Operations and Diagnostic Development
(Irby)
|
First Author |
Title |
Number |
Status |
|
|
|
|
|
|
|
Ideas from 2005 Ideas Forum |
|
|
|
|
|
|
|
|
Bose |
2005-064 |
H (thesis, PB to start, then dedicated transport) |
|
|
|
High and low
density comparisons of foil and axuv bolometers |
2005-065 |
H PB + 1 DR |
|
Hutchinson |
Radiation
profiles with different impurity species, effects on confinement |
2005-066 |
H (physics) PB + 1 DR |
|
Holcomb |
2005-068 |
M (needs plan,
can we make a plasma, pb?) |
|
|
Rowan |
2005-069 |
(mainly pb to
start, low density eventually in transport run) (given
High Priority by transport group) |
|
|
Smick |
New Probe
Diagnostic for the High-Field Side: The WASP (Wall-Acutated Scanning Probe) |
2005-070 |
(combine with
071) |
|
LaBombard |
2005-071 |
H (needs
dedicated time, late startup, no rf) PB + 2 DR |
|
|
Marr |
Development and
Evaluation of Gas Puff CXRS in the Edge and Pedestal Regions |
2005-095 |
M (vary sep, work with 071?) |
|
Ferrara |
2005-074 |
H (mp:startup) 1 PB + 1 DR |
|
|
Stillerman |
2005-075 |
(offline
discussion) |
|
|
Wolfe |
2005-076 |
(offline
discussion) |
|
|
Graf |
2005-078 |
(fully pb, need
fiber from beam view, inner wall view) |
|
|
Whyte |
Improved
hydrogen-to-deuterium changeover using radiative terminations and disruptions |
2005-092 |
H (trig VDE,
late –med in startup) |
|
|
|
|
|
|
|
Ideas and Mini-Proposals from
Previous Years |
|
|
|
|
|
|
|
|
Irby |
Initial Tests of the Boron Injector |
|
MP348a (open) |
|
Scott |
Continued MSE calibration runs
(beam into gas with fields) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|