Miniproposals
Miniproposal:214
Date Filed: 1/5/1999
Title:D and E-port RF System Commissioning
First Author:Steve Wukitch
Session Leader:Rejean Boivin (shots 1-28)
Session Leader:Steve Wukitch (shots 1-28)

Operators
Session leader(s):Rejean Boivin,Steve Wukitch
Physics operator(s):Bill Rowan
Engineering operator(s):Bill Cochran,Gary Dekow,Frank Silva

Engineering Operator Run Comment
MP #214 RF Conditioning/Rowan, Silva

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:20:977PM
Author: To Be Determined
#44 of 47 OPS
Date: 20-AUG-1999 18:34 Expires: 25-AUG-1999 18:33
From: MHERTZ::WUKITCH
Subj: run_summary_990820

Engineering setup and Run Plan for Fri. 8/20/1999

Run to start no earlier than 10:00AM, more likely around noon, depending
on how long it takes to repair the PF breaker. End time is planned to be 6PM.

SL: Wukitch/Boivin
PO: Rowan

MP 214 -- RF conditioning
Continue RF conditioning on J-port
Start with standard 1MA 5.2T plasmas (like 990818002) and try to
optimize heating with J3 and J4 running together.

Back-up MP228 -- SOL Transport with Ohmic H-Modes. Similar to 990819001.

Engineering setup
Setup power supplies from 990818002

Two hours of ECDC in D2 prior to the run.

Gas setup - fill B-top with 6 psi of D2 Hybrid enabled
fill B-side lower with 1 psi of Ar Hybrid enabled
fill B-side upper with 6 psi of H2 Hybrid DISABLED
fill C-side with 30 psi of D2 Hybrid enabled
leave J-bottom as is Hybrid DISABLED

The following gate valves should be enabled, assuming no vacuum problems:
ECE, VUV

001 plasma

002 plasma
no gate from FMIT#3

003 plasma
004

next shot: extend gate to 1.75 sec to try see the reset
overlap for short time
005 plasma
ran well overlapped
phasing appears [0,0,pi,pi]

next shot: retune, extend phase shifter 1.5
006 plasma
faults after 1 sec
phasing appears [0,.25pi,pi,1.25pi]

next shot: move phase shifter further
007 plasma
phasing was unchanged

next shot: insert .7pi cable
008 plasma
H-mode!!!
[0,pi,pi,0]

next shot: return to [0,.25pi,pi,1.25pi]
009 plasma
no H-mode

next shot: return to [0,pi,pi,0]
010 plasma
H-mode

next shot: increase power and retune
011 plasma
phasing is off from tune
floating potential climbs when phasing is off [0,pi,pi,0]

next shot: rephase
012 plasma
improved the phasing
H-mode

next shot: retune
013 plasma


014

015 plasma
brief H-modes

next shot: raise density 1.2
016 plasma
no FMIT#3 - no reset

next shot: repeat
017 disruption @1.14 sec
nl ~ 1.09 pre RF

next shot: repeat with higher nl

018 disruption @1.2 sec
nl~1.07 pre RF
H-modes

next shot: lower density to 0.8
019 disruption @1.2 sec
no FMIT#4 - 9 re-tries

next shot: shorten RF pulse and decrease #4 demand
020 disruption @1 sec
nl~0.8
brief H-modes

next shot: increase plasma gap from 0.8 to 1.2 cm
021 disruption @1.1
nl~0.9
brief H-mode
gap ~1.2 cm

next shot: decrease RF power and lengthen pulse
022 late H-mode
no disruption
Pnet~1 MW
H/D remained at 6%

next shot: increase RF power by ~400 kW
023 disruption @1.23 sec
Pnet~1.5 MW
H/D climbed to 10%

next shot: decrease RF power by ~200 kW
024 no disruption
Pnet~1.4 MW during slow ramp
H/D rises from 5-8%

next shot: repeat
025 disruption @
gap was 1.0 cm
H/D rises again

next shot: increase gap to 1.2 cm
026 early disruption @0.74 sec

next shot: decrease RF power by 300 kW
027 no disruption
late H-mode
H/D

next shot: ramp RF power to 2.4 MW
028

=======================
Summary
=======================
Continued J-port antenna conditioning and testing into 5.2 T plasmas
(H resonance is on-axis at 78 MHz). We were successful in
demonstrating heating with J-port antenna. Scanning different
relative antenna strap current phases, the best heating was observed
with [0,pi,pi,0]. Other phases did not result in H-mode and had
signficantly more impurity influx, particularly Ti, Mo, and C. The
H/D ratio was increasing with RF power and throughout the day. The
source may be the TiCN coated Faraday screen. We found that full
current disruptions could be avoided by lowering the RF power. A
small density scan suggested that the impurity injections were
insensitive to density. The antenna operated with lower loading (more
like normal D and E-port loading values) with an outer gap at 1.2 cm.
The impurity influx appears to require more conditioning to reduce it.

Physics Operator Summaries
Entered: Jul 7 2004 04:37:08:410PM
Author: To Be Determined
Physop Report for Friday, August 20, 1999

SL: S. Wukitch/R. Boivin
PO: W. Rowan
EO: F. Silva/B. Cochran/G. DeKow


The purpose was to continue RF conditioning of J-Port antenna with 1MA 5.2T
plasmas (similar to 990818002) and to attempt to optimize heating with J3 and
J4 running together (MP 214). Progress toward completion of this MP is described
in the Session Leader Summary.

Loaded shot 990820999 from cmod$test_shots[hybrid.pcs] to begin the run.
This shot was created on 8/19 by Wolfe. It represents the intended changes to
990819001, and would have been shot 990819002 if that shot had been run.
This shot is particularly useful as it contains the setup for RF conditioning
in segment 1 and the setup for Ohmic H-modes in segment 2.

The run began at approx 10 am as planned.

Shots 001 through 016 were run without changes and with frequent requests for
power room access by RF folk. There were some impurity injections -- apparently
from the RF antenna. These seem to be reflected in a small variation in the plasma
disruption time (approx 0.010 to 0.020 ms) during rampdown. For a typical shot
(006), Jim Terry reported that the injection was composed of Mo and Ti.

There were frequent disruptions in the shot range from 017 through 028. The
disruptions occurred at about 1 s and were due to impurity injection from the
antennas. Larger outer gap may lessen the liklihood of disruption, but this
was not clearly demonstrated during the run.

The run ended as planned at 6 pm.

Engineering Setup
Setup power supplies from 990818002
Two hours of ECDC in D2 prior to the run.
Gas setup - fill B-top with 6 psi of D2 Hybrid enabled
fill B-side lower with 1 psi of Ar Hybrid enabled
fill B-side upper with 6 psi of H2 Hybrid DISABLED
fill C-side with 30 psi of D2 Hybrid enabled
leave J-bottom as is Hybrid DISABLED
Gate valves enabled: ECE, VUV

Shot by shot results

Shot 001. Plasma. Shot is as planned. Silva is EO
Loaded this shot from cmod$test_shots[hybrid.pcs] shot 990820999
Shot 002. Plasma.
Shot 003. Plasma
Shot 004. Plasma
Shot 005. Plasma
Shot 006. Plasma
Shot 007. Plasma
Shot 008. Plasma.
Cochran replaces Silva as EO
Shot 009. Plasma
Shot 010. Plasma. H-mode
Shot 011. Plasma. H-mode. (duration approx. 0.04 s) at 0.92 s
Shot 012. Plasma. H-mode with duration of approx 0.1 s
Silva replaces Cochran as EO
Shot 013. Plasma. H-mode duration is approx 0.08 s
Shot 014. Plasma. H-mode
Shot 015. Plasma. H-mode
Shot 016. Plasma . Increased density to 1.2 for this shot on request of SL
Shot 017. Disruption at 1.14 s. Slightly increased rate of rise of ne
Shot 018. Disruption at 1.2 s
DeKow replaces Silva as EO
Shot 019. Disruption at 1.15 s
Shot 020. Disruption at 1 s
Shot 021. Disruption at 1.06 s, Increased ne. Increased outer gap.
Shot 022. Plasma. Reduced RF power
Shot 023. Disruption at 1.23 s. Decreased RF power.
Shot 024. Plasma.
Shot 025. Disruption at 1.23 s.
Shot 026. Disruption at 0.75 s. Increased outer gap
Shot 027. Plasma.
Shot 028. Disruption at 1.06 s.

Score Card
Plasma 19
Disruptions 9
Fizzles 0
Duds 0
Total 28


Session Leader Comments
Aug 20 1999 02:49:37:920PM990820015Steve Wukitch015 plasma
brief H-modes

next shot: raise density 1.2
Aug 20 1999 02:58:53:873PM990820016Steve Wukitch016 plasma
no FMIT#3 - no reset

next shot: repeat
Aug 20 1999 03:05:21:390PM990820017Steve Wukitch017 disruption @1.14 sec
nl ~ 1.09 pre RF

next shot: repeat with higher nl
Aug 20 1999 03:19:04:653PM990820018Steve Wukitch018 disruption @1.2 sec
nl~1.07 pre RF
H-modes

next shot: lower density to 0.8
Aug 20 1999 03:40:52:340PM990820019Steve Wukitch019 disruption @1.2 sec
no FMIT#4 - 9 re-tries

next shot: shorten RF pulse and decrease #4 demand
Aug 20 1999 04:03:58:780PM990820020Steve Wukitch020 disruption @1 sec
nl~0.8
brief H-modes

next shot: increase plasma gap from 0.8 to 1.2 cm
Aug 20 1999 04:33:57:233PM990820021Steve Wukitch021 disruption @1.1
nl~0.9
brief H-mode
gap ~1.2 cm

next shot: decrease RF power and lengthen pulse
Aug 20 1999 04:33:44:543PM990820022Steve Wukitch022 late H-mode
no disruption
Pnet~1 MW
H/D remained at 6%

next shot: increase RF power by ~400 kW
Aug 20 1999 04:52:09:780PM990820023Steve Wukitch023 disruption @1.23 sec
Pnet~1.5 MW
H/D climbed to 10%

next shot: decrease RF power by ~200 kW
Aug 20 1999 05:03:39:390PM990820024Steve Wukitch024 no disruption
Pnet~1.4 MW during slow ramp
H/D rises from 5-8%

next shot: repeat
Aug 20 1999 05:20:37:123PM990820025Steve Wukitch025 disruption @
gap was 1.0 cm
H/D rises again

next shot: increase gap to 1.2
Aug 20 1999 05:52:41:030PM990820026Steve Wukitch026 early disruption @0.74 sec

next shot: decrease RF power by 300 kW
Aug 20 1999 05:52:27:903PM990820027Steve Wukitch027 no disruption
late H-mode
H/D

next shot: ramp RF power to 2.4 MW

Physics Operator Comments
Aug 20 1999 09:18:34:013AMBill RowanEngineering setup and Run Plan for Fri. 8/20/1999

Run to start no earlier than 10:00AM, more likely around noon, depending on how
long it takes to repair the PF breaker. End time is planned to be 6PM.

SL: Wukitch/Boivin PO: Rowan

MP 214 -- RF conditioning Continue RF conditioning on J-port Start with standard
1MA 5.2T plasmas (like 990818002) and try to optimize heating with J3 and J4
running together.

Back-up MP228 -- SOL Transport with Ohmic H-Modes. Similar to 990819001.

Engineering setup Setup power supplies from 990818002

Two hours of ECDC in D2 prior to the run.

Gas setup - fill B-top with 6 psi of D2 Hybrid enabled fill B-side lower with 1
psi of Ar Hybrid enabled fill B-side upper with 6 psi of H2 Hybrid
DISABLED fill C-side with 30 psi of D2 Hybrid enabled leave J-bottom
as is Hybrid DISABLED

The following gate valves should be enabled, assuming no vacuum problems: ECE,
VUV



Started PCS at 9am. Loaded from cmod$test_shots[hybrid.pcs] shot 990820999
This was created on 8/19 by Wolfe. It represents changes to 990819001. This would have been shot
990819002 if that shot had been run.

Executed coldstart at 9:10am with expected result of

rtnode -- data loaded, A matrix responds
rtnode -- data loaded, M matrix responds
rtnode -- data loaded, PID matrix responds
RT_NODE Done
Aug 20 1999 09:21:50:107AMBill RowanSetup is for the RF experiment
Aug 20 1999 10:06:46:857AM990820001Bill RowanShot 001

Prior to this shot did a load/clean after selecting segment 2 which is the RF target.
Load at 20-Aug-1999 09:27:40.00

Plasma. Shot is as planned.

Aug 20 1999 10:36:06:043AM990820003Bill RowanShot 002

No changes in plasma control prior to this shot.

Plasma.

No changes for next shot

Power room access for RF prior to this shot

Aug 20 1999 10:47:47:467AM990820003Bill RowanShot 003

Plasma

No changes for next shot
Aug 20 1999 10:48:26:187AM990820003Bill RowanPower room access after this shot
Aug 20 1999 11:05:05:873AM990820004Bill RowanShot 004

Plasma

No changes prior to next shot
Aug 20 1999 11:20:04:280AM990820005Bill RowanShot 005

Power room access by RF before this shot

Plasma

No changes prior to next shot.
Aug 20 1999 11:41:54:483AM990820006Bill RowanShot 006

Power room access by RF before this shot

Plasma

No changes prior to next shot
Aug 20 1999 12:06:46:687PM990820006Bill RowanJim Terry reports that the injection is composed of Mo and Ti for shot 006
Aug 20 1999 12:00:14:793PM990820007Bill RowanShot 007

Power room access by RF before this shot

Plasma

No changes prior to the next shot
Aug 20 1999 12:19:33:950PM990820008Bill RowanShot 008

Power room accees by RF before this shot

Cochran taking over for Silva as EO

Plasma

No changes prior to next shot
Aug 20 1999 12:35:51:327PM990820009Bill RowanShot 009

Power room access by RF before this shot

Plasma

No changes before this shot
Aug 20 1999 12:57:47:983PM990820010Bill RowanShot 010

Plasma. H-mode

No changes before the next shot.
Aug 20 1999 01:12:56:123PM990820011Bill RowanShot 011

Power room access by RF before this shot.

Plasma. Brief H-mode (duration approx. 0.04 s) at 0.92 s

No changes before the next shot
Aug 20 1999 01:32:48:750PM990820012Bill RowanShot 012

Power room access by RF before this shot

Silva replaces Cochran as EO

Plasma. H-mode with duration of approx 0.1 s
Aug 20 1999 01:47:08:437PM990820013Bill RowanShot 013

Plasma. H-mode duration is approx 0.08 s
Aug 20 1999 02:05:14:200PM990820014Bill RowanShot 014

Plasma. H-mode
Aug 20 1999 02:21:28:077PM990820015Bill RowanShot 015

Plasma. H-mode
Aug 20 1999 02:40:19:123PM990820016Bill RowanShot 016

Increased density to 1.2 for this shot on request of SL

For the next shot, attempted to increase the rate of rise of the
density so that it will reach 1.2 before the RF comes on
Aug 20 1999 02:58:46:437PM990820017Bill RowanShot 017

Disruption at 1.14 s

Appears to be an injection that causes the disruption.

No changes before next shot
Aug 20 1999 03:22:59:700PM990820018Bill RowanShot 018

Disruption at 1.2 s

Again appears to be an injection that causes the disruption.

Lowered density to 0.8.

DeKow replaces Silva as EO

Aug 20 1999 03:40:17:013PM990820019Bill RowanShot 019

Disruption at 1.15 s

No changes before next shot.
Aug 20 1999 03:58:45:857PM990820020Bill RowanShot 20

Disruption at 1 s
Aug 20 1999 04:15:04:217PM990820021Bill RowanShot 21

Decreased RCUR by 0.002. Increased outer gap to 1.2

Increased ne to 1

Disruption at 1.06 s

No changes in plasma control for the next shot. Reducing the RF power for the next shot
Aug 20 1999 04:27:26:000PM990820022Bill RowanShot 022

Plasma. Full length shot.

H-mode at 1.16

No changes for next shot.
Aug 20 1999 04:41:11:233PM990820023Bill RowanShot 023

Disruption at 1.23 s.

No changes in plasma control for next shot. Decreasing the RF power.
Aug 20 1999 04:56:00:123PM990820024Bill RowanShot 024

Full length shot.

No changes in plasma control for next shot.
Aug 20 1999 05:02:48:750PM990820024Bill RowanChanged RCUR to change outer gap from 1.35 to 1.2 for next shot
Aug 20 1999 05:14:43:840PM990820025Bill RowanShot 025

Disruption at 1.23 s.

For the next shot. Change RCUR to move outer gap from 1.0 to 1.2
Aug 20 1999 05:32:09:030PM990820026Bill RowanShot 026

Disruption at 0.75 s.

Reducing RF power for next shot.
Aug 20 1999 05:44:41:217PM990820027Bill RowanShot 027

Full length shot

Right gap is approximately 1.2

No changes in plasma control for the next shot.

Ramping RF power on the next shot.
Aug 20 1999 06:04:13:810PM990820028Bill RowanShot 028

Disruption at 1.06 s.

Last shot.

Engineering Operator Comments
ShotTimeTypeStatusComment
109:52:01:357AMPlasmaOkno faults/plasma 09:50 start
210:14:29:140AMPlasmaOkno faults
310:33:14:437AMPlasmaOkno faults/10:30
411:00:15:043AMPlasmaOkno faults/10:58
511:15:08:543AMPlasmaOkno faults
611:35:30:857AMPlasmaOkno faults
711:54:30:640AMPlasmaOkno faults
812:12:26:623PMPlasmaOk(null)
912:30:28:577PMPlasmaOk(null)
1012:48:17:373PMPlasmaOk(null)
1101:05:46:340PMPlasmaOk(null)
1201:24:59:687PMPlasmaOk(null)
1301:41:23:700PMPlasmaOkno faults
1401:56:35:437PMPlasmaOkno faults
1502:14:15:607PMPlasmaOkno faults
1602:31:24:543PMPlasmaOkno faults
1702:47:32:280PMPlasmaOkno faults
1803:06:57:217PMPlasmaOkno faults
1903:24:41:873PMPlasmaOk(null)
2003:41:56:217PMPlasmaOk(null)
2104:01:24:670PMPlasmaOk(null)
2204:17:36:717PMPlasmaOk(null)
2304:33:27:827PMPlasmaOk(null)
2404:52:16:340PMPlasmaOk(null)
2505:07:27:340PMPlasmaOk(null)
2605:23:56:920PMPlasmaOk(null)
2705:38:53:403PMPlasmaOk(null)
2805:57:47:450PMPlasmaOk(null)