Alcator C-Mod Run 990518 Information

Back to runs

Miniproposals
Miniproposal:245
Date Filed: 3/31/1999
Title:Dependence of Main Chamber Recycling on Plasma Density
First Author:Maxim Umansky
Session Leader:Brian Labombard (shots 1-17)

Operators
Session leader(s):Brian Labombard
Physics operator(s):Ian Hutchinson
Engineering operator(s):Frank Silva

Engineering Operator Run Comment
MP245/MP242 Hutch/Silva

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries
Entered: Jul 7 2004 04:37:01:160PM
Author: To Be Determined
This run was to have been a study of neutral effects etc
248 and 242.

However, we never got to a plasma. Ultimately the OH2U switch
which was not opening and blew some fuses needed to be diagnosed
in detail by engineering.

We hope this can be done during the rest of the day but tomorrow's
run is as yet uncertain till the switch problem is identified.

Session Leader Comments
May 18 1999 09:05:23:607AMBrian LabombardPlan for first half of tuesday's run:
MP#245 "Dependence of Main Chamber Recycling on Plasma Density"

Purpose: See if the regime of strong main chamber-wall recycling persists
in very low core plasma density discharges.

Plan: First try to run some very low density 0.8 MA ohmic discharges
(NL04 < .2?!) and then do a density scan.

Discharge cleaning:
No ECDC. Base pressure is presently in the mid -9 range. The walls are
degassed well enough now.

Gas system setup:
- Install ethylene bottle (for piggy-back plume studies) in position SG5.

Target Plasmas:
All plasmas will be 0.8 MA, 5.3 Tesla, diverted, ohmic
shots (similar to 990429027) with optimized FSP target,
and inner/outer gaps of 1.5 to 2 cm.

Shot Sequence Plan:

1 Start from 990429027 with density programmed to NL04=0.6x10^20.
Set up flappers to open at 0.9 seconds.

2-4 Turn gas down or off to obtain NL04 as low as we dare. Monitor hard x-rays,
watch for twinkling pixels on the video cameras.

5-6 Repeat lowest density shot. Insert FSP and ASP scanning probes. Also do some pluming.

7-14 Begin upwards density scan. Do FSP/ASP and plumes. End with two shots at NL04~ 1.2

Physics Operator Comments
May 18 1999 08:36:13:500AMIan HutchinsonRecyling Experiments.
MP#245 "Dependence of Main Chamber Recycling on Plasma Density"
MP#242 "Main chamber pressure dependence on right gap.

LaBombard's Plan:

Discharge cleaning:
No ECDC. Base pressure is presently in the mid -9 range. The walls are
degassed well enough now.

Gas system setup:
- Install ethylene bottle (for piggy-back plume studies) in position SG5.

Target Plasmas:
All plasmas will be 0.8 MA, 5.3 Tesla, diverted, ohmic
shots (similar to with optimized FSP target,
and inner/outer gaps of 1.5 to 2 cm.

Shot Sequence Plan:

1 Start from 990429027 with density programmed to NL04=0.6x10^20.
Set up flappers to open at 0.9 seconds.

2-4 Turn gas down or off to obtain NL04 as low as we dare. Monitor hard
x-rays,
watch for twinkling pixels on the video cameras.

5-6 Repeat lowest density shot. Insert FSP and ASP scanning probes. Also
do some pluming.

7-14 Begin upwards density scan. Do FSP/ASP and plumes. End with two shots
at NL04~ 1.2

Coldstart.
Load 990429027.
Lower nlo4 to 6.e20
May 18 1999 11:19:40:843AM990518010Ian HutchinsonFirst plasma attempt.

OH2 upper did not commutate.
Bz is a bit negative, perhaps.
May 18 1999 11:22:25:153AM990518011Ian HutchinsonRepeat. Same thing happens again.
May 18 1999 02:07:24:153PM990518011Ian HutchinsonAfter examination of the switch some blown fuses are found. However there
is no obvious reason the switches are not opening. Therefore after some
further struggles the run is canned.

Engineering Operator Comments
ShotTimeTypeStatusComment
108:09:30:780AMTestBad
208:09:37:433AMTestOk(null)
308:31:41:810AMTestBad
409:42:38:390AMTestOkEF1 Upper test only okay
509:53:47:123AMTestOkEF1 Lower test only Okay
610:04:29:233AMTestOkOH coax test only Okay
710:15:02:750AMTestOkTF test only 50kamps ,1 second okay
810:34:35:890AMTestOkEFC chopper test only, 400v, 1.25kamps OK
910:47:55:217AMTestOkEF4 Double swing test via hybrid
1011:02:21:450AMPlasmaBadOH2 switch did not close
1111:20:23:420AMPlasmaBadOH2 upper fault no commutation
1206:59:17:170PMTestOkOH2U Commutation Switch Test
1307:08:51:060PMTestOkOH2U Commutation Test
1407:18:16:887PMTestOkOH2U Commutation Test
1507:28:33:920PMTestOkOH2U Commutation Test
1607:37:47:140PMTestOkOH2U Commutaion Test
1707:47:22:187PMTestOkOH2L Commutation Test