Alcator C-Mod Run 971208 Information

Back to runs

Miniproposals
Miniproposal:148
Date Filed: 7/16/1996
Title:RF Conditioning and Testing
First Author:Yuichi Takase
Session Leader:Steve Wukitch (shots 1-18)
Miniproposal:170a
Date Filed: 5/13/1997
Title:Restart Operation: May 1997
First Author:Robert Granetz
Session Leader:Robert Granetz (shots 1-18)

Operators
Session leader(s):Steve Wukitch,Robert Granetz
Physics operator(s):Steve Wolfe
Engineering operator(s):Vinny Bertolino,Frank Silva,Bill Cochran

Engineering Operator Run Comment
Alternator start up/MP: 170A, 148

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:17:430PM
Author: To Be Determined
Run summary for first part of 971208

MP 170A, Start-up plasma operation
MP 148 , RF conditioning

SL: Granetz/Wukitch
PO: Wolfe
EO: Bertolino, Cochran

Summary:

Scorecard: plasmas
fizzles
duds
tests
----------
total

------------------------------------------------------------------------------
Detailed shot log:

Shot 01 -- TF test. Dud.

Shot 02 -- TF test, 50 kA. Good

Shot 03 -- TF test, 100 kA. Good

Shot 04 -- TF test, 150 kA. Good

Shot 05 -- OH test. 10 kA. Good.

Shot 06 -- Dud. Multiple power supplies failed to fire, because we had to
pull out of the cycle and restart it again.

Shot 07 -- Dud. Multiple power supplies failed to fire.

Shot 08 -- Plasma. Good shot. Ip=0.8 MA, duration=1.64 s. nl_04=1.1e20.
Prf=0.15 MW.

Shot 09 -- Plasma. Good shot. Ip=0.8 MA, duration=1.60 s. nl_04=1.1e20.
Prf=0.25 MW.

Shot 10 -- Plasma. Good shot. Ip=0.8 MA, disrupted at 1.46 s. Prf=3+ MW.
Got H-mode from 1.05 to 1.2 s.

Shot 11 -- Plasma. Good shot. Multiple short H-modes. Prf up to 3 MW.

Shot 12 -- Plasma. Good shot. Multiple short H-modes. Prf up to 3 MW.

Shot 13 -- Plasma. Good shot. ** Ip=1.0 MA ** Prf reaches almost 4 MW.

Shot 14 -- Fizzle.

Shot 15 -- Plasma. Good shot. Ip=1.0 MA.

Physics Operator Summaries
Entered: Jul 7 2004 04:36:58:083PM
Author: To Be Determined
Physics Operator Summary for 971208

MP#170A Startup
MP#148 RF conditioning

SL: Granetz, Wukitch
PO: wolfe
EO: silva,bertolino,cochrane

Run Plan:
--------

Part 0: Run power supply and alternator tests as required by engineering. At
minimum, the TF supply should be exercised under PLC control to verify
operation of the new cabinet#1 circuits. Verify that hybrid programming
signals are appearing at all supply cabinets and gas valves. It should not be
necessary to carry out hybrid tests on individual power supplies prior to
integrated test (i.e. plasma attempt).

Part 1: MP 170A (Establish plasma operation). The goal will be to get plasmas
and verify operation of diagnostics. During this phase, RF may be pulsed if
desired.

We will start with a segment 1 from 971104030 and segment 2 from 971105027
(800kA, outer gap ~1cm). Note that this shot has RF_LOAD feedback on, so have
to verify the RF gate is off. Tweak and twiddle to get breakdown, verify
shape. RF can fire if it wants to.

If/when we aren't having disruptivity problems, increase current to 1MA, for
instance using segment 2 from 960116027. Tweak gap and x-point location to
taste. Use this as RF conditioning target.

Part 2: MP148A (RF conditioning) Bang away till the RF gets to acceptable
power levels, staying on, with both transmitters running together. Hopefully,
this will provide good quality H-modes, perhaps EDA (like the basis shot
960116027). Continue running shots as required for RF and diagnostic
alignment, checkout.
------------------------------------------------------------------------------
Engineering setup for 971208 (after engineering "part 0"):

Two hours of ECDC in deuterium before the run, if possible.

Engineering setup as on 971105027, with TF under hybrid control

Gas setup - fill K-side with 20 PSI of D2, hybrid enable
fill B-top with 6 PSI of D2, hybrid enable
fill B-side-lower with 3 PSI of Ar, hybrid enable

The following gate valves should be enabled, assuming no vacuum problems:
ECE (no others until we verify the status of each system)

Results:
-------

The plan was largely accomplished, after several delays in getting started.
Plasma current was successfully increased to 1MA and the RF power was brought
up to 3.9MW (!) although it was not possible to maintain the RF pulse constant
at high power levels without faults. Nevertheless, a good start was made on
the RF conditioning and tuning. H-modes were readily obtained, with some
indication of EDA while the RF stayed on on some shots. All shots were run
with RF_load feedback turned on, at a gain of -1500.

Plasma startup was quite reliable, with only one fizzle. The sparker was run
all day, but the improvement over November may be due to the removal of the
saturating input_58 to the hybrid following the 971105 run, as described
elsewhere. All plasmas ran well into ramp-down.

Details:
----------

We had originally planned to begin operation at 10AM, but problems with
getting the alternator started on turning gear delayed the first shot to
11:30.

Shot 1 was programmed as a 50KA TF pulse under PLC control; it failed with a
low PT indication, for unknown reasons. Shot 2 was just a repeat and ran
nominally. Shots #3 and #4 were TF pulses at 100ka and 150kA respectively;
both ran correctly, with no alternator or other difficulties. In the course of
these shots we verified that all the hybrid signals were appearing properly at
the power supplies. Shot 5 was a standard "Tuesday" oh coax resistance test,
with the addition of testing the pulse gas for K-side and B-top under hybrid
control; these tests all succeeded. This completed part 0, the engineering
tests.

Shot 6 was the first plasma attempt. On the first attempt, an oil
overtemperature fault appeared during INIT, and we ended up backing out of the
shot (INIT->RECOOL). After a delay during which the overtemp fault was dealt
with, shot 6 was run through, but several supplies (OH1,EF1's, TF) did not
fire. We have experienced this effect before, i.e. when we back out of a shot
something is not properly reset and the subsequent attempt at the same shot is
missing one or more supplies. It would be nice to figure out why.

Before we could take shot 7, it was noticed at the alternator that the
explosive fuses had not been reconnected after the last round of alternator
tests. At first it was thought that it would be necessary to cancel the run
and bring the alternator back down to turning gear in order to reconnect these
fuses, but it turned out to be possible to remedy the situation without
bringing the alternator down. The turnaround ended up taking about an
hour. Shot 7 was another plasma attempt, but the air switch opened due to an
incorrectly set air valve, resulting in no 13.8 supplies firing.

Finally on shot 8 all supplies fired properly, and we got a full length plasma
(1.6+ sec), complete with small rf pulses from both antennas. After that, we
were off and running.

Shot 9: enabled the Ar pulse for Hirex, and JR also turned on the shit shooter
(1.3sec) to look at C injection using the U.Texas slide. RF power increased on
both transmitters. A small injection was observed on the 2pi at the time of
the laser blow-off.

Shot 10: Moved the segment 1 PG3 gas puff earlier (from 33msec to 28msec) to
get rid of hards observed on #8,9. Increased Ar pulse and moved C pulse to
1.0sec. Plasma shortened to 1.46 sec (Ar effect) but RF got up to 3MW in a
ramp-up pulse. Good H-mode late in pulse. Irby, et al. report that the TTCI is
working. Hards eliminated. The TCI is showing a lot of hash on the analysed
signal, but the feedback input is fine.

Shot 11-12: repeat for RF; JR moving laser blow-off pulse. On shot 12 moved Ar
puff to .6sec for Goetz. RF still faulting at 3MW level, lots of h-modes.

Shot 13: Increase current to 1MA. I started to do this by loading 960116027,
but noted that this would require recalculating predictors to account for
change of BP12 input signal, so I just drew the Ip trace to 1MA. Note that
there may still be some differences in the equilibrium from the
high-performance shots. The plasma ran fine (to 1.56sec) and the RF reached
3.9MW! Wplasm got to 156kJ and rising at about .5MW when the RF faulted.

Shot 14: was a repeat that fizzled. All I could see was that there might have
been a slight increase in Br over the previous n shots, so I reduced the Br
offset from 7mT to 6.5mT.

Shot 15-18: were good 1MA shots with H-modes. The RF was still not
staying on at the high power level, but reasonable h-mode durations were
obtained.


Problems:
--------

Once we got started, all systems performed quite reliably. We had 11 shots (10
full length) in less than 2.5 hours, so cooling was not a major issue. We
again experienced the back-out problem, with several supplies not firing after
an INIT->RECOOL->INIT->CHECK->PULSE sequence. Also, the TCI interferometer
analyzed outputs had a lot of noise/hash; after the run, Jim determined that
this was due to a problem in one of the HeNE fringe counter/digitizer
channels. Bob Granetz was running his automatic x-ray pedestal calculation on
Barolo batch queue, and later in the day it backed up and began delaying EFIT
and other jobs; for the last shot he changed it to another queue.

Note: There are new regulator circuits in TF Cabinet 1. On the "150KA" TF test
Vinnie noted that the usual PLC setting (156) only gave 5.2T, implying a
change in the offset. However, the hybrid programming (150000.) gave 5.4T,
perhaps a couple kA more than previously.

Scorecard:
---------
Tests: 5
Duds: 2 (power supply non-fires)
Fizzles: 1
Plasmas:10
======= ==
Total 18




Session Leader Comments

Physics Operator Comments
Dec 8 1997 06:29:17:860AMSteve WolfeRun Plan for Monday, 971208

MP: 170A Start-up and 148 RF conditioning
SL: Granetz (part 1)
Wukitch (part 2)
PO: wolfe

Part 0: Run power supply and alternator tests as required by engineering. At
minimum, the TF supply should be exercised under PLC control to verify
operation of the new cabinet#1 circuits. Verify that hybrid programming
signals are appearing at all supply cabinets and gas valves. It should not be
necessary to carry out hybrid tests on individual power supplies prior to
integrated test (i.e. plasma attempt).

Part 1: MP 170A (Establish plasma operation). The goal will be to get plasmas
and verify operation of diagnostics. During this phase, RF may be pulsed if
desired.

We will start with a segment 1 from 971104030 and segment 2 from 971105027
(800kA, outer gap ~1cm). Note that this shot has RF_LOAD feedback on, so have
to verify the RF gate is off. Tweak and twiddle to get breakdown, verify
shape. RF can fire if it wants to.

If/when we aren't having disruptivity problems, increase current to 1MA, for
instance using segment 2 from 960116027. Tweak gap and x-point location to
taste. Use this as RF conditioning target.
Dec 8 1997 06:31:26:190AMSteve WolfePart 2: MP148A (RF conditioning) Bang away till the RF gets to acceptable
power levels, staying on, with both transmitters running together. Hopefully,
this will provide good quality H-modes, perhaps EDA (like the basis shot
960116027). Continue running shots as required for RF and diagnostic
alignment, checkout.
------------------------------------------------------------------------------
Engineering setup for 971208 (after engineering "part 0"):

Two hours of ECDC in deuterium before the run, if possible.

Engineering setup as on 971105027, with TF under hybrid control

Gas setup - fill K-side with 20 PSI of D2, hybrid enable
fill B-top with 6 PSI of D2, hybrid enable
fill B-side-lower with 3 PSI of Ar, hybrid enable

The following gate valves should be enabled, assuming no vacuum problems:
ECE (no others until we verify the status of each system)
Dec 8 1997 06:48:58:950AMSteve WolfeImport Segment 1 from 971104030
Load/clean
Silva starting CYCLE 06:35
Coldstart 06:38 - Logs ok.

Silva reports alternator should be ready by 10:00 AM
Dec 8 1997 09:14:50:540AMSteve WolfeIt will be until 11AM before alternator is ready,
Take a hybrid test shot
#372: Got no logical name match error:
%SYSTEM-F-NOLOGNAM, no logical name match
%SYSTEM-F-NOLOGNAM, no logical name match
% Compiled module: MDS$VMS_ERROR.
%C-F-LONGJMP, longjmp requested
%C-F-LONGJMP, longjmp requested
% XMANAGER: Caught unexpected error from client application. Message follows...
% CALL_EXTERNAL: Error in called routine.

Try doing a REMCAM.
Try hybrid_control again, shot 373
Mout ok, inputs look ok.
Dec 8 1997 11:12:12:400AMSteve WolfeLoad Segment 2 from 971105027 seg 2 (almost forgot)
Dec 8 1997 11:33:33:110AM971208001Steve Wolfeshot 1:
50kA TF under PLC control
Breakers pulled. no current.
Dec 8 1997 11:55:39:170AM971208002Steve Wolfeshot 2:
try again: 50kA TF under PLC control. Shot 1 had a low pt voltage indication.
This time it worked.
Dec 8 1997 12:09:01:050PM971208002Steve Wolfeshot 2:
try again: 50kA TF under PLC control. Shot 1 had a low pt voltage indication.
This time it worked.
I'm seeing a .04 to .01V signal on the RF load signal
I'm also seeing a -.1V offset on BP21_bc
Dec 8 1997 12:10:29:870PM971208004Steve Wolfeshot 3:
100kA TF test. ok
Bp21_BC signal is similar to 971105027. Offset is ok on magnetics signal, so it may be an isoamp
problem
Dec 8 1997 12:15:02:580PM971208004Steve Wolfeshot 4:
150kA TF test. ok.
On shot 3, Vinnie set up to look at hybrid inputs to the EF and oh supplies. They look ok.
Dec 8 1997 12:28:04:020PM971208005Steve Wolfeshot 5:
Tuesday oh test.
Also enable K-side and B-top to check gas.
10kA oh shot ok
Got gas, got outputs from both valves.
Note: on shot 4 we got a gasburst at .72sec to 1.e-6. Can't see it on this one for the real gas.
Dec 8 1997 01:07:06:960PM971208006Steve Wolfeshot 6:
Go for plasma.
Alternator fault indication during INIT. Oil temperature fault. Back out of INIT->RECOOL

Try again-
No OH1,EF1, TF.
Dec 8 1997 01:28:36:210PM971208006Steve WolfeBefore shot 7, it was noticed at the alternator that the explosive fuses were never
reconnected. It is not considered safe to operate without them. It may be necessary
to run the alternator all the way down in order to reconnect them safely.
Dec 8 1997 02:10:48:450PM971208007Steve WolfeShot 7: Try for plasma again, after resetting everything. The run had been cancelled, but then
re-started. Explosive fuses have been reconnected.
Still not asking for the Argon pulse.

Air switch opened. Only EF2's and EFC fired.

Dec 8 1997 02:27:27:830PM971208008Steve WolfeShot 8: Try for plasma
Plasma to 1.64 sec. Two bursts of vertical instability at.22 and 1.1sec
RF ran, .15MW.
Lots of Moly injections. Looks like some hards.
bd at 5.6msec, some hesitation.
Dec 8 1997 02:39:07:060PM971208009Steve WolfeShot 9: Repeat. Turn on Argon pulse.
Shit Shooter enabled (C) at 1.3sec.
plasma to 1.59sec. Late vertical burst gone this time.
Still a burst of hards.
RF to .3 and .2
Got a small spike on 2pi at 1.3.
JR is whining about insufficient Ar.
Dec 8 1997 02:58:41:180PM971208010Steve WolfeShot 10: Increase Ar pulse to 28msec
Move PG3 pulse 5msec earlier.
Let C injection happen at 1.0sec

plasma to 1.46 sec
H-mode late. RF gets to 3MW
gets to 110kJ, still rising.
TTCI is working (According to Irby)
Small signal on 2pi at C injection again
Hards seem better, late signal is neutrons, I think.
Dec 8 1997 03:11:22:510PM971208011Steve WolfeShot 11: repeat for RF. JR may change injection.
plasma to 1.5sec.
MUltiple H-modes. RF faulting ; Steve says it's because he asked for too much power.
Dec 8 1997 03:35:39:650PM971208012Steve WolfeShot 12: Move Ar pulse to 0.6sec for Goetz.
Long delay for cooling before this shot.

plasma : multiple H-modes. Rf faulting again, after short 3MW pulse.
Going to 1MA next shot.
Dec 8 1997 03:53:53:980PM971208013Steve WolfeShot 13: Change to 1MA.
Started to do it by reloading 960116027, but it would need all the predictors changed, so
reload 12 and just draw the Ip to 1MA
Move Ar pulse back to .3 sec

plasma - 1.56 sec, 1MA.
RF to > 3.8MW
Record high edge xray signals - RSGranetz
156kJ and rising when the RF faults.
Dec 8 1997 04:08:49:150PM971208014Steve WolfeShot 14: repeat.
fizzle. Maybe a small br drift? It seems to be swinging negative.
Dec 8 1997 04:21:42:100PM971208015Steve WolfeShot 15: Br offset from .007 to .0065
plasma - 1.56 sec
multiple h-modes, rf still faulting.
Dec 8 1997 04:32:44:510PM971208016Steve WolfeShot 16: repeat, rf still tuning
plasma: 1.54sec
one long h-mode, modulated by rf faults.
only 140kJ and falls through shot.
Granetz' xray fitting program is lagging by a shot on barolo batch queue, beginning to back up
EFIT job.
Dec 8 1997 04:52:11:660PM971208017Steve WolfeShot 17: repeat, rf still tuning
plasma to 1.51 sec
Dec 8 1997 05:02:26:450PM971208018Steve WolfeShot 18: repeat, rf still tuning
ECE fast trigger to .8sec (using fast_control)
plasma to 1.56 sec, RF faults a little worse, 2 H-L periods.

Engineering Operator Comments
ShotTimeTypeStatusComment
111:25:46:130AMTestBadLOW AC FAULTS
211:48:58:190AMTestOk
311:57:22:130AMTestOk
412:10:16:650PMTestOk
512:22:34:870PMTestOk
612:35:36:690PMPlasmaBadSOME SUPPLIES MISSING
702:07:44:500PMPlasmaBadair switch opened
802:15:14:950PMPlasmaOk
902:30:12:430PMPlasmaOk
1002:46:21:220PMPlasmaOk
1103:04:58:200PMPlasmaOk
1203:28:36:920PMPlasmaOk
1303:47:32:950PMPlasmaOk
1404:00:18:360PMPlasmaOk
1504:12:22:680PMPlasmaOk
1604:22:59:540PMPlasmaOk
1704:37:12:910PMPlasmaOk
1804:53:18:910PMPlasmaOk