Alcator C-Mod Run 991018 Information

Back to runs

Miniproposals
Miniproposal:214
Date Filed: 1/5/1999
Title:D and E-port RF System Commissioning
First Author:Steve Wukitch
Session Leader:Steve Wukitch (shots 1-19)

Operators
Session leader(s):Steve Wukitch
Physics operator(s):Jim Irby
Engineering operator(s):Frank Silva,Gary Dekow,Bill Cochran

Engineering Operator Run Comment
TF res tests

Session Leader Plans

Physics Operators Plans

Session Leader Summaries

Physics Operator Summaries
Entered: Jul 7 2004 04:37:09:693PM
Author: To Be Determined
Physop Summary for 991018
TF Magnet Tests and MP214 --- RF Conditioning

PO: Irby
EO: Silva, Dekow, Cochran
SL: Wukitch

Summary
-------

Several data system cycles were run during cooldown today (001-008).
Scanner data from these cycles indicated much lower resistances on
the TF magnet joints.

The beginning of the run was dedicated to testing the TF magnet.
After a standard OH test (009), we took a shot at 50 kA
(010) with a 3 second flattop, and two shots at 150 kA
with about 0.6 second flattops (011 and 012). TF resistances were
down nearly a factor of two since the last run period. The
variation in resistance was only 0.3 to 0.4 uOhm over the
16 joints we are monitoring.

Shot 13 was run without power supplies to make sure a data system
problem during INIT did not do in the shot. Plasmas were obtained
on all remaining shots. All transmitters except #2 ran today into
plasma. Up to 1.8 MW out of #1 was obtained, up to 0.7 MW was
delivered out of #3 and #4. The #2 transmitter was not available
because one of the fault indicators was not working.


Score
-----

19 data cycles

8 cooldown scanner tests
4 tests (1 OH, 3 TF)
1 data system failure
6 plasmas
0 fizzles or duds
0 disruptions

Session Leader Comments

Physics Operator Comments
Oct 18 1999 09:49:26:013AMJim Irbydid coldstart --- looks okay

Oct 18 1999 10:23:22:250AM991018009Jim IrbyOH test --- looks great
Oct 18 1999 10:51:26:733AM991018010Jim IrbyTF test at 50kA --- 3 second flattop

Looks very good. Turn 79MB at 1.1 uOhms
Oct 18 1999 11:27:10:263AM991018011Jim Irby150 kA TF test ---- turn 79MB at 1.15 uOhms
Oct 18 1999 11:28:05:280AM991018012Jim Irby150 kA TF test ---- Turn 79MB at 1.2 uOhms
Oct 18 1999 01:56:33:107PM991018013Jim IrbyPlasma attempt --- loaded shot 990924005

ECE gatevalve enabled
VUV gatevalve enabled

Had CAMAC problem --- running through cycle

Oct 18 1999 02:20:45:717PM991018014Jim Irbytrying for plasma again

plasma ---- nearly lost TCI CO2 laser

Oct 18 1999 02:56:28:340PM991018015Jim IrbyChanged gain of TF tap digitizer from 8 to 2.

Enabled Argon puff for John.

RF is ready to go with #1, #3, and #4

Plasma --- h-mode

1.0 MW #1
0.2 #3
0.17 #4
Oct 18 1999 03:13:51:590PM991018016Jim IrbyAdded 9 ms to the Argon puff width: start from 0.299 to 0.290 seconds

Plasma -- h-mode
1 MW #1
> 0.5 MW #3 and #4
Oct 18 1999 03:40:39:733PM991018017Jim IrbyLoading for D-port not very good: increased RCUR from 0.669 to 0.672 m

Plasma ---
1.5 MW on #1
0.5 MW on #3
faults on #4


TCI hanging in there...

RCUR tweak worked: Outer gap from 1.5 cm on previous shot to 1.0 cm this shot


Oct 18 1999 04:00:46:250PM991018018Jim IrbyNo PO changes

RF made entry to check a few things

Good plasma --- h-mode

#1, #3, and #4 ran.


Oct 18 1999 04:15:30:437PM991018019Jim IrbyNo PO changes

Plasma ----

Engineering Operator Comments
ShotTimeTypeStatusComment
104:27:29:280AMTestOkTF Scanner
206:58:53:670AMTestOkTF scanner
307:33:13:810AMTestOkTF Scanner Test
407:55:24:123AMTestOk(null)
508:15:18:890AMTestOk(null)
608:33:37:107AMTestOkTF Scanner Test
708:51:42:340AMTestOk(null)
809:10:52:250AMTestOk(null)
910:18:39:310AMTestOkOH Resistance Measurement Test
1010:35:02:750AMTestOkTF Resistance test
1110:49:10:797AMTestOkTF Resistance Test
1211:03:46:920AMTestOkTF Resistance Test
1301:45:09:983PMTestBadIgor Problems
1402:05:58:250PMPlasmaOk(null)
1502:51:05:513PMPlasmaOk(null)
1603:09:15:530PMPlasmaOk(null)
1703:27:26:390PMPlasmaOk(null)
1803:49:47:403PMPlasmaOk(null)
1904:08:04:450PMPlasmaOk(null)