Alcator C-Mod Runs for CY 2007

Select Calendar Year
2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991

Run IDDateMPDescription
1071227 Dec 27 2007 data system test cycles
1071226 Dec 26 2007 data system test cycles
1071221 Dec 21 2007 419Fiducial wall pumping measurements for comparing operating conditions
1071220 Dec 20 2007 419Fiducial wall pumping measurements for comparing operating conditions
450 Disruption mitigation using high pressure gas-mixture injection
1071219 Dec 19 2007 473Lower Hybrid System Check-out and Initial operation
518 LH_B and LH_D NINJA Capillary Testing
1071218 Dec 18 2007 355ICRF Testing & Conditioning
488 Evaluation of the Fast Ferrite Tuning System on E-Port Antenna
1071214 Dec 14 2007 473Lower Hybrid System Check-out and Initial operation
1071213 Dec 13 2007 355ICRF Testing & Conditioning
1071212 Dec 12 2007 355ICRF Testing & Conditioning
1071211 Dec 11 2007 516Experimental Measurement of the Maximum Controllable Displacement deltaZ_max
517 Experimental Test of a Kalman Filter for the Vertical Position
1071207 Dec 07 2007 473Lower Hybrid System Check-out and Initial operation
1071206 Dec 06 2007 475Cryopump Startup
1071205 Dec 05 2007 355ICRF Testing & Conditioning
1071204 Dec 04 2007 MP#298a: C-Mod Startup and Conditioning PO Earl Marmar
1071130 Nov 30 2007 Data System test cycles
1071129 Nov 29 2007 MP#473: LH check-out and initial operation
1071128 Nov 28 2007 1) begin to debug OH supply ripple 2) produce a plasma PO Jim Irby
1071127 Nov 27 2007 automatically entered by signon - please replace with real comment
1071121 Nov 21 2007
1071120 Nov 20 2007 Power System tests followed by plasma attempt
1071116 Nov 16 2007 Cycle Tests
1071106 Nov 06 2007 Test Shots
1071026 Oct 26 2007 Demo shot cycle
1070831 Aug 31 2007 491MSE Calibrations
501 Fluctuations in ITB Plasmas
1070830 Aug 30 2007 502HIREX-SR Calibration Plasmas
504 Slow Evolution or Two Phase L-H Transitions
1070829 Aug 29 2007 496High Performance Operation at Ip > 1.2 MA
1070828 Aug 28 2007 515Effect of launched LH wave nll spectrum on current profile
1070827 Aug 27 2007 468LH-driven fast electron diffusion time measurement
1070824 Aug 24 2007 495aAlfvén Cascades studies with ICRH and LHCD
499a Parametric Decay and Density Limit for LHEH/LHCD
1070823 Aug 23 2007 495aAlfvén Cascades studies with ICRH and LHCD
1070822 Aug 22 2007 425Toroidal rotation in dimensionally similar discharges with no momentum input
1070821 Aug 21 2007 514Influence of magnetic topology on the H-mode pedestal
1070820 Aug 20 2007 MSE Calibrations (DNB into gas)
1070817 Aug 17 2007 490Assessing LHCD in ICRF -Heated L and H-modes
1070816 Aug 16 2007 506H-modes with cryopumping in upper single null topology
1070815 Aug 15 2007 TF Tests
1070814 Aug 14 2007 TF Tests and then MP506: H-modes with cryopumping in USN SL: Hughes PO:R
1070810 Aug 10 2007 499aParametric Decay and Density Limit for LHEH/LHCD
1070809 Aug 09 2007 MP506: H-modes with cryopumping in USN SL: Hughes PO:Rowan
1070808 Aug 08 2007 506H-modes with cryopumping in upper single null topology
1070807 Aug 07 2007 503Scaling of the L-H transition at low density
1070806 Aug 06 2007 Cryopump Tests
1070803 Aug 03 2007 498Density Peaking at Low Collisionality
1070802 Aug 02 2007 498Density Peaking at Low Collisionality
515 Effect of launched LH wave nll spectrum on current profile
1070801 Aug 01 2007 429SOL turbulence in limited plasmas
1070731 Jul 31 2007 491MSE Calibrations
1070730 Jul 30 2007 452aReversed field pedestal studies
1070727 Jul 27 2007 298aC-Mod Plasma Startup
481a Stereo Imaging of Lithium Pellet Ablation Striations
1070726 Jul 26 2007 504Slow Evolution or Two Phase L-H Transitions
1070725 Jul 25 2007 510Topology effect on SOL Total Flow Vector with Reversed Field
1070724 Jul 24 2007 511Study of ELM Structure, Dynamics and Energetics on Alcator C-Mod
1070720 Jul 20 2007 475Cryopump Startup
1070719 Jul 19 2007 458Type, Filament Structure and â¿¿Pacingâ¿? of ELMs in High-triangularity Plasmas
1070718 Jul 18 2007 506H-modes with cryopumping in upper single null topology
1070717 Jul 17 2007 298aC-Mod Plasma Startup
1070713 Jul 13 2007 472 Continued Studies of Turbulence in Low Density Ohmic Plasmas
1070712 Jul 12 2007 492Lower lp Long Pulse L-mode and H-mode Advanced Scenarios
1070711 Jul 11 2007 492Lower lp Long Pulse L-mode and H-mode Advanced Scenarios
1070710 Jul 10 2007 493Ohmic L-H Threshold Experiments
1070709 Jul 09 2007 cycle test
1070702 Jul 02 2007 430Localization of the effect of boronization
1070629 Jun 29 2007 486Investigation of ICRF Impurity Generation and B Erosion
491 MSE Calibrations
1070628 Jun 28 2007 477Formation of Ohmic H-Mode ITB with Improved Diagnostic Set
1070627 Jun 27 2007 480WASP Experiments: Topology Effect on SOL Total Flow Vector
1070626 Jun 26 2007 489Damping Rate of Toroidal Alfvén Eigenmodes at the Threshold of Stability in the Presence of ICRF He
1070622 Jun 22 2007 490Assessing LHCD in ICRF -Heated L and H-modes
1070621 Jun 21 2007 478Joint Experiments with JET on Non-Resonant n=2 Magnetic Breaking
1070620 Jun 20 2007 379High Power ICRF Experiments
1070619 Jun 19 2007 473Lower Hybrid System Check-out and Initial operation
1070615 Jun 15 2007 491MSE Calibrations
1070614 Jun 14 2007 485H-Mode Density Control and Pedestal Response to Cryopumping
1070613 Jun 13 2007 473Lower Hybrid System Check-out and Initial operation
1070612 Jun 12 2007 430Localization of the effect of boronization
1070611 Jun 11 2007 Gas and cycle tests
1070608 Jun 08 2007 419Fiducial wall pumping measurements for comparing operating conditions
430 Localization of the effect of boronization
1070607 Jun 07 2007 490Assessing LHCD in ICRF -Heated L and H-modes
1070606 Jun 06 2007 473Lower Hybrid System Check-out and Initial operation
1070605 Jun 05 2007 355ICRF Testing & Conditioning
489 Damping Rate of Toroidal Alfvén Eigenmodes at the Threshold of Stability in the Presence of ICRF He
1070602 Jun 02 2007
1070601 Jun 01 2007 475Cryopump Startup
1070531 May 31 2007 483Initial Experiments Measuring Pedestal Characteristics USING CXRS
1070530 May 30 2007 481Stereo Imaging of Lithium Pellet Ablation Striations
1070529 May 29 2007 491MSE Calibrations
1070525 May 25 2007 475Cryopump Startup
1070524 May 24 2007 468LH-driven fast electron diffusion time measurement
473 Lower Hybrid System Check-out and Initial operation
1070523 May 23 2007 468LH-driven fast electron diffusion time measurement
473 Lower Hybrid System Check-out and Initial operation
473 Lower Hybrid System Check-out and Initial operation
473 Lower Hybrid System Check-out and Initial operation
1070522 May 22 2007 475Cryopump Startup
1070518 May 18 2007 479Effect of Magnetic Shear on Edge Gradients
1070517 May 17 2007 362Shaping and Control Development for high elongation, high I
487 Effect of the Plasma Configuration on Edge Turbulence
1070516 May 16 2007 482CXRS Diagnostic Development
1070515 May 15 2007 MP#488 Evaluation of the Fast Ferrite Tuning System,MP#355 ICRF Testing
1070511 May 11 2007 480WASP Experiments: Topology Effect on SOL Total Flow Vector
1070510 May 10 2007 470Localization of ECDC flux profiles and boron film growth using vertical fields
1070509 May 09 2007 470Localization of ECDC flux profiles and boron film growth using vertical fields
1070504 May 04 2007 296Confirmation of Thomson scattering density calibration using electron cyclotron emission cutoffs
429 SOL turbulence in limited plasmas
1070503 May 03 2007 468LH-driven fast electron diffusion time measurement
488 Evaluation of the Fast Ferrite Tuning System on E-Port Antenna
1070502 May 02 2007 MP# 468(S/L A. Schmidt) & 429(S/L S. Zweben) P/O Granetz E/O Pierson
1070501 May 01 2007 412a Improved hydrogen-to-deuterium changeover using radiative terminations and disruptions
488 Evaluation of the Fast Ferrite Tuning System on E-Port Antenna
1070430 Apr 30 2007 TF Scanner Test
1070427 Apr 27 2007 464LHCD Coupling Optimization
468 LH-driven fast electron diffusion time measurement
1070426 Apr 26 2007 462Dust studies in C-Mod
473 Lower Hybrid System Check-out and Initial operation
1070425 Apr 25 2007 394MSE Calibration III
461 Development of Zero Loop Voltage control algorithm
1070424 Apr 24 2007 MP# 355: ICRF conditioning
1070420 Apr 20 2007 data system tests
1070419 Apr 19 2007 Power Supply DPCS Fault Response Test
1070418 Apr 18 2007 Test Critical action dispatching
1070413 Apr 13 2007 464LHCD Coupling Optimization
473 Lower Hybrid System Check-out and Initial operation
473 Lower Hybrid System Check-out and Initial operation
1070412 Apr 12 2007 466Slower Ip Ramp Development
1070411 Apr 11 2007 473Lower Hybrid System Check-out and Initial operation
1070410 Apr 10 2007 460Test of Effect of Fast ions on MSE with perpendicular injection
461 Development of Zero Loop Voltage control algorithm
1070409 Apr 09 2007 460Test of Effect of Fast ions on MSE with perpendicular injection
1070406 Apr 06 2007 471Optimization of the Fast Vertical Control Gains for DIII-D and ITER-like shapes
1070405 Apr 05 2007 000Testing
412a Improved hydrogen-to-deuterium changeover using radiative terminations and disruptions
460 Test of Effect of Fast ions on MSE with perpendicular injection
474 Proof of principles test of BES for broadband fluctuation measurements
1070404 Apr 04 2007 465WASP Start-up Activities
1070403 Apr 03 2007 470Localization of ECDC flux profiles and boron film growth using vertical fields
1070402 Apr 02 2007 460Test of Effect of Fast ions on MSE with perpendicular injection
1070330 Mar 30 2007 464LHCD Coupling Optimization
473 Lower Hybrid System Check-out and Initial operation
473 Lower Hybrid System Check-out and Initial operation
1070329 Mar 29 2007 464LHCD Coupling Optimization
473 Lower Hybrid System Check-out and Initial operation
1070328 Mar 28 2007 298aC-Mod Plasma Startup
473 Lower Hybrid System Check-out and Initial operation
473 Lower Hybrid System Check-out and Initial operation
1070327 Mar 27 2007 298aC-Mod Plasma Startup
1070326 Mar 26 2007
1070323 Mar 23 2007 MP# 298a: Startup and LH operation Session leaders: R. Parker? Physics o
1070322 Mar 22 2007 298aC-Mod Plasma Startup
1070321 Mar 21 2007 MP#298a SL: irby PO: wolfe
1070320 Mar 20 2007 298aC-Mod Plasma Startup
1070319 Mar 19 2007 470Localization of ECDC flux profiles and boron film growth using vertical fields
1070316 Mar 16 2007 298aC-Mod Plasma Startup
1070315 Mar 15 2007 Power Supply Test Con't, MP465, MP298A
1070313 Mar 13 2007 Power System. MP465, MP298a
1070312 Mar 12 2007 Power System tests
1070308 Mar 08 2007 data system tests
1070305 Mar 05 2007 TF Scanner and maybe gas tests
1070304 Mar 04 2007 Test shot to check the scanner and gas signal modules
1070301 Mar 01 2007 data system tests
1070226 Feb 26 2007 testing data system
1070223 Feb 23 2007 testing data system
1070103 Jan 03 2007 Data system test cycles

Select Calendar Year
2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991