Alcator C-Mod Run 990817 Information

Back to runs

Miniproposals
Miniproposal:214
Date Filed: 1/5/1999
Title:D and E-port RF System Commissioning
First Author:Steve Wukitch
Session Leader:Rejean Boivin (shots 1-16)
Session Leader:Steve Wukitch (shots 1-16)

Operators
Session leader(s):Rejean Boivin,Steve Wukitch
Physics operator(s):Dmitri Mossessian
Engineering operator(s):Frank Silva

Engineering Operator Run Comment
MP #214 RF Conditioning/Mosseian, Silva

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries
Entered: Jul 7 2004 04:37:08:223PM
Author: To Be Determined
Physics operator summary for run 990721:

PO: D. Mossessian
SL. S. Wukitch
_________________________________________________

Run plan for 990817:

MP 214 -- RF conditioning
Start from shot 990816005. Continue RF conditioning.

Setup power supplies from shot 990806009 (1 MA, 5.4 T, flattop to 1.4 s)

Two hours of ECDC in D2 prior to the run.

Gas setup - fill B-top with 6 psi of D2 Hybrid enabled
fill B-side lower with 1 psi of Ar Hybrid enabled
fill B-side upper with 6 psi of H2 Hybrid DISABLED
fill C-side with 30 psi of D2 Hybrid enabled
leave J-bottom as is Hybrid DISABLED

The following gate valves should be enabled, assuming no vacuum problems:
ECE, VUV

____________________________________________________________________

Summary:

The goal, as usual, was to get maximum RF power out of J-port.
The run was delayed at RF's request and then delayed again because of EF4 problems.
The run started around noon.
The machine ran well, with all the plasma but one running to ~1.8 sec. When RF
power climbs higher than 1MW it seem to produce massive injections. Only one shot,
however, disrupted due to an injection. The disruption was followed by a fizzle,
resulting from change in Br. Decreasing Br offset produced the desirable result - last
shot (990817016) was a good long plasma.

Scorecard:

16 shots
4 tests/power supply problems
10 plasmas
2 fizzles
______________________________________________________________________________

990817001 Shot #1 did not go - UPS shut down and CAMAC had to be reset.
No power supplyes on this shot.

990817002 First plasma attempt. RF off.
Not successful - EF4 power supply did not go..

990817003 Problems with EF4. Shot aborted.

990817004 No power shot

990817005 Plasma. RF off.
Slight current hesitation at the beginning. Late disruption at 1.8 sec.
No PCS changes for next shot.

990817006 RF ON on this shot.
Fizzle.
Increased Bz by setting EF4 at 0 sec to -1260 A (was -1280 A)
(assuming conversion is 15A/mT)

990817007 Plasma. Very large injection at .57 sec, not connected with RF.
Increased Ar (Pulse gas 1) to 35 msec (from 30) for next shot.

990817008 Good plasma.

990817009 Increased Ar by another 5 msec for this shot (now 40 msec total)
Plasma.
Two large injections at .77 and .97 sec, probably associated with RF.

990817010 Plasma. No PCS change.

990817011 Plasma. No PCS change.

990817012 Plasma. No PCS change.

990817013 Set Ar (pulse gas 1) back to 35 msec from 40 msec.
Plasma. Divertor bypass open from 1.15 sec.

990817014 Plasma. Disrupted at .79 sec due to RF-caused injection.

990817015 Fizzle.
Br went up about 2 mT.
Lowered Br offset by 1.5 mT for next shot.

990817016 Plasma. Massive injection coinciding with RF pulse.


Session Leader Comments
Aug 17 1999 09:05:02:983AMRejean Boivin

MP 214

Continuing improving reliability of 3 and 4.

Yesterday we found saturation in power output
from some of the power supplies in the power train.
They have been replaced/substituted and we will
try to push for more power. We can then move
to better understand and control the feedback
system. In addition, the power "meters" have been
recalibrated and should reflect more adequately
the system output.

Plasmas should be the same as in recent past.
Aug 17 1999 03:04:29:170PMRejean Boivin

MP 214

Shot 007

First RF pulse,
#3 fired but prevented #4 to go.
Large pre-RF injection didn't help though.

Physics Operator Comments
Aug 17 1999 09:32:28:590AMDmitri MossessianRun delayed for an hour for RF.

Loaded PCS from 990816005.

Coldstart did not work at first, no

"rtnode -- data loaded, A matrix responds
rtnode -- data loaded, M matrix responds
rtnode -- data loaded, PID matrix responds
RT_NODE Done"

record in the log file.

Second attempt was successful.
Aug 17 1999 12:51:47:750PM990817001Dmitri MossessianShot #1 did not go - UPS shut down and CAMAC had to be reset.

No power supplyes on this shot.
Aug 17 1999 01:04:43:780PM990817002Dmitri MossessianFirst plasma attempt. RF off.

Not successful - EF4 power supply did not go..
Aug 17 1999 01:49:47:530PM990817003Dmitri MossessianProblems with EF4. Shot aborted.
Aug 17 1999 02:13:33:780PM990817004Dmitri MossessianNO power shot
Aug 17 1999 02:16:50:543PM990817005Dmitri MossessianPlasma. RF off.
Slight current hesitation at the beginning. Late disruption at 1.8 sec.
No PCS changes for next shot.
Aug 17 1999 02:45:33:750PM990817006Dmitri MossessianRF ON on this shot.

Fizzle.

Increased Bz by setting EF4 at 0 sec to -1260 A (was -1280 A)
(assuming conversion is 15A/mT)
Aug 17 1999 03:03:00:793PM990817007Dmitri MossessianPlasma. Very large injection at .57 sec, not connected with RF.
Increased Ar (Pulse gas 1) to 35 msec (from 30) for next shot.
Aug 17 1999 03:10:57:450PM990817008Dmitri MossessianGood plasma.
Aug 17 1999 03:57:13:060PM990817009Dmitri MossessianIncreased Ar by another 5 msec for this shot (now 40 msec total)
Plasma. Two large injections at .77 and .97 sec, probably associated with RF.
Aug 17 1999 04:51:39:170PM990817010Dmitri MossessianPlasma. No PCS change.
Aug 17 1999 04:51:56:623PM990817011Dmitri MossessianPlasma. No PCS change.
Aug 17 1999 04:52:23:077PM990817012Dmitri MossessianPlasma. No PCS change.
Aug 17 1999 05:10:23:700PM990817013Dmitri MossessianSet Ar (pulse gas 1) back to 35 msec from 40 msec.
Plasma. Flappers open from 1.15 sec.
Aug 17 1999 05:36:33:780PM990817014Dmitri MossessianPlasma. Disrupted at .79 sec due to RF-caused injection.
Aug 17 1999 05:58:57:123PM990817015Dmitri MossessianFizzle. Br went up about 2 mT.
Lowered Br offset by 1.5 mT for next shot.
Aug 17 1999 06:19:48:920PM990817016Dmitri MossessianPlasma. Massive injection coinciding with RF pulse.

Engineering Operator Comments
ShotTimeTypeStatusComment
112:43:09:750PMPlasmaBadUPS Fail. Reset Power Room Camac/ open breaker cycle
201:00:14:437PMPlasmaBadno ef4
301:12:57:793PMPlasmaBadno ef4
401:52:54:640PMTestOkef4 plc no power test
502:03:12:640PMPlasmaOkno faults
602:30:05:500PMPlasmaOk(null)
702:47:36:390PMPlasmaOk(null)
803:06:10:030PMPlasmaOk(null)
903:39:38:263PMPlasmaOk(null)
1003:59:50:687PMPlasmaOk(null)
1104:22:05:390PMPlasmaOk(null)
1204:44:28:733PMPlasmaOk(null)
1305:05:02:873PMPlasmaOk(null)
1405:28:58:780PMPlasmaOk(null)
1505:50:39:170PMPlasmaOk(null)
1606:04:47:357PMPlasmaOk(null)