Some informal presentations

 

 

 

 

Comparison of various invessel polarizer profiles (Ko)

January 2006

DNB meeting

MSE calibration 2006 and effect of 2 polarizers

January 2006

DNB meeting

Effect of Spherical Aberration on PMT filter

December 2005

DNB meeting

DNB images and size

November 2005

DNB meeting

Comparison of MFLUX to ESC

November 2005

DNB meeting

Shutter problem (MSE data November 4, 2005)

November 2005

DNB meeting

Pictures DNB hitting inner wall (Granetz)

November 2005

DNB meeting

Effect of Variations in PEM retardance (expanded)

October 2005

email only

Effect of Variations in PEM Retardance

October 2005

DNB meeting

WGP analysis Oct 3 expanded

October 2005

DNB meeting

WGP polarizer analysis October 3

October 2005

DNB meeting

Results from WGP study of September 16

September 2005

DNB meeting

 

 

 

MP436 Summary

September 2005

CMod meeting

Test of DNB interlock pyrometer (Grantez)

August 2005

DNB meeting

CAD drawings of MSE (Greg Lee)

August 2005

DNB meeting?

Faraday rotation measurements from July 18

July 2005

DNB meeting

Inferring Faraday Rotation with Wire Grid Polarizer

July 2005

DNB meeting

Summary of DNB visit by Grisham and Von Halle

July 2005

DNB meeting

Recent studies of MSE signals

July 2005

DNB meeting

Effect of Photomultiplier voltage on sensitivity

July 2005

DNB meeting

DNB width measurement (Bravenec)

June 2005

DNB meeting

More WGP tests (Jinseok)

June 2005

DNB meeting

MSE intensity study

June 2005

DNB meeting

WGP lab measurements (Jinseok)

June 2005

DNB meeting

DNB Status and Prognosis

June 2005

meeting

DNB Progress

June 2005

DNB meeting

Early DNB progress

June 2005

DNB meeting

First CY2005 MSE-DNB measurements

May 2005

DNB meeting

Polarizer measurements

May 2005

DNB meeting

Beam width measurement (Bravenec)

May 2005

DNB meeting

Reflections in Kaiser (McDermott)

May 2005

DNB meeting

D2 molecular lines (Yuh)

May 2005

DNB meeting

DNB Heating Evaluation

May 2005

DNB meeting

WGP measurements (Jinseok)

April 2005

DNB meeting

MSE operating guidelines

April 2005

DNB meeting

MSE mirror phase specifications

March 2005

DNB meeting

Pyrometer datasheet

March 2005

DNB meeting?

Beam hitting inner wall (Picture; Granetz)

March 2005

DNB meeting

DNB wall heating

March 2005

DNB meeting

Beam Pressure and Magnetic Field

March 2005

DNB meeting

Revised MSE 2005 Calibration

February 2005

email

Final MSE Calibration Results

February 2005

DNB meeting

MSE Status January 2005

February 2005

PAC Meeting

Summary of Ideas Forum for C-mod PAC

February 2005

PAC Meeting

MSE reproducibility scans

February 2005

DNB meeting

MSE Calibration Preliminary

January 2005

DNB Meeting

CXRS statistics (Hutchinson)

January 2005

DNB meeting

DNB performance summary (Granetz)

January 2005

DNB meeting

MSE reinstall schedule

Dec 2004

DNB meeting

Beam into gas mysteries (Yuh)

Dec 2004

DNB meeting

Quantum calculations of Stark + Zeeman

Nov 2004

DNB meeting

More on CXRS errors (Rowan)

Oct 2004

DNB meeting

DNB presentation (Granetz)

Oct 2004

DNB meeting

DNB attenuation caluculation (McDermott)

Sept 2004

DNB meeting

MSE calibration analysis (Yuh)

Sept 2004

DNB meeting

CXRS statistics and errors (Rowan)

September 2004

DNB meeting

Errors in CXRS Ti and Vphi (McDermott)

September 2004

DNB meeting

CXRS F-port optics (Rowan)

Aug 2004

DNB meeting

Invessel Verdet measurements

Aug 2004

DNB meeting

DNB attenuation processes (Rowan?)

Aug 2004

DNB meeting

MSE spatial resolution and effect on analysis

July 2004

DNB meeting?

More on DNB attenuation (McDermott)

June 2004

DNB meeting

MSE  calibration data (Yuh)

June 2004

DNB meeting

Some MSE data (Yuh)

April 2004

DNB meeting

Filter swap temperature scan

April 2004

none?

MSE filter measurements

April 2004

DNB meeting

DNB development status report (Budker)

April 2004

DNB meeting

MSE calibration (revised)

March 2004

DNB meeting

MSE calibration

March 2004

DNB meeting

MSE calibration

Jan 2004

C-Mod meeting

MSE calibration

Jan 2004

None?

Changes to proposed calibration based on GA

calibration

Dec 2003

DNB meeting

Anomalous fast ion losses in C-Mod (2)

Nov 2003

C-Mod meeting

Anomalous fast ion losses in C-Mod

Nov 2003

C-Mod meeting

MSE signal strength vs dnb current

Nov 2003

DNB meeting

Recent MSE analysis

Sept 2003

DNB meeting

Mueller calculus for measuring MSE intensity

Sept 2003

DNB meeting

Design of MSE calibration jig

Sept 2003

DNB meeting

MSE analysis (sigma pollution)

Aug 2003

DNB meeting

MSE calibration 2003

June 2003

DNB meeting

MSE calibration 2003 (preliminary)

May 2003

DNB meeting

More on apodization effects on MSE analysis

May 2003

DNB meeting

Apodization effects on MSE analysis

May 2003

DNB meeting

Effect of aliasing on MSE analysis

May 2003

DNB meeting

DNB collimating aperture: preconceptual design

April 2003

DNB meeting

DNB size: why it’s bad and what we can do

April 2003

DNB meeting

DNB aperture proposal

Feb 2003

DNB meeting

MSE metal mirrors

Feb 2003

DNB meeting

MSE mirror repair

Jan 2003

DNB meeting

Proposal to use metallic mirrors for MSE

Dec 2002

DNB meeting

Improved noise suppression in MSE analysis

Nov 2002

DNB meeting

MSE stresses

Dec 2002

DNB meeting

q-profile changes due to sawteeth on C-Mod

Oct 2002

Quarterly review

MSE progress

Oct 2002

DNB meeting

 

 

Related presentations

 

 

 

 

 

Why MSE signals are weak

Ko

Sept 2005

DNB meeting

DNB hitting inner wall (pictures)

Granetz

Nov 2005

DNB meeting

Invessel polarizer lab results

Ko

Sept 2005

DNB meeting

DNB width measurements

Bravenec

June 2005

DNB meeting

Wire Grid Polarizer tests

Ko

June 2005

DNB meeting

Wire Grid Polarizer results

Ko

June 2005

DNB meeting

Invessel Verdet measurements

Ko

April 2005

DNB meeting

Video DNB hitting inner wall

 

March 2005

DNB meeting

DNB divergence

 

Jan 2005

DNB meeting

DNB spectrum

 

Jan 2005

DNB meeting

7 amp DNB shot

 

Jan 2005

DNB meeting

55 kev long pulse DNB shot

 

Jan 2005

DNB meeting

50 kev long pulse DNB shot

 

Jan 2005

DNB meeting

Statistical uncertainty of line center …

Hutchinson

Jan 2005

DNB meeting

Analysis of beam into gas

Yuh

Dec 2004

DNB meeting

DNB picture

 

Oct 2004

DNB meeting

DNB picture

 

Oct 2004

DNB meeting

DNB picture top view

 

Oct 2004

DNB meeting

DNB picture source assembled

 

Oct 2004

DNB meeting

DNB picture grids

 

Oct 2004

DNB meeting

DNB picture gun

 

Oct 2004

DNB meeting

Lenin, Bob, and Dexter

 

Oct 2004

DNB meeting

Beam into gas calibration anomalies

Yuh

Sept 2004

DNB meeting

Invessel MSE calibration

Granetz

July 2004

Quarterly review

DNB collision rates

Rowan

August 2004

DNB meeting?

Invessel verdet measurement

?

August 2004

DNB meeting?

Invessel verdet measurement

?

August 2004

DNB meeting?

Invessel verdet measurement

?

August 2004

DNB meeting?

RMI lenses

?

August 2004

DNB meeting?

Verdet invessel shotlist

?

August 2004

DNB meeting?

Verdet invessel shotlist 2

?

August 2004

DNB meeting?

Verdet summary

 

 

DNB meeting?

Invessel MSE calibration (2)

Granetz

July 2004

Quarterly review

DNB attenuation

McDermott

July 2004

DNB meeting

DNB attenuation

Rowan

June 2004

DNB meeting

MSE simulated signals

Yuh

June 2004

DNB meeting?

MSE regressions I2 polar

Yuh

June 2004

DNB meeting?

MSE regressions i2 ratio 20/40

Yuh

June 2004

DNB meeting?

MSE angle difference (mea – input)

Yuh

June 2004

DNB meeting?

Determining L1 position

Ko

June 2004

DNB meeting

DNB status report

 

April 2005

 

MSE filter measurements

Rowan

April 2004

DNB meeting

MSE filter measurements

Yuh

April 2004

DNB meeting

Beam angle vs time

Yuh

April 2004

DNB meeting

Beam angle vs time

Yuh

April 2004

DNB meeting

MSE viewing locations

Yuh

May 2002

none