| Miniproposals | ||||||||||
|
| Operators | |
| Session leader(s): | Robert Granetz |
| Physics operator(s): | Dmitri Mossessian |
| Engineering operator(s): | Unknown |
| Engineering Operator Run Comment |
| Start up/Granetz |
| Session Leader Plans |
| Physics Operators Plans |
| Session Leader Summaries |
| Physics Operator Summaries |
| Session Leader Comments |
| Physics Operator Comments | |||
| Jul 15 1999 11:29:23:340AM | Dmitri Mossessian | Getting ready for EF4 test under Hybrid control. Loaded 990527002 that has the required EF4 swing programmed in segment 1. All other segments are OFF. Coldstart OK. PCS ready for EF4 test. | |
| Jul 15 1999 12:44:33:293PM | 990715001 | Dmitri Mossessian | Before doing EF4 test the gas system will be tested. Loaded 990528001. Turned segment 2 off, B-top valve is PLC enabled. We should have the prepuff only on this shot. |
| Jul 15 1999 12:56:27:607PM | 990715002 | Dmitri Mossessian | Gas is OK. Disable B-top on this shot. |
| Jul 15 1999 01:00:41:263PM | 990715003 | Dmitri Mossessian | Loaded shot 990527002 for EF4 test. |
| Jul 15 1999 01:27:47:340PM | 990715004 | Dmitri Mossessian | PLC controlled EF4 test |
| Jul 15 1999 01:32:00:107PM | 990715005 | Dmitri Mossessian | PLC controlled EF4 reversed test |
| Jul 15 1999 03:28:07:077PM | 990715015 | Dmitri Mossessian | Loaded shot 990526005 - 0.8 MA, 1.oe20 m^-2 flattop Ready for plasma shot |
| Engineering Operator Comments | ||||
| Shot | Time | Type | Status | Comment |
| 1 | 12:31:28:123PM | Test | Ok | No Faults |
| 2 | 12:55:11:653PM | Test | Bad | EF2 Oscillation |
| 3 | 01:07:01:373PM | Test | Ok | EFC test only, no faults |
| 4 | 01:24:35:750PM | Test | Ok | ef4 forward test only ,no faults |
| 5 | 01:32:34:230PM | Test | Ok | EF4 reverse Bridge OK |
| 6 | 01:44:56:593PM | Test | Ok | ef4 double swing test only, no faults |
| 7 | 01:56:59:107PM | Test | Ok | EF3 PLC power test OK |
| 8 | 02:11:00:310PM | Test | Ok | power supplys did not fire |
| 9 | 02:24:47:640PM | Test | Ok | OH1, OH2u,l 10ka test OK |
| 10 | 02:32:38:153PM | Test | Ok | OH cmmutation test OK |
| 11 | 02:44:53:763PM | Test | Ok | EF1 u,l power test |
| 12 | 02:53:11:247PM | Test | Ok | EF1 u,l commmutation test |
| 13 | 03:01:50:950PM | Test | Ok | EF1 u,l reverse bridge test |
| 14 | 03:10:01:030PM | Test | Bad | no pulse TF test NG control panel tf off |
| 15 | 03:17:43:873PM | Test | Ok | 50 KA TF test OK |
| 16 | 03:29:43:670PM | Test | Ok | 100 KA TF test OK |