TRANSP 2290
Run Information
Run Time: t=0.14-1.0s
ICRF Module: TORIC (New nl Controls)
ICRF Power: 3MW @80MHz (Simulated)
ICRF Duration: 0.14-1.0s
LH Module: LSC
LH Power: 2.0MW @n0=2.75,4.0
LH Duration: 0.15-1.0s
Density Profile: Artificial H-mode r/a=0.5, d=5cm
Chi Modification: Yes, NKEMOD=0,-1 and TKEMOD=0.15
Noteworthy Switches: NZONES=20, LEVGEO=6(VMEC6),
QLIM0=15.0, NBOOSM=2, NJSMBOOT=2, NJSMLH=4,
NRAYSLH=50,hLH=0.002,DTMAXG=0.002
* Duplicate of 2277 with reload and newer namelist*
* Duplicate of 2279 testing LSC NCOUPLRLH=7,7,7 *
Comments:
-
A duplicate of 2279, testing a "bug fix" in LSC. 2290 looks identical to 2279 indicating the fix didn't cause any harm.
The image below plots the total current vs time.
Legend:
Total Current: White
Lower Hybrid: Red
Ohmic Current: Green
Bootstrap Current: Blue
The figure below shows the actual power spectrum from the TRANSP output.