Miniproposals
Miniproposal:148
Date Filed: 7/16/1996
Title:RF Conditioning and Testing
First Author:Yuichi Takase
Session Leader:Yuichi Takase (shots 1-43)

Operators
Session leader(s):Yuichi Takase
Physics operator(s):Steve Wolfe
Engineering operator(s):Bill Cochran,Dave Terry,Vinny Bertolino

Engineering Operator Run Comment
mp148/mp163/Terry/Cochran/Bertolino/Wolfe/Takase/Goetz

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:16:990PM
Author: To Be Determined
Run summary 970624

MP148 RF conditioning
SL: Takase
PO: Wolfe

1st boronized run of this campaign (1038A assuming uniform deposition)

Objectives:
High power (2-2.5MW) RF operation into H-mode plasmas
High power tokamak conditioning (reduce H/D ratio)

If these objectives are met the run will be turned over to
MP163 High q// divertor studies (Goetz)

---------------------------------------------------------------------------
There were problems with discharge startup (see PhysOp summary).
RF had multiple problems. The two antennas did not run together
for any significant amount of time. The arc detection circuit
for the E-port antenna was not working, power feedback did not
work, and the plasma position feedback signal was not getting
to the hybrid. H-mode (mostly "ELM-free") was obtained on most
shots which made RF troubleshooting difficult. Some piggyback
activities were accomplished, including initial data on H-mode
transport barrier, impurity puffing, and D2 pellet injection.

01 test OH test
02 fiz
03 fiz
04 fiz
05 pla 5.4T, 1MA, nel(prog)=0.8, lots of H-modes
06 fiz
07 fiz
08 fiz
09 fiz
10 fiz
11 dud magnet resistance fault
12 fiz
13 fiz
14 pla 2 H-modes
15 fiz
16 fiz
17 pla lots of H-modes, raise nel(prog) to 1.0 for next shot
(try to get enhanced D_alpha H-mode)
18 pla longer H-mode, raise nel(prog) again for next shot
19 fiz
20 fiz
21 dud magnet resistance fault
22 fiz
23 pla Bad shot, disrupted @ 0.75s, E-port arced for 0.15s
24 pla nel(prog)=1.2, H-mode (still "ELM-free")
D-port only, E-port tripped on phase balance
25 fiz
26 pla E-port low power, D-port tripping
27 fiz
28 pla D-port still tripping, 4 little H-modes
29 fiz
30 fiz
31 pla D-port still tripping
32 fiz
33 fiz
34 fiz
35 pla E-port arced (power feedback/arc detector not working), will turn off
36 pla no E-port, D-port at low power (<0.5MW), no H-mode
37 fiz
38 pla Raised D-port power, got H-mode, tripping again
39 fiz
40 fiz

Physics Operator Summaries
Entered: Jul 7 2004 04:36:57:817PM
Author: To Be Determined
Physop Summary for Tues. 970624

MP 148 RF conditioning
163 High q|| divertor studies (piggyback)

SL Takase (if sufficient progress is made, then Goetz takes over for MP163)
PO Wolfe
EO Silva,Bertolino,Cochrane

Run Plan
--------
This will be the first post-boronization run of the campaign
The purposes of the run are:
1) Get both transmitters running together into plasma, at high power
2) Get physics-quality H-mode plasmas, including EDA if possible
3) Re-install and exercise the RF-loading position feedback circuit,
preferably on H-mode plasmas
4) Try to reduce the H/(H+D) ratio, probably by using between-shot
ECDC in D2
5) Try to improve startup reliability
6) Develop and test impurity puffing feedback in support of MP163
(piggyback)
7) Test D pellet injector
We will start with a 1MA shot with NL4 set to 8e19 and outer gap of 1cm.

Things to try on startup:
Drop RCUR offset to <6000
Change RCUR waveform
Increase OH pre-programmed voltages
Decrease EF3 pre-programmed voltage
Drop EF4 pre-programmed voltage, delay EF4 swing
Symmetrize EF2's, and perhaps delay positive swing
I want to try these ideas at the beginning of the run, but may need to punt if
we aren't getting plasmas and the RF is ready to go.

First priority is to get the power out of the two antennas operating
together. Target is P>2.5MW.

We need to demonstrate access to H-mode after boronization. This requires
reasonably efficient heating, which may require better control of
H/(H+D). This will need to be monitored during the run; it is possible that
the boronization will solve the problem. If not, we will test between-shot
ECDC in D2.

The RF-loading feedback on RCUR needs to be demonstrated again. It would be
best to do this in H-mode, but it can be tested in L-mode if necessary.

If we get that far, we will increase the density and look for EDA
H-modes. These are required for the MP163 experiment, although development and
testing of the algorithm could be done without EDA. When ready, we will begin
puffing N2 from the J-bot valve under feedback control from the bolometer
signals.

We may also test the D pellet injector late in the shot on a few
discharges. The DPI is required if we decide to do MP158 on Wednesday

We reduced the diborane bottle pressure by 71 psi during the
boronization last night --> 1038 Angstrom boron layer if uniformly
applied to the vessel surface.

PCS setup:
LOAD_FROM 970617031
Import seg1 from 97062037
Seg 2 changes: NL04 to 8e19
Seg1 changes:
RCUR offset to 6000
RCUR waveform to .653, constant
EF4_volt to 600,leave first non-zero point at -.003
OH1_volt to 180V from .005 to .015
OH2_volt to 10V from .005 to .015
copy V_ef2L ->V_EF2U
decrease pg4 puff from 32 to 22 (note that I should get 20% more gas due to higher pressure)

Results:
-------
The high priority goals were NOT accomplished. Some of the others
were. Referring to the above list:

1) We did not get E-port ICRF working; it seems to be somewhat worse off than when
we started. It's arc detectors are apparently not working; after this was
determined, it was turned off for the remainder of the run.

2) H-mode was obtained on several shots, with only D-port transmitter. All
were ELM-free or type-3 ELM's, but some lasted a reasonable length of
time. Shots 14,18,24 are examples. H-modes were obtained at target densities of
0.8,1.0 and 1.2e20 (programmed and achieved).

3) The RF_loading circuit was producing an output when E-port was operating,
but it is not clear it was doing the right thing. It does not appear to be
hooked up to the AFOL; there was no signal on Hybrid INPUT_81.

4) The H/(H+D) ratio did seem to be down. Weaver reported less than 5% except
on the midplane view which was about 10%, and it seemed to drop during the
day. Rejean got good data on shot 35 and reported 6%. The boronization may
have done the job. We did not attempt between-shot ECDC.

5) Startup was terrible again today. All the fizzles were moving back
inside. The problem seems to be less that B-z is coming in too fast than that
the current rise was too slow, or non-existent.

The modified startup produced one plasma, shot 5, (out of 12 attempts) but
after that further tweaks to try to increase the voltage and reduce Bz were
unsuccessful. I finally gave up after shot 13 and reloaded seg1 from
970620037, which had been the starting point. Since that worked, I didn't go
back, although I still think I was going in the right direction to begin
with.

The fizzles (and the success) in shots 2-13 had early H-alpha, with spikes,
indicating poor burn-out. This may have been a boronization effect. The
Z-meter burned out very fast, and the CII was extremely low all day. Later
shots, such as 17, had similar early H-alpha traces. I got breakdowns all the
way down to 10msec pre-puff width; this definitely is lower pressure than
previously possible.

One important effect I found and remedied (shot 34 and thereafter) is that the
C-integrator in SEG 1 was causing a significant imbalance in the demand to the
EF1 coils after t=0. This was eliminated by turning the integrator gate off at
t=0, so that the integral error accumulated in the ramp-up is reset.
******************************************************************************
***IT IS IMPORTANT TO SET THE INTEGRATOR GATE (NOT JUST THE GAINS) TO ZERO.***
******************************************************************************
This was undoubtedly one source of irreproducibility in the fields, although
not the only one. It may also be the reason the startup seemed to prefer
imbalanced EF2's. The signs of the imbalances seem to be opposite.

My recommendation is to start (segment 1) from shot 970624005, and set the
integrator gate to zero at t=0. Certainly the Friday startup was not at all
robust, and symmetrized EF2's would seem to be a good idea. In any case, the
integrator gate should be zeroed (reset).

6) The jbot valve was exercised, but still seems to have very poor response. A
125 msec pulse was needed to get a noticeable injection with 4psi of N2. The
bolo signals are coming in to the hybrid on channels 85 and 86. [The zmeter
signal is also now working, on channel 83].

7) The pellet injector is working. Pellets were injected on shots 31,36,and 38
(2 pellets/shot at 1.15 and 1.4sec). It is necessary to allow substantial
pump-out time to prevent a pressure burst when the PI gate valve is
opened. For the later shots Martin moved the open time earlier, allowing the
burst to decay somewhat.

Rice observed a decrease in rotation at pellet injection. Weaver looked for
CER in Boron emission from the pellet, but didn't see any.

Problems
---------
Power systems ran well today, with no faults or crowbars. There were two shots
lost to magnet resistance faults.

The TF thermocouple scanner still has problems, but Willy thinks they are
solvable. According to him, there were some good readings among the bad; he
suspects some incorrect connections.

Partial flux loop F13 failed on shot 22 and fixed itself during shot 23. The
outer gap may have been forced to a small value on 23 by the spurious signal
on F13; the shot disrupted early.


Scorecard:
----------
Tests 1
Duds 2 (mag resistance fault)
fizzles 25 !
plasmas 12
------- --
shots 40

There were also three gas calibration tests for BLIP after the conclusion of
the run.

Session Leader Comments
Jun 24 1997 08:38:20:250AMYuichi TakaseMP148 RF conditioning
SL: Takase
PO: Wolfe

1st boronized run of this campaign (1038A assuming uniform deposition)

Objectives:
High power (2-2.5MW) RF operation into H-mode plasmas
High power tokamak conditioning (reduce H/D ratio)

If these objectives are met the run will be turned over to
MP163 High q// divertor studies (Goetz)
Jun 24 1997 08:51:31:350AM970624001Yuichi TakaseOH test
Jun 24 1997 09:30:01:520AM970624002Yuichi TakaseFizzle
Jun 24 1997 09:30:10:030AM970624003Yuichi TakaseFizzle
Jun 24 1997 10:20:03:950AM970624004Yuichi TakaseFizzle
Jun 24 1997 10:23:50:650AM970624005Yuichi TakasePlasma
5.4T, 1MA, nel(prog)=0.8
Lots of H-modes, RF needs tuning
testing position feedback
turn on E-port Vmax detector for next shot
Jun 24 1997 10:25:08:540AM970624006Yuichi TakaseFizzle
Jun 24 1997 10:25:17:060AM970624007Yuichi TakaseFizzle
Jun 24 1997 10:46:08:520AM970624008Yuichi TakaseFizzle
Jun 24 1997 10:46:17:720AM970624009Yuichi TakaseFizzle
Jun 24 1997 11:04:43:860AM970624010Yuichi TakaseFizzle
Jun 24 1997 11:05:33:310AM970624011Yuichi Takasemag res fault
Jun 24 1997 11:20:41:780AM970624012Yuichi TakaseFizzle
Jun 24 1997 11:34:58:510AM970624013Yuichi TakaseFizzle
Jun 24 1997 11:55:24:770AM970624014Yuichi TakasePlasma
loaded a shot from Friday
2 H-modes ("ELM-free")
Jun 24 1997 11:55:36:060AM970624015Yuichi TakaseFizzle
Jun 24 1997 11:55:44:850AM970624016Yuichi TakaseFizzle
Jun 24 1997 12:31:12:060PM970624017Yuichi TakasePlasma
lots of H-modes
raise nel(prog) to 1.0 for next shot
(try to get enhanced D_alpha H-mode)
Jun 24 1997 12:32:38:370PM970624018Yuichi TakasePlasma
longer H-mode, raise nel(prog) again for next shot
Jun 24 1997 12:34:33:420PM970624019Yuichi TakaseFizzle
Jun 24 1997 12:37:37:690PM970624020Yuichi TakaseFizzle
Jun 24 1997 12:47:52:190PM970624021Yuichi TakaseMagnet resistance fault
Jun 24 1997 12:54:18:950PM970624022Yuichi TakaseFizzle
Jun 24 1997 01:24:08:620PM970624023Yuichi TakasePlasma
Bad shot, disrupted @ 0.75s
E-port arced for 0.15s
Jun 24 1997 01:54:37:900PM970624024Yuichi TakasePlasma
nel(prog)=1.2, H-mode (still "ELM-free")
D-port only, E-port tripped on phase balance
Jun 24 1997 01:56:12:070PM970624025Yuichi TakaseFizzle
Jun 24 1997 02:20:57:860PM970624026Yuichi TakasePlasma
E-port low power (60kW), D-port tripping, no H-mode
Jun 24 1997 02:21:08:900PM970624027Yuichi TakaseFizzle
Jun 24 1997 02:42:57:850PM970624028Yuichi TakasePlasma
D-port still tripping, 4 little H-modes
Jun 24 1997 02:44:16:760PM970624029Yuichi TakaseFizzle
Jun 24 1997 03:00:25:460PM970624030Yuichi TakaseFizzle
Jun 24 1997 03:13:57:960PM970624031Yuichi TakasePlasma
D-port still tripping
Jun 24 1997 03:27:13:160PM970624032Yuichi TakaseFizzle
Jun 24 1997 03:30:44:240PM970624033Yuichi TakaseFizzle
Added gas puff 0.7-1.0s
Jun 24 1997 03:51:55:410PM970624034Yuichi TakaseFizzle
Jun 24 1997 04:19:01:180PM970624035Yuichi TakasePlasma
E-port arced (power feedback/arc detector not working), will turn off
Jun 24 1997 04:20:19:170PM970624036Yuichi TakasePlasma
no E-port, D-port at low power (<0.5MW), no H-mode
Jun 24 1997 04:38:01:680PM970624037Yuichi TakaseFizzle
Jun 24 1997 04:41:32:050PM970624038Yuichi TakasePlasma
Raised D-port power, got H-mode, tripping again
Jun 24 1997 04:53:41:600PM970624039Yuichi TakaseFizzle
Jun 24 1997 05:01:24:480PM970624040Yuichi TakaseFizzle

Physics Operator Comments
Jun 24 1997 07:06:31:520AMSteve WolfeRun Plan for Tuesday, 970624

MP 148 RF conditioning
163 High q|| divertor studies (piggyback)

SL Takase (if sufficient progress is made, then Goetz takes over for MP163)
PO Wolfe

This will be the first post-boronization run of the campaign
The purposes of the run are:
1) Get both transmitters running together into plasma, at high power
2) Get physics-quality H-mode plasmas, including EDA if possible
3) Re-install and exercise the RF-loading position feedback circuit,
preferably on H-mode plasmas
4) Try to reduce the H/(H+D) ratio, probably by using between-shot
ECDC in D2
5) Try to improve startup reliability
6) Develop and test impurity puffing feedback in support of MP163
(piggyback)
7) Test D pellet injector
Jun 24 1997 07:07:04:890AMSteve WolfeEngineering setup:
-------------------
Power systems as on 970620037

Boronization overnight
ECDC for at least 1 hour in D2 before the run

Gas setup:
B-top: 6psi D2 Hybrid Enable
K-side: 20psi D2 Hybrid Enable
B-side lower 4psi Ar Hybrid Enable
J-bot 4psi N2 NOT ENABLED

Gate valves: ECE,VUV,TCX,PCX, if related diagnostics are at ok pressures.

We will want to ECDC between shots. Among other things, this means that the
F-port periscope (Weaver's periscope) should not be put in before the run.
Jun 24 1997 07:08:35:930AMSteve WolfeRun Plan
--------
We will start with a 1MA shot with NL4 set to 8e19 and outer gap of 1cm.

Things to try on startup:
Drop RCUR offset to <6000
Change RCUR waveform
Increase OH pre-programmed voltages
Decrease EF3 pre-programmed voltage
Drop EF4 pre-programmed voltage, delay EF4 swing
Symmetrize EF2's, and perhaps delay positive swing
I want to try these ideas at the beginning of the run, but may need to punt if
we aren't getting plasmas and the RF is ready to go.

First priority is to get the power out of the two antennas operating
together. Target is P>2.5MW.

We need to demonstrate access to H-mode after boronization. This requires
reasonably efficient heating, which may require better control of
H/(H+D). This will need to be monitored during the run; it is possible that
the boronization will solve the problem. If not, we will test between-shot
ECDC in D2.

The RF-loading feedback on RCUR needs to be demonstrated again. It would be
best to do this in H-mode, but it can be tested in L-mode if necessary.

If we get that far, we will increase the density and look for EDA
H-modes. These are required for the MP163 experiment, although development and
testing of the algorithm could be done without EDA. When ready, we will begin
puffing N2 from the J-bot valve under feedback control from the bolometer
signals.

We may also test the D pellet injector late in the shot on a few
discharges. The DPI is required if we decide to do MP158
Jun 24 1997 07:34:44:300AMSteve WolfePCS setup:
LOAD_FROM 970617031
Import seg1 from 97062037
Seg 2 changes: NL04 to 8e19
Seg1 changes:
RCUR offset to 6000
RCUR waveform to .653, constant
EF4_volt to 600,leave first non-zero point at -.003
OH1_volt to 180V from .005 to .015
OH2_volt to 10V from .005 to .015
copy V_ef2L ->V_EF2U
decrease pg4 puff from 32 to 22 (note that I should get 20% more gas due to higher pressure)
Load at 24-Jun-1997 07:29:26.00
Coldstart at 24-JUN-1997 07:32:31.26
Log file looks ok
Jun 24 1997 07:44:04:660AMSteve Wolfe We reduced the diborane bottle pressure by 71 psi during the
boronization last night --> 1038 Angstrom boron layer if uniformly
applied to the vessel surface.

Jun 24 1997 08:46:40:670AM970624001Steve WolfeShot 1: Tuesday test
Looks ok. Irby needs a cell access; left the NL4 signal on the scope.
Jun 24 1997 09:19:16:580AM970624002Steve WolfeShot 2:
PCS setup:
LOAD_FROM 970617031
Import seg1 from 97062037
Seg 2 changes: NL04 to 8e19
Seg1 changes:
RCUR offset to 6000
RCUR waveform to .653, constant
EF4_volt to 600,leave first non-zero point at -.003
OH1_volt to 180V from .005 to .015
OH2_volt to 10V from .005 to .015
copy V_ef2L ->V_EF2U
decrease pg4 puff from 32 to 22 (note that I should get 20% more gas due to higher pressure)
Long wait for EF2U to cool down.

Result:fizzle
bd at 5.6msec. lot's of density. Only 30kA.
RCUR show it inside and staying there
Br is slightly negative
Jun 24 1997 09:34:18:550AM970624003Steve WolfeShot 3:
RCUR offset to 5000
RCUR P-gain to 8 (from 2) at 6msec
Drop initial V_ef3 point from 2600V to 2400V

result: fizzle
similar, less density rise
Br is ramping down?
slow current rise, never gets anywhere.
IPRCUR error now near zero
Jun 24 1997 09:45:21:760AM970624004Steve WolfeShot 4:
Decrease pg4 to 18msec
result: fizzle
density down to 6e18,RCUR makes it a little further out, still not much current.
IpRCUR error now around +600
Ian's ZCUR is sitting around -7cm
Jun 24 1997 09:57:28:140AM970624005Steve WolfeShot 5:
Decrease pg4 to 15msec
result: plasma to 1.56sec,multiple H-modes
bd at 6msec, no overshoot on RCUR
current rise is still slow, lots of inner wall interaction on Halpha signal
IPRCUR error is at 1500 during hesitation

Jun 24 1997 10:13:23:960AM970624006Steve WolfeShot 6:
RCUR offset to 4000. pg4 to 13msec
Turn off Ar puff (per BLIP, for a baseline)
fizzle: earlier breakdown (5.2msec), poor current rise
IpRCUR is now negative
Jun 24 1997 10:28:10:460AM970624007Steve WolfeShot 7:
INcrease OH1 @1msec from 120->180,OH2 to 12V
fizzle: ZCUR still looks very negative?
Jun 24 1997 10:39:11:090AM970624008Steve WolfeShot 8:
Increase BR offset from .007 to .0075
fizzle. fields look better, but bd is later, back at 6msec.
It looks like we are not making it past the hesitation.
Try dropping the fill some more?
Jun 24 1997 10:47:52:630AM970624009Steve WolfeShot 9:
drop pg4 to 10msec!
fizzle. later bd (7msec), a little more current, still hangs inside.
Jun 24 1997 10:57:09:470AM970624010Steve WolfeShot 10: delay ef4 voltage swing from -.004 to 0.0
fizzle. Hardly any difference
Jun 24 1997 11:05:16:430AM970624011Steve WolfeShot 11: IC_ef4 from -1335 -> -1320
Magnet resistance fault:Nothing but TMX's, dud.

Jun 24 1997 11:16:27:500AM970624012Steve WolfeShot 12: IC_ef4 from -1335 -> -1320 (repeat)
fizzle bd@5msec, but no current rise.
Try an old shot, see if it's any better.
Jun 24 1997 11:18:32:490AM970624012Steve WolfeShot 12: IC_ef4 from -1335 -> -1320 (repeat)
fizzle bd@5msec, but no current rise.
Jun 24 1997 11:24:39:870AM970624013Steve WolfeShot 13: IC_ef4 from -1320 -> -1350
If this doesn't help, I'll revert to last Friday's shot 970620037 and see if that's any better.
fizzle. later bd (7.3msec) still no current rise
Back to Friday.
Jun 24 1997 11:37:13:200AM970624014Steve WolfeShot 14: Import seg 1 from 970620037
plasma - So much for improvements!
bd at 6.6msec, no hesitation, RCUR moves out to .65
Can't argue with success

Two solid H-modes. RF max power is 1.5MW
Note the big board says shot 13; some problem on FREDJR
Jun 24 1997 11:44:14:320AM970624015Steve WolfeShot 15: No changes
fizzle.
Jun 24 1997 11:57:35:360AM970624016Steve WolfeShot 16: pg4 from 32msec to 24 msec
fizzle. 45kA, RCUR turns around at 17msec.
Jun 24 1997 12:08:09:330PM970624017Steve Wolfeshot 17: decrease pg4 to 20msec
plasma - multiple H-modes.
RF still not running together.
Note that the RF_load input is not showing up on input 81
This startup looks like one of my earlier ones, long pause on inner wall, but then swings out ok.
Jun 24 1997 12:19:17:810PM970624018Steve Wolfeshot 18: Increase density to 1.0e20
plasma - multiple H-modes, including one long one (.865 to 1.03) that may be trying to get EDA
Only 1.2MW; RF still not running together.
Still a bad hesitation on current rise.
Jun 24 1997 12:29:33:580PM970624019Steve Wolfeshot 19: Increase density to 1.2e20
decrease pg4 to 16msec
fizzle. bd@5msec, RCUR turns around at 11msec
just try a repeat.
Jun 24 1997 12:38:55:530PM970624020Steve Wolfeshot 20: increase nl4 to 1.2e20 (repeat of 19)
fizzle. turns around at 15msec. H-alpha stays up.
Jun 24 1997 12:47:19:460PM970624021Steve Wolfeshot 21: Copy EF2L into EF2U
still trying to increase nl4 to 1.2e20
Magnet resistance fault.
I noticed an imbalance in the EF1 currents on shot 20, seems to be ZCUR2 controller
Note that the EF2's are in BR_0
Jun 24 1997 12:55:31:520PM970624022Steve Wolfeshot 22: Repeat of 21:
Copy EF2L into EF2U
still trying to increase nl4 to 1.2e20
fizzle. Magnetics errors on F13 and F14, BP14BC
early breakdown, h-alpha hangs up till 15msec, rcur turns around at 15msec
Jun 24 1997 12:56:39:770PM970624022Steve Wolfeshot 22: Repeat of 21:
Copy EF2L into EF2U
still trying to increase nl4 to 1.2e20
fizzle. Magnetics errors on F13 and F14, BP14BC
early breakdown, h-alpha hangs up till 15msec, rcur turns around at 15msec
Jun 24 1997 01:23:16:560PM970624023Steve Wolfeshot 23: import seg1 from shot 18
still trying to increase nl4 to 1.2e20
plasma - disruption at .71sec
errors on F13 and BP26_BC; outer gap is down to 4mm, may be due to bad f13 signal?
F13 "fixed itself at commutation" according to Bob.
BP26 looks ok, does have a small offset; doesn't matter, it's not used for anything.
EFIT has big chisq on F13 or maybe 14?
startup is terrible; current actually turns around, then comes back up.
I don't know why it disrupted; maybe an injection.
RF has a problem too: apparently the arc detector isn't shutting off one transmitter.
Jun 24 1997 01:33:47:450PM970624024Steve Wolfeshot 24: repeat, after RF makes a change in power room.
plasma - so much for disruption recovery!
Two h-modes, FMIT 2 is tripping out through the shot.
F13 is ok on this shot.
Long hesitation in current rise, pnly moves out to .63 meter; this one barely made it, but I'm
surprised it went at all.
Jun 24 1997 02:00:03:890PM970624025Steve Wolfeshot 25: Move Ar pulse to .5sec
Put N2 pulse at .8 sec, for 60msec (PG2=Jbot)
Mike will remove the demodulator on FMIT2, and try to fix it outside.
Meanwhile we will run with D-port.
fizzle. turns at 17msec
Just try again.

Jun 24 1997 02:07:35:980PM970624026Steve Wolfeshot 26: No change
Move Ar pulse to .5sec
Put N2 pulse at .8 sec, for 60msec (PG2=Jbot)
plasma
bd before 5msec; still hesitating, not as bad this time; gets out to .65 at 30msec
RF faulting continuously, peaks around 1.2MW, no H-modes

Jun 24 1997 02:26:09:630PM970624027Steve Wolfeshot 27: INcrease jbot pulse to 80msec, 100V (from 90).
[g] will fire pellet into target this shot (plasma or not).
fizzle; this one barely makes it off the wall, max RCUR=.55

Jun 24 1997 02:32:14:400PM970624028Steve Wolfeshot 28: No change
INcrease jbot pulse to 80msec, 100V (from 90).

plasma. 4 ELM-free h-modes
I'm looking at an imbalance in the EF1's. I don't see where it is coming from, since ZCUR is
not supposed to come on until .034 sec
Jun 24 1997 02:46:09:340PM970624029Steve Wolfeshot 29: pellet set for 1.15 sec
jbot to 100msec
fizzle. late breakdown (10msec)
Jun 24 1997 02:57:27:380PM970624030Steve Wolfeshot 30: BR from .007 to .0065
fizzle. bd back at 5msec, rcur turns around at 13msec
Jun 24 1997 03:05:25:410PM970624031Steve Wolfeshot 31: no changes, still waiting for a pellet and 100msec on Jbot
plasma - disrupts at 1.47, pellets at 1.15 and 1.4
lots of little h-modes. D-port is faulting like mad.
startup looks better, little hesitation.
Jun 24 1997 03:23:03:360PM970624032Steve Wolfeshot 32: no changes. Mike re-installing demodulator
fizzle. looks like inner wall again. I still can't find the ef1l imbalance
The Vouts are identical
Jun 24 1997 03:35:22:080PM970624033Steve Wolfeshot 33:
Ar back to .3sec, set pg4 to pulse full on from .7 to 1.0sec, no feedback
fizzle. bd at 6.5msec
Jun 24 1997 03:51:13:400PM970624034Steve Wolfeshot 34: turn off integrator C at 0.sec in seg 1; see if this is responsible for EF1 imbalance
Ar back to .3sec, set pg4 to pulse full on from .7 to 1.0sec, no feedback
fizzle:very late breakdown (12msec)
Ratiomatic pressure looks very high?
Big pressure burst at -1.6sec? Is it Martin's gate valve?
EF1 demands now equal; must have been the integrator!


Jun 24 1997 04:32:47:760PM970624035Steve Wolfeshot 35: repeat with PI gate valve closed.
Ar back to .3sec, set pg4 to pulse full on from .7 to 1.0sec, no feedback
plasma: no pressure burst. breakdown at 5msec
still hesitates, EF1 demands match until 35msec when ZCUR feedback comes on.
Rejean reports 6% H/(H+D)
Jun 24 1997 04:13:34:610PM970624036Steve Wolfeshot 36: repeat with PI gate valve open, but wait for G to start a pump cycle.
D-port only, There is a major problem with E-port transmitter.
J-bot seemed to be opening on previous couple of shots.
base=1.4e-6,
result: plasma to 1.56 sec, rf got 400kW. pellets
pressure burst at -1.6sec gives 3e-6 gage
Jun 24 1997 04:26:23:910PM970624037Steve Wolfeshot 37: no changes
Joe moves fast window to catch snake; longer pump-out this time.
fizzle; stil can't do 3 in a row!
later bd, 6.3sec, rcur turns around at 10msec!
Jun 24 1997 04:38:27:440PM970624038Steve Wolfeshot 38: jbot pulse from 100->125msec
G is moving his valve opening earlier.
plasma. H-modes, got pellet, RF faulting during h-mode
less hesitation
Jun 24 1997 04:52:42:140PM970624039Steve Wolfeshot 39: jbot pulse to 75msec, increase pressure in Jbot to 8psi.
continue pellets for benefit of JR, who sees a change in rotation.

fizzle. bd ok, turns in at 13.5 msec
Jun 24 1997 05:04:45:340PM970624040Steve Wolfeshot 40: no change
jbot pulse to 75msec, increase pressure in Jbot to 8psi.
continue pellets for benefit of JR, who sees a change in rotation.
fizzle.
Jun 24 1997 05:16:13:250PM970624041Steve Wolfeshot 41: gas test only (for BLIP et al.)
B-side lower standard pulse. All other valves disabled.
fizzle detector start to 1.08 sec
Jun 24 1997 05:20:10:330PM970624042Steve Wolfeshot 42: gas test only (for BLIP et al.)
200msec pulse from B-side lower .301-.501
pressure rise to 8e-5 on ITG

Engineering Operator Comments
ShotTimeTypeStatusComment
108:39:48:850AMTestOkTues. OH Test OK
209:10:38:040AMPlasmaOk
309:26:29:940AMPlasmaOk
409:38:20:910AMPlasmaOk
509:50:19:220AMPlasmaOk
610:05:26:930AMPlasmaOk
710:17:17:320AMPlasmaOk
810:32:39:720AMPlasmaOk
910:44:00:190AMPlasmaOk
1010:52:21:300AMPlasmaOk
1111:02:33:960AMPlasmaOk
1211:10:06:720AMPlasmaOk
1311:21:10:630AMPlasmaOk
1411:28:24:530AMPlasmaOk
1511:40:28:810AMPlasmaOk
1611:52:30:520AMPlasmaOk
1712:02:05:270PMPlasmaOk
1812:13:25:360PMPlasmaOk
1912:25:17:960PMPlasmaOk
2012:35:00:270PMPlasmaOk
2112:42:24:670PMPlasmaOk
2212:49:34:460PMPlasmaOk
2301:00:43:880PMPlasmaOk
2401:24:33:590PMPlasmaOk
2501:54:13:910PMPlasmaOk
2602:01:50:830PMPlasmaOk
2702:16:31:950PMPlasmaOk
2802:27:05:140PMPlasmaOk
2902:37:33:460PMPlasmaOk
3002:49:25:830PMPlasmaOk
3102:59:12:780PMPlasmaOk
3203:11:30:050PMPlasmaOk
3303:28:49:280PMPlasmaOk
3403:38:20:420PMPlasmaOk
3503:51:51:650PMPlasmaOk
3604:07:43:800PMPlasmaOk
3704:19:53:380PMPlasmaOk
3804:32:07:870PMPlasmaOk
3904:48:40:210PMPlasmaOk
4004:59:26:010PMPlasmaOk
4105:07:33:070PMTestOk
4205:18:26:920PMTestOk
4305:25:47:720PMTestOk