | Ok | ef4 test reverse half test ok |
| 4 | 02:42:47:100PM | Test | Ok | oh test |
| 5 | 02:50:18:820PM | Plasma | Ok | only 480vac power supplies went ??? |
| 6 | 03:05:18:090PM | Plasma | Ok | no plasma ps ok |
| 7 | 03:13:51:160PM | Plasma | Ok | no faults |
| 8 | 03:22:28:260PM | Plasma | Ok | plasma/ps ok |
| 9 | 03:38:44:120PM | Plasma | Ok | 1 MA disruption; no faults |
| 10 | 03:49:16:700PM | Plasma | Ok | goo d1 MA shot, ramp down to 300 kA |
| 11 | 04:02:43:680PM | Plasma | Ok | ps ok |
| 12 | 04:13:06:120PM | Plasma | Ok | no faults |
| 13 | 04:25:25:850PM | Plasma | Ok | |
| 14 | 04:36:57:720PM | Plasma | Ok | |
| 15 | 04:45:34:630PM | Plasma | Ok | |
| 16 | 04:56:56:230PM | Plasma | Ok | |