Miniproposal:218
Date Filed: 1/13/1999
Title:Impurity Transport Coefficient Profiles in EDA H-mode
First Author:John Rice
Session Leader:John Rice (shots 1-12)

Operators
Session leader(s):John Rice
Physics operator(s):John Goetz
Engineering operator(s):Frank Silva

Engineering Operator Run Comment
scanner test

Session Leader Plans

Physics Operators Plans

Session Leader Summaries
Entered: Jul 7 2004 03:49:21:477PM
Author: To Be Determined
Run summary for 990924, MP218, Impurity Transport Coefficient Profiles in
EDA H-mode

The purpose of this run was to determine the profiles of the impurity
diffusion coefficient and convection velocity during EDA H-mode. There was
one excellent discharge for study, 990924005, and then the run was cancelled
due to a warm reading on one of the TF windings.

Physics Operator Summaries
Entered: Jul 7 2004 04:37:09:490PM
Author: To Be Determined
Physics operator summary for 990924

EO: Silva
PO: Goetz
SL: Rice

Run 990924 was in support of MP 218 -- Impurity Transport Coefficient
Profiles in EDA H-Mode. Run repetitive shots similar to Shot 990920015
and inject CalciumFluoride and scan HIREX and MCP spectrometers to measure
Ca and F charge states and their distribution.

Nothing was done today toward completion of the MP. Three shots were
taken with the last having 2.8MW of RF for a nice EDA plasma with CaF
injection. All three had good breakdowns and current rises. The run
ended early due to concerns over an above normal temperature reading in the TF
magnet.

Engineering, computing, and diagnostics today:
A critical CAMAC initialization error led to a dud for shot 2.
There were indications of above normal temperatures in the
TF magnet and the run was stopped early to investigate these
measurements.

Scorecard: 11 shots = 3 plasmas + 0 fizzles + 1 duds + 7 tests

Shot summary for Run 990924:

Load 990920015
reduce BR_0 from .0005 -> 0.0
Change nl_04 from 0.9e20 -> 1.0e20
extend TF flattop from 1.4 -> 1.5sec and move wiggle to 0.9->1.1s

coldstart hybrid - everything loaded; all matrices respond

Shot change result
____ _____ ______
1 test shot of CAMAC

2 dud no EF1s or OH1; had an INIT->RECOOL
transition because of critical CAMAC
initialization error

3 see above plasma; b.d. @ .006; good current rise

4 draw (100V x 100ms) @ 0.3s on plasma; b.d. @ .006; good current rise
PG2 CaF injection into EDA H-mode

5 make PG2 200ms plasma; good current rise; 2.8MW EDA
strikes on the floor

6 no power cycle for TF scanner

7 no power cycle for TF scanner

8 no power cycle for TF scanner

9 no power cycle for TF scanner

10 no power cycle for TF scanner

11 no power cycle for TF scanner

Session Leader Comments
Sep 23 1999 04:18:52:357PMJohn GoetzRun 990924

Engineering:

Setup Power Supplies from Shot 990920015

Two Hours of ECDC in D2 prior to run
The run should begin at 9:00AM and end at 5:00PM

Gas setup: Fill B-Top with 6 psi D2, Hybrid enabled
Fill B-side lower with 1 psi Ar, Hybrid DISABLED
Fill B-side upper with 6 psi H2, Hybrid DISABLED
Fill C-Side with 30 psi D2, Hybrid Enabled
J-Bottom pumped out, Hybrid DISABLED

ECE, VUV, and RGA gate valves enabled, if no vacuum problems

Require 2.5 MW of RF (square wave) from 0.6 to 1.1s [rest of shot
available for MP214]

Physics:

MP 218 - Impurity Transport Coefficient Profiles in EDA H-Mode

Run repetitive shots similar to Shot 990920015 and inject CalciumFluoride
and scan HIREX and MCP spectrometers to measure Ca and F charge
states and their distributions.
Sep 23 1999 04:22:19:450PMJohn GoetzRun 990924

Load 990920015
move TF wiggle so that it begins at 0.9s and ends at 1.1s
save in cmod$root:[hybrid.pcs]PCS_990924999.*
Sep 24 1999 10:55:49:310AM990924003John RiceCaF2 injection at .7s
RF trip
Sep 24 1999 11:24:18:857AM990924004John RiceCaF2 injection at .7s
good EDA, a little slow on the RF rise.
long impurity confinement time
Sep 24 1999 11:46:04:483AM990924005John RiceCaF2 injection at .7s
good EDA, 2.9 MW ICRF
60 ms impurity confinement time

Physics Operator Comments
Sep 24 1999 07:53:20:750AMSteve WolfeFrom: WOOD::GOETZ
Subj: 990924 run

Run 990924

Engineering:

Setup Power Supplies from Shot 990920015

Two Hours of ECDC in D2 prior to run
The run should begin at 9:00AM and end at 5:00PM

Gas setup: Fill B-Top with 6 psi D2, Hybrid enabled
Fill B-side lower with 1 psi Ar, Hybrid DISABLED
Fill B-side upper with 6 psi H2, Hybrid DISABLED
Fill C-Side with 30 psi D2, Hybrid Enabled
J-Bottom pumped out, Hybrid DISABLED
ECE, VUV, and RGA gate valves enabled, if no vacuum problems

Require 2.5 MW of RF (square wave) from 0.6 to 1.1s [rest of shot
available for MP214]

Physics:

MP 218 - Impurity Transport Coefficient Profiles in EDA H-Mode

Run repetitive shots similar to Shot 990920015 and inject CalciumFluoride
and scan HIREX and MCP spectrometers to measure Ca and F charge
states and their distributions.
Sep 24 1999 08:10:49:327AMSteve WolfeWolfe starting the day as PHYSOP until John Goetz takes over.
John set up a starting shot:
>Steve,
>I have created a PCS file for the first shot of 990924 and have stored it in:
> cmod$root:[hybrid.pcs]PCS_990924999.*
>This shot was a load of pcs_990920015.* and the TF wiggle was moved from
>1.0s to 0.9s.
>Rice wants a 0.8MA, 5.4T plasma with nl04(pre H-mode) of 1.0.
>The hybrid has not been cold-started.
>John

Load_From 990924; reduce BR_0 from .0005 -> 0.0
Change nl_04 from 0.9e20 -> 1.0e20; extend TF flattop from 1.4 -> 1.5sec
Load/clean at 8:06
Coldstart at 08:07 - logfile is ok (no errors, all matrices respond)

Sep 24 1999 08:47:24:170AM990924001Steve WolfeShot 1: Data system/scanner cycle test
Sep 24 1999 09:42:25:873AM990924001Steve WolfeShot 2:
Some delay:
Engineers looking at cooling of TF H-Right bottom turn
RF is chasing an arc detector problem

Goetz is here and taking over
Sep 24 1999 10:19:02:780AM990924002John GoetzShot 990924002


Dud - no OH1 and no EF1s
there was a CRITICAL CAMAC INITIALIZATION ERROR before this shot and there was a INIT->RECOOL->INIT transition
Sep 24 1999 10:42:51:983AM990924003John GoetzShot 990924003:
see RUN comments for shot loading characteristics

Results:
plasma; breakdown @ .006; good current rise
outer gap ~ 1cm; inner gap ~ 1.5cm; acceptable target for RF (although there were problems on this 1st shot)

Sep 24 1999 11:11:58:577AM990924004John GoetzShot 990924004:
enable B-Side-Upper and draw (100V x 100ms) square wave @ 0.3s on Pulse_gas_2

Results:
plasma; breakdown @ .006; good current rise
better waveform from the RF;
CaF injected into EDA H-mode
Sep 24 1999 11:39:56:373AM990924005John GoetzShot 990924005:
make hydrogen waveform [100V x 200ms] @ 0.3s

Results:
plasma; breakdown @ .006; good current rise
2.8Mw from D & E;
slot divertor until about 0.9s
Sep 24 1999 01:14:51:873PM990924006John GoetzShot 990924006:
no power cycle for TF scanner test
Sep 24 1999 01:14:59:640PM990924007John GoetzShot 990924007:
no power cycle for TF scanner test
Sep 24 1999 01:28:02:217PM990924008John GoetzShot 990924008:
no power cycle for TF scanner test
Sep 24 1999 01:39:09:840PM990924009John GoetzShot 990924009:
no power cycle for TF scanner test
Sep 24 1999 01:59:34:733PM990924010John GoetzShot 990924010:
no power cycle for TF scanner test
Sep 24 1999 02:20:07:500PM990924011John GoetzShot 990924011:
no power cycle for TF scanner test

Engineering Operator Comments
ShotTimeTypeStatusComment
108:45:04:310AMTestOkscanner test
210:11:05:733AMPlasmaOkBacked out of cycle/lost some power supplies
310:32:52:280AMPlasmaOkno faults/plasma
411:04:36:733AMPlasmaOk(null)
511:24:38:873AMPlasmaOk(null)
612:26:45:403PMPlasmaOk(null)
712:54:19:233PMPlasmaOk(null)
801:19:36:590PMTestOkscanner test
901:38:43:827PMTestOkscanner test
1001:57:30:653PMTestOkscanner test
1102:16:52:717PMTestOkscanner test
1206:18:25:750PMTestOkscanner test only